Sanitation Study and wastewater collection system conceptual design
for Beita Town
byHamadalla Alsayyed
Shehada Dweikat
under the direction of Dr. Sameer Shadeed
2011-2012
INTRODUCTION
Sanitation situation reflects the development of communities.
Health of people is also related to the sanitation situation.
Existing of sewerage system consider an indication of a good sanitation situation.
Beita is not served by a sewerage system.
Introduction
Identify the existing sanitation situation.
Identify the water supply system and sanitation problems.
Conceptual design of wastewater collection system.
Project Objectives
Project Location
Methodology
Data Collection
Questionnaire
Municipality Citizens
Analyze Data
AutoCad Civil 3D
SewerCad
STUDY AREA
Topography
Population Design year for the sewerage system is
2040.
Forecasting population using: Pn = P0
Year Growth rate % Population
2010 - 1000
2010-2020 3 13439
2020-2030 2.8 17713
2030-2040 2.6 18185
Mean Monthly Temperature
Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.0
5
10
15
20
25
30
Monthly Rainfall
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec.0
20
40
60
80
100
120
140
160
The main source is from Mekorot company.
Several springs
Water Source
QUESTIONNAIRE
Questionnaire was developed to collect information needed.
It was include:
• Household information • water consumption • waste water• Solid waste• General health and hygiene
Questionnaire
Sampling
Sample size is 70.
Average number of family members is 7.
Average size of cesspit is 32.5 m³.
Average volume of solid waste is 5 kg/day.
60% have a cistern, while 40% does not.
Data Analysis
WATER DISTRIBUTION SYSTEM
Beita is served by WDN since 1996.
The state of WDN is good.
The Avg. lost is 32%.
The adequacy of water
Water Distribution System
11%
74%
15%
excellentmediumweak
Water Consumption
Average Monthly Rate
GENERAL HYGIENE SITUATION
The hygiene situation is good.
General Hygiene and Sanitation
Solid Waste The amount of disposal solid is 20 ton/day.
700 gm solid waste per capita.
The number of containers in general is enough.
Landfill ground is rocky and contains large pits.
Status of landfill is very bad.
The waste is burn in unhealthy way.
Landfill
Wastewater discharge using cesspits.
95% is percolating and 5% is septage.
Trucks are used to emptying from cesspits.
Disposal of Wastewater
Sewerage Collection System
Look !!!
Separate system from storm water is used.
Side of the network.
System characteristics
The design per capita water consumption to 120 l/c.d.
Quantity of waste water is 75 % of the consumed water.
Wastewater Production
Population Density
The Area Area Description Current Density(Capita/dunum)
predicted Density(Capita/dunum)
1 Beita alfouqa 21 25
2 Beita altahta 30 35
3 Beer quza 6 15
4 Almahfrah 6 15
Velocity range 0.6 – 6 m/s.
Minimum diameter 200 mm.
slope range 1% -12 %.
Cover range 0.8 – 5 m.
Design Criteria
Design of Sewerage System
Design Program
Supplementary Program
Design Steps
Network Layout
Total number of manholes is 1146.
Total length of pipes is 33.739 km.
The diameter of pipes vary between 200 mm and 300 mm
Total number of outfalls is 3.
93% of the town is served.
Sample Calculation
Profile
Outfalls
Number of outfall Inflow (m3/d)
1 720
2 2100
3 3180
CONCLUSION&
RECOMMENDATION
Sewerage collection systems is conventional gravity type.
Sewer outfalls and trunk mains design sized for the future development.
The pipes material used is uPVC.
Maximum distance between manholes ≤ 50 m.
Conclusion
Surveying points for roads instead of contour map.
Areas not served may use individual house connection.
Use pumps to transfer the wastewater to WWTP.
Recommendation
Thank you