×
+ All Categories
Log in
English
Français
Español
Deutsch
The top documents of meys-msmt-in-czech
Evaluation methodology for research infrastructures
1.525 views
IPN Metodika project – new concept of the Czech research evaluation
165 views
Summaryreport draft
1.170 views
Draft of the Second Interim Report - R&D governance and funding systems for research in international practice
967 views
Context & key concepts of the new Evaluation Methodology
77 views
BR 4 / Detailed evaluation cost framework
34 views
Draft of the Third Interim Report / Background report 10: The Small Pilot Evaluation – Feedback and Results
74 views
Second Interim Report: 2. The institutional funding system in the Czech Republic
156 views
Second Interim Report: Typology of Research Organisations and Effects of the EM Thresholds
153 views
First Interim report Final_Noted
1.038 views
Reflections on the comments
34 views
First Interim Report: Response to comments from the community on the Draft First Interim Report
1.009 views
Scenarios of PRFS and potential effects
40 views
BR 3 / Bibliometrics on and for the Czech Republic
49 views
Second Interim Report final
1.365 views
Second Interim Report final_notepad
295 views
Second Interim Report: 3. Ex-ante assessment of the proposed funding system
326 views
First Interim Report: Evaluation systems in international practice (country analyses)
838 views
Draft of the Third Interim Report
1.425 views
First Interim Report
2.116 views
Next >