0C1-050 · 0c1-050 concept issue not for construction--dm rj 102 401 rct 0c1-050 102- 401_ rct_...

Post on 04-Aug-2020

8 views 0 download

transcript

BOUNDARY

BO

UN

DA

RY

BO

UN

DA

RY

BO

UN

DA

RY

BOUNDARY

BO

UN

DA

RY

BOUNDARY

BUILDING B01BUILDING B02

BUILDING B04

BUILDING B05

BU

ILD

ING

B03

E97.00

E97.00

E96.00E95.00

E94

.00

E96.00

E95

.00

E94

.00

E93

.00

E92

.00

E91.00

E92.00

E93.00

COLLEGIUM AVENUE

STR

AD

A C

RE

SE

NT

BR

AN

DO

N P

AR

K D

RIV

E

BOUNDARY

BO

UN

DA

RY

BO

UN

DA

RY

P1P2

P3

P9P10P11

P12

P8P7 P6

P5

P4

P13

300 DIA 300 DIA

300

DIA

600

DIA

600

DIA

450 DIA 375 DIA 300 DIA 300 DIA

300

DIA

300 DIA300 DIA

300

DIA

GROUND LEVEL DRAINAGE INCLUDINGSEEPAGE TO BE GRAVITY FED TO

DETENTION SYSTEM

GROUND LEVEL DRAINAGE INCLUDINGSEEPAGE TO BE GRAVITY FED TO

DETENTION SYSTEM

GR

OU

ND

LE

VE

L D

RA

INA

GE

INC

LUD

ING

SE

EP

AG

E T

O B

E G

RA

VIT

Y F

ED

TO

DE

TEN

TIO

N S

YS

TEM

12m WIDE x 30m LONG x 1.1m DEEPUNDERGROUND DETENTION TANK

FORM SWALE IN LANDSCAPINGTO DIRECT OVERLAND FLOWAROUND BUILDINGS

PUMP SYSTEM TO DISCHARGE SEEPAGEWATER AND RAMP RUNOFF.

GROUND LEVEL DRAINAGE TO BE GRAVITYFED TO DETENTION SYSTEM

PUMP SYSTEM TO DISCHARGE SEEPAGEWATER AND RAMP RUNOFF.

GROUND LEVEL DRAINAGE TO BE GRAVITYFED TO DETENTION SYSTEM

300

DIA

450

DIA

450

DIA

P14

P15

P16

P17

P18

ORIFICE TO CONTROL PIT TORESTRICT DISCHARGE TO PSD

EA

SE

ME

NT

E-1

EASEMENT E-1

EASEMENT E-1

EA

SE

ME

NT

E-1

450 DIA

450

DIA

P19

EXISTING 375 DIA PIPE TO BE UPGRADEDTO NEW 450 DIA RCP UNDER ACADAMY AV

BREAK INTO EXISTING COUNCIL SEPAND MAKE GOOD

Ex SEWERPIT

Ex SEWERPIT

Ex SEWERPIT

Ex SEWERPIT

Ex SEWERPIT

Ex SEWERPIT

E91.00

E90.

00E8

9.00

E88.00

E87.00

E86.00E85.00

E85.00

E86.00E87.00

E88.00E89.00

E90.00

Ex SEPEx SEP

Ex SEP

Ex SEP

Ex SEP Ex SEP Ex SEP

Ex SEWERPIT Ex SEWER

PIT

Ex

300

DIA

Ex PIT

Ex PIT

Ex PIT

Ex POLE Ex POLE Ex POLE

Ex POLE

Ex SEP

Ex 450 DIAACADEMY AVENUE

GENERATOR

NEW CONCRETE CROSSOVERCONSTRUCTED TO MONASH CITYCOUNCILS REQUIREMENTS

EXISTING VEGITATION TO REMAINPROTECT DURING CONSTRUCTION

PARALLEL CARPARKING TO COLLEGIUM AVENUEFRONTAGE CONSTRUCTED IN ACCORDANCE WITHMONASH CITY COUNCILS REQUIREMENTS

NEW CONCRETE CROSSOVERCONSTRUCTED TO MONASH CITYCOUNCILS REQUIREMENTS

PARALLEL CARPARKING TO COLLEGIUM AVENUEFRONTAGE CONSTRUCTED IN ACCORDANCE WITHMONASH CITY COUNCILS REQUIREMENTS

POWER KIOSK

EXISTING VEGITATION TO REMAINPROTECT DURING CONSTRUCTION

INTERNAL DRAINAGE ALIGNMENT INDICATIVE ONLYTO BE CONFIRMED

Designed

TITLE

CLIENT

Melbourne Sydney Geelong

Level 10, 620 Bourke StreetMelbourne Victoria 3000t +61 3 8600 9700 e projects@adamseng.com.au w www.adamseng.com.au

These drawings plans & specifications and the copyright therein are the property of Adams Consulting Engineers Pty. Ltd. & must not beused, reproduced or copied wholly or in part without the written permission of Adams Consulting Engineers Pty. Ltd. All rights reserved.

COPYRIGHT c 2015

Drawing Revision

Project Leader

Project Director

Drawn

Certified

Sheet Size

Printed

North

Project No.

Stage No.

Block No.

Sheet No.

Amendment

PDF Name

Int Project No. 140213

C

21/07/2016 1:14:32 PM

C

LEVEL 1 AND SITE DRAINAGE PLAN

RE

TIR

EM

EN

T V

ILLA

GE

, 6 -

30 B

RA

ND

ON

PA

RK

DR

IVE

, WH

EE

LER

S H

ILL

0C1-050

CONCEPT ISSUENOT FOR CONSTRUCTION

-

-

DM

RJ

102

401

RCT

0C1-050

102- 401_ RCT_ 0C1-050 C.PDF

SCALE 1 : 500

GROUND FLOOR GENERAL ARRANGEMENT PLAN

DETENTION REQUIREMENTS:

PSD=385L/s (USING CONTROL PIT)DETENTION VOLUME = 400m³ (USING UNDERGROUND TANK)

NOTE:DETENTION REQUIREMENTS ARE TENTATIVE ONLY AND TOBE CONFIRMED AT DESIGN DEVELOPMENT STAGE.

PITNo.

TYPEINTERNAL

DIMENSIONS L x W (mm)

SURFACELEVEL (m)

DEPTHINLET PIPE

FROM DIA IL

OUTLET PIPE

DIA ILCOVER TYPE

PIT SCHEDULE

P1 - - -GP 96.10600 x 600 300 TBC

P2 P1 300 TBCGP 96.10600 x 600 300 TBC

P3 P2 300 TBCGP P94.80600 x 600 300 TBC

P4 - - -GP 96.10600 x 600 300 TBC

P5 P4 300 TBCGP 96.10600 x 600 300 TBC

P6 P5 300 92.00GP 93.60600 x 600 300 92.00

P7 P3 300 91.00GP 92.60600 x 600 375 91.00

P6 300

P8 P7 375 90.10GP 91.60600 x 600 450 90.10

P9 - - -GP TBC600 x 600 300 TBC

P10 P9 300 TBCGP TBC600 x 600 300 TBC

P11 P10 300 92.80GP 93.50600 x 600 300 92.80

P12 P8 450 89.60GP 91.40600 x 600 600 89.60

P11 300 89.60

P13 P12 600 89.30GP 90.70600 x 600 600 89.30

P14 - - -GP 600 x 600 300 TBC

P15 P14 300 88.50GP 90.30600 x 600 450 88.50 CONTROL PIT

TANK 600 88.50

P16 P15 450 83.90JP 87.80600 x 600 450 83.90

P17 P16 450 83.20JP 85.30600 x 600 450 83.20

P18 P17 450 82.95JP 84.40600 x 600 450 82.95

P19 P18 450 TBCJP TBCEXISTING Ex TBC

ISSUE REVISION DATE

A CONCEPT ISSUE 04/11/15

B CONCEPT ISSUE 19/11/15

C CONCEPT ISSUE 21/07/16