Pre-Excavation Grouting in Hard Rock Tunnelling
AGS (HK) 1-day Seminar on Grouting and Deep Mixing
7 June 2014
By Knut F. Garshol
PresenterPresentation NotesGood Morning Everybody!
Your interest in the subject of PEG is much appreciated, so let us get started without wasting your time
2
Headlines of this Presentation:
1. Why Ground Water Control?
2. Selection of Grout Mix
3. Pre-Excavation Grouting, Execution Steps
4. Special Aspects of PEG
5. Project Reference HATS 2A 1. Grouting Results 2. Summing Up HATS2A
6. CONCLUSION
Why Ground Water Control?
Rock material is impermeable
GW contained in discontinuities
GW is migrating on conductive channels
Groundwater Movement in Rock
4
Jointed Rock
Massive Rock
Fault Zone
Conductivity contrast is an important factor in GW control considerations
PresenterPresentation NotesPlease Note: Rock is different to Soil!!
Conductive channels within joint plane or along crossing of joint planes.
Surface Settlement
Underground Safety and Working Conditions
Environmental Impact
Effects of GW Ingress
5
6
Water in-rush at tunnel face
1 ton
PresenterPresentation NotesExamples of what can happen if probe drilling and PEG has NOT been executed!
The 1 ton is just a mental reminder that at 50 bar, if you want to hold back the water pressure in 51 mm diameter borehole, you need a force of about 1000 kp. This kind of hydrostatic pressure is not something to play with. It is seriously difficult and may be dangerous (500 m of water head!).
Avoid such situations
7
Small lake became smaller
Back to normal
14 km Gardermoen Tunnel, Oslo, Norway
PresenterPresentation Notes14 km Gardermoen Tunnel, Oslo NorwayMajor media-circus Extensive Post-groutingSupplemented by permanent water re-charge
1st Joint Venture: Excavated 5% of 24.5 km Stopped by Water ingress Settled in Court New tender process
Stage 1 finished by the new Contractors, BUT. With substantial delays
Stage 2A: Drastically changed compared with Stage 1
Experience from HATS Stage 1
8
Manual handling of drill rods & packers
9
HATS Stage 1
Avoid Post Grouting!
10
HATS Stage 1
D&B Advantage: Drill Jumbo
11
HATS Stage 2A Probe hole hitting 15 bar water channel
Risk of major water in-rush practically eliminated
Gives basically dry working conditions in tunnels
Substantially improved stability in poor ground
Less water to pump to surface
Improved conditions for permanent lining works
Benefits of GW-Control:
12
PresenterPresentation NotesIF PEG has to be done to prevent surface settlement, these Benefits are free BONUS
Selection of Grout Mix
Ground water control
Ground stability improvement
Sometimes: A combination of the above
Requirements for success:
Purposes of Grouting
14
A suitable grout must be injected into the ground, penetrating a sufficient ground volume to achieve
the targeted effects
Basic Grouting Problem in rock
15
Traditionally, locally available OPC w/c-ratio 3.0 to 1.0 mostly with Bentonite Unstable grout that needs "grout to refusal Low-quality and poor durability grout
Today, use of micro cement w/c-ratio 1.0 and lower Stable and thixotropic grouts (no bleeding) Bentonite replaced by admixtures
Selection of Grout-Mix
16
High w/c-ratio gives lots of water to pump
High bleeding requires "pump to refusal" Gives extreme materials spreading, locally No cement enters finer cracks in first step, due to
clogging before pressure increase
Practically complicated (variation of w/c-ratio)
Conclusion: Time consuming
Traditional Technology Disadvantages
17
Stable, low viscosity, fixed w/c-ratio grout Allows dual stop criteria for injection
Maximum pressure or maximum quantity per hole
Allows high output and pressure from start Gives simultaneous penetration of small and large cracks and openings
Conclusion: Time saved
New Technology Advantages
18
Always the Primary grout material
Used as a suspension in water w/c-ratio typically between 0.45 1.5 (by weight)
Wide range of additives and admixtures
Wide range of cement types and properties
Permeation capability depends on: Particle size of the cement used Viscosity (and cohesion) of the suspension Pressure stability of the suspension
Generally about Cement
19
Marsh Funnel Viscosity
20
Mud Balance
21
W/C-ratio = 1.0 mix
Water-Cement Ratio
22
Control by Mud Balance
Pressure Stability
23
Initial and final set time
Strength development
Final strength of injected grout
Stability and durability in the ground? 17 projects, 59 km of tunnel:
Average 37% ingress reduction (during 10 years)
Other important properties
24
Pre-Excavation Grouting Execution Steps
Drill & Blast with PEG
26
Probe Ahead
Blasting
Temporary Support
Scaling, Mucking and Geological Mapping
Measure Water Inflow
Pre-Excavation Grouting
After every 4th blast (typically)
Systematic Probe Drilling PEG if triggered
Minimum 5 m overlap (more in poor ground)
Grouting Stop Pressure 60-80 bar If not reached Stop on Quantity
Stable Micro Fine Cement Grout, Only
Colloidal Silica (where needed)
Overlap provides tight bulkhead for next probe drilling and PEG fan VERY important
27
Execution Steps
Probe Holes Grout Holes Control Holes
Tunnel Cross-Section
Number of holes depend on tunnel span (1-1.5 m c/c).
Grout hole length (15 to 33 m). Lookout distance (5.5 m).
Schematic Layout of Drilling Pattern
Grout Hole Pattern
28
29
Advance approx. 4 m
29
Construction Method Drill & Blast + PEG
30
Rod Magazine
(EXAMPLE) Tamrock TRH rod-handling-system
Automatic Rod Handling
Compared with manual rod handling:
Double drilling output
AND
Improved Safety
PresenterPresentation NotesAutomatic Rod Handling will double the drilling output AND improve work safety.
HATS2A Example: This is highly recommended when you have to drill more than 420 km of boreholes for GW control.
31
Equipment Set-up - Simplified
Colloidal Mixer
Agitator
High-Pressure Grout Pump
Packer Electronic Flow and Pressure Recording
32
Contract 23 Unigrout Atlas Copco
Contract 24 AMV / Hny
3 Pumps and 3 Grout Lines Each
The Real Deal
PresenterPresentation NotesHATS2A Example: For pumping of over 5000 tons of cement and large quantities of CS, proper equipment is crucial!
Microfine Cement Colloidal Silica
0.1
mm
OPC 0.1mm MC 0.03 mm
CS 0.016 m
Grouting Stop Criteria Microfine Cement
Pressure: 60-80 bar Volume 2000 L
Colloidal Silica Pressure: 40 bar Volume 750 L
Colloidal Silica
Microfine Cement Colloidal Silica
33
Grouting Materials
PresenterPresentation NotesPrimary grout material is MFC NO OPC!
CS when further grouting is required and MFC cannot penetrate.
Special Aspects of PEG
Safety of PEG works
35
Disposable Packer designed for 100 bar
Hydraulic working basket
Packers secured by
chain
Disposable Packers & Lances
36
Use of Standpipes in Poor Rock
37
Bag Packers in Poor Rock
38
Project Reference - HATS2A
Sub-Sea Sewage Conveyance Hong Kong
PresenterPresentation NotesLet us start with the
Harbour Area Treatment Scheme Stages 1 and 2A
40
North Point
Aberdeen
Sai Ying Pun
Stonecutters Island
LEGEND
Outfall Tunnels (Completed) HATS Stage 1 Sewage Tunnels (Completed) HATS Stage 2A Sewage Tunnels
PresenterPresentation NotesSlide shows Kowloon & HK Island: Densely populated and built up!
Stage 1 of the sewage Project consisted of 24.5 km of mostly TBM excavation and was completed over 10 years ago.
The yellow circle shows the TKO-area: Surface settlements encountered due to high GW ingress to the tunnel
Stage 1 experienced Several face collapses in shear zones, costing many months of delay. Primary reason: Hydraulic collapse or erosion.
Stage 2, the yellow line consists of 20 km of D&B excavation, currently 95% excavated.
HATS 2A Overview
41
North Point
Stonecutters Island
Sai Ying Pun
Vertical shafts: 13 Total Tunnel Length: 20 km
Victoria Habour
Contract 23
Contract 24
PresenterPresentation NotesStage 2 is split in 2 Contracts as shown.
In addition to the 20 km of tunneling, there are 13 vertical shafts.
Settlement Sensitive Reclaimed Land
42
North Point
Sai Ying Pun
LEGEND
Coastline of Year 2005 HATS 2A Tunnels
Aberdeen
HONG KONG ISLAND
PresenterPresentation NotesA lot of reclaimed land along the N-coast of HK-Island increases the risk of surface settlement and damage by GW drawdown.
Depth Below Sea Level
43
North Point Wan Chai East Central
Sai Ying Pun Sandy Bay
Cyberport
Wah Fu
Aberdeen
Appx. 70 msl Appx. 120 msl
Appx. 150 msl To Stonecutters Island
North Point to Aberdeen
Crossing of Victoria Harbour
LEGEND Sea Soil Rock Appx. 140 msl
Victoria Habour
Stonecutters Island Sai Ying Pun
PresenterPresentation NotesWill show the rock types on next slide!
Major Rock Types Encountered in HATS 2A Tunnels
44
Granitic Rock 66% of tunnel length Medium Grained Granite 50-percentile UCS = 180 MPa
Volcanic Rock 34% of tunnel length Predominantly Volcanic Coarse
Ash Crystal Tuff with subordinate Fine Ash Tuff
50-percentile UCS = 240 MPa Highly variable joint intensity
and orientation
Granite 66%
Tuff 34%
Geological Map of Hong Kong (CEDD/GEO 2006)
Granite/Tuff Contact Zone
Tuff
Granite
45
Granite/Tuff Contact Zone
T T G
G
G T
Distribution of Residual Ingress Limits
46
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
45.0
50.0
5 15 30 50
L/min/100 m tunnel
Perc
ent o
f Tun
nel L
engt
hIn granite In tuff
PresenterPresentation NotesThis slide shows the 4 Residual Ingress Limits on the horizontal axisAndHow they are applied along the tunnelSPLIT on sections in Granite and Tuff
These limites were established based on numeric modelling and the risk level of surface settlement.
For Granite, 40% fall within the relatively relaxed limit of 50 L/min/100 m. This is because of the 4 km of low-risk (regarding settlement) tunneling crossing beneath Victoria Harbour.
The relative tunnel lengths in Granite and Tuff are almost the same for the 15 and 30 L/min/100 m limits.
The excavation length in Tuff within the strictest ingress limit is about 3X greater than for tunnel sections in granite.
As a result, tunnel sections in Tuff faced more demanding PEG-Works because of 1) Higher degree of rock jointing and 2) 3X longer section within strictest ingress limit.
Grouting Results
Residual Ingress to Excavated Tunnels
48
Rock Type Granite Avg L/min/100 m
Tuff Avg L/min/100 m
Maximum Ingress Limit 30.2 16.9
Actual Residual overall ingress 6.5 7.5
Sections within limit (92%) 4.5 6.0
Sections failed (8%) 45.3 21.6
Average values Weighted against tunnel length
PresenterPresentation NotesFirst: The Measured ingress to excavated tunnel sections!
In Granite: Very Wet & Very Dry Sections
49
LEGEND HATS 2A Alignment
Tunnel section 413 m long: Measured ingress from all 1st stage grout holes: = 9,200 L/min/100 m tunnel Measured after excavation: About 1.0 L/min/100 m (= 99.99% reduction) Cement Consumption: 1549 kg/m (= 5.7 X the granite average)
Tunnel section about 1500 m: Almost dry (hardly any PEG required) Cement Consumption < 50 kg/m
PresenterPresentation NotesIllustration of the wide range of conditions encountered!
Probe Drilling in the Wet section
50
1200 L/min 15 bar pressure
PresenterPresentation NotesNote that excavation into the same channel without grouting => Would easily produce 5X more GW ingress (6 m3/min).
Filled Open Joints
51
Filled Open Joints - Detail
52
20 MPa UCS
PresenterPresentation NotesNote the brittle fracturing of the MFC grout illustrating the high compressive strength.
Early grout strength is Important for prevention of blow-out when excavating into treated area.
13 September 2013
Practically Dry Tunnel
53
Summing Up HATS2A
Micro Fine Cement ONLY, supplemented by Colloidal Silica
Verification of result by Control Holes before further excavation
Tight face bulkhead is a Must especially in soft ground
27% of tunnel length required < 5 L/min/100 m tunnel
92% of excavated tunnels well below ingress limits
The Tuff required 78% more drilling ahead AND 3.7 X more Colloidal Silica than in Granite
Two Main Reasons for the Success: D&B excavation Modern PEG technology + Re-measurable quantities for payment
55
Summing Up HATS2A
PresenterPresentation NotesBasis for Success Reasons Claim:
Stage 1: Several face collapses and months in delay, caused by problems of drilling necessary holes and outdated grouting technology. Settlement problems on surfaceStage 2: Zero face collapse problems. Ingress limits basically satisfied. Zero settlement problems on surface.
CONCLUSION
CONCLUSION
57
Technology for Ground Water Control by PEG for Practically Dry Tunnels is currently available
In Hard Rock Tunnelling:
Very Strict Ingress Limits will require: Excavation by Drill and Blast
Micro Fine Cement Colloidal Silica
knut.garshol@gmail.com
Pre-Excavation Grouting in Hard Rock TunnellingHeadlines of this Presentation:Why Ground Water Control?Groundwater Movement in RockEffects of GW IngressWater in-rush at tunnel face Avoid such situationsExperience from HATS Stage 1Manual handling of drill rods & packersAvoid Post Grouting!D&B Advantage: Drill JumboBenefits of GW-Control:Selection of Grout MixPurposes of GroutingBasic Grouting Problem in rockSelection of Grout-MixTraditional Technology DisadvantagesNew Technology AdvantagesGenerally about CementMarsh Funnel ViscosityMud BalanceWater-Cement RatioPressure StabilityOther important propertiesPre-Excavation Grouting Execution Steps Drill & Blast with PEGExecution StepsGrout Hole PatternSlide Number 29Automatic Rod HandlingEquipment Set-up - SimplifiedThe Real DealGrouting MaterialsSpecial Aspects of PEGSafety of PEG worksDisposable Packers & LancesUse of Standpipes in Poor RockBag Packers in Poor RockProject Reference - HATS2AHarbour Area Treatment Scheme Stages 1 and 2AHATS 2A OverviewSettlement Sensitive Reclaimed LandDepth Below Sea LevelMajor Rock Types Encountered in HATS 2A TunnelsSlide Number 45Distribution of Residual Ingress LimitsGrouting ResultsResidual Ingress to Excavated TunnelsIn Granite: Very Wet & Very Dry SectionsProbe Drilling in the Wet sectionFilled Open JointsFilled Open Joints - DetailPractically Dry Tunnel Summing Up HATS2A Summing Up HATS2ACONCLUSIONCONCLUSIONSlide Number 58