PATNA DAIRY PROJECTFeeder Balancing Dairy Complex, Phulwarisharif, Patna - 801505
Phone-061'2-22si:1ili1T,%:#:,i2:';Fax-2250325
PDP:PUR: l5 3 B Dated: 11 .07 .2070
._1_\
TENDER NOTICE
Sealed Tender is invited form experienced party for Civil Construction work for rigid pavement
(concrete pavement) around main entrance gate of FBD, Patna. The details scope of worl< is
attached herewith as per BOQ. 3",7,t'ot-olnterested parties may be submit their quotation Iatest by tL.01 .2020 by 5.00 pm in sealed envelope
addressed to Managing Director, VPDUSS l.td., Patna super scribing on the top of the envelop Tiles
"Work for rigid pavement (concrete pavement) around main entrance Sate of FBD"
Inc]osure: As above
Note: 1)The rate should be all inclusive FOR FBD
2) Allthe legal document i.e. Photo, lD Proof
Service Tax papers, etc (Xerox is to be enclosed)
Notrice Board, FBD, CFF, HCC
Patnadairy.orgCC:
EST! MATE/Biil Of euantities(BOe)civil construction wolk for rigid pavement(concrete pavement) around
mpin entrance gate of FBD , sr r
s.N0. PARTICULARS OF ITEMS UNIT No. lrENGrH(IN M)
wtDTH(rN M)
HEtGHT(
rN M) QTY"Rate (BSOR
20x8)Amount
Itully automatic batching plant and Itransported to site of work in transit Imixer for a lead up to 10Kms having Icontinuous agitated Imixer,manufactured as per mix Oesign Irf specified grade for reinforced - |:ement concrete work including Ilumping of R.M.C from transit mixer Io site of laying,excluding the cost of I:entering,shuttering,finishing and Ieinforcement but including the cost ofldmixtures in recommended
Iroportions as per lsrglO3 to Iccelerate/retard setting of Irncrete,improve workability without Inparing strength and durability as perfirection of the Engineeer.M25 Sraae Irinforced cement concrete by using Il0kg of cement per cum of I
rncrete.Atl works upto plinth levet. I
l.II
\
1..1 Rigid Pavement (ConcretePavement) around main gate CUM 1 13 8.5 0.15 1.6.5751.2 Fou ndation ro, sslgsiifiliffiiE
CUM 1 0.8 0.8 1..2 o.768(eage no.-aa,ESz:JTotal Qty. L7.343 5542 96L74.9061.1 I Extra for proviUing;nd' mi^ing
hardening compound of approvedquality as per manufacturer,sspecification in cement concrete
Page no.-197,L6.44 Lltre3.000 49.8 L49.41.2 Providing and fixing in positioffi
moulded joint filler in expansionjoints of 10mm widex50mm deepFroove
eage no.-198,16.45 Pgr cm depthpgr cm width
23s.000 2.3 540.51.3
lProviding and Iaying in positionbitumen hot sealing compound forexpansion joints etc. using grade'A' sealing compound
235.000Ppr cm depthpgr cm width 2 470
Page no.-198,16.46 _
2 providing and fixing reinforcementfor RCC work includingstra ightening,cutting,bending,placing in position and binding allcomPlete for
Unit NO. ITotal
lengthKg/m aty.(ke)
2.7 TMT bars of 10mm2.1.1 ln gate SS gate foundation
main bars Kg 12 3.3s 40.2 0.62 24.9242.L"2 In pavement as main bars Kg 66 8.5 561 o.62 347.820
P-861s.22.78 Total Qty. 372.744 76.7 28589.45482.2 TMT bars of 8mm
2.2.1 ln gate SS gate foundation as
distribution bars Kg 9 3.75 33.75 0.4 13.5002.2.2 ln pavement as distribution
bars Kg 35 13 455 0.4 182.000P-86/s.22.7A Tota! Qty. 195.500 77.4 L573L.7
3 Hydraulic excavator of capacity1 cum bucket
3.1
For excavation of earth aroundpillar and lifting purpose ofexisting main gate pillar
Hour 3 3
P-Z,CODE NO.-05I+GST+15% Contractorprofit Total Qty. 3 1016 3048
3.2 Hire and running charges ofmobile crane
Day 0.3 0.3
P-I,CODE NO.-037GST+15% Contractorprofit Total Qty.
0.3 9525 2857.5
4 Carriage Charge Rs 50114.031TOTAL ESTIMATED COST= L970L5.502
TOTAL ESTIMATED COST(Say)= L970L6
ln words-One Lakh Ninty Seven Thousand Sixteen Only
NOTE:-Quoted rate should neither be less than 10% of the totalestimated cost of BOQ nor it should be more than 10% of thetotal estimated cost of BOQ.
IAGREE & READY TO DO THIS WORK1.O ON THE GIVEN B.O.Q RATE %
2.O ABOVE THE B.O.Q RATE(PRESENT) o//o
3.O BELOW THE B.O.Q RATE(PRESENT) %
Signature of client Signature of contractor
I