Near-term machine performance— The next 5 years, before e-cooling —
Wolfram FischerRun Coordinator for RHIC Run-4
Open Meeting on RHIC PlanningBerkner Hall
3 December 2003
Wolfram Fischer 2
Enhanced luminosity
• Enhanced Luminosity Goals (before e-cooling)
– For Au-Au, average per store (4 design)
L = 81026cm-2s-1 at 100GeV/u
– For p-p average per store, 2 IRs (16 design)
L = 61031cm-2s-1 at 100GeV
L = 1.51032cm-2s-1 at 250GeV
with 70% polarization
Wolfram Fischer 3
Contents
1. Assumptions for projections
2. Limitations and improvements• Injectors• Luminosity and background• Time at store
3. Run-4
4. 5-year projections
5. Summary
Wolfram Fischer 4
RHIC Collider Projections
[annual updates based on experience gained in the previous run]
Wolfram Fischer 5
Assumptions for projections
• 2 weeks for cool-down, 1 week for warm-up• For each mode (Au-Au, p-p, d-Au, etc.)
– 2 weeks of set-up [only machine operation]
– 3 weeks of ramp-up [machine operation with experimental set-up during owl shift]
– Continuous luminosity development in production[over 14 weeks during the day]
• Minimum and maximum projections– Minimum repeats demonstrated performance– Maximum requires completion of improvement projects– Maxima ambitious, likely outcome between min and max
• For 5-year luminosity projections– 5+14 weeks of operation in each mode– Only 2 collisions in p-p operation
Large penalty for frequent mode switches
Wolfram Fischer 6
Collider performance comparisons
14 wks
14 wks
M. Lamont
14 wks
Common features - long runs (>14 wks/yr)- non-linear increase after shut-downs- many years for substantial increases
RHIC is of comparable complexity!
Wolfram Fischer 7
Limitations (1) – injectors
• Bunch intensity and polarization– Achieved: Au 0.7109/bunch 10m 0.3eV·s
• Booster low level rf upgrade
• Additional bunch merge 1.3 109/bunch
– Achieved: p 0.81011/bunch 10m 0.3eV·s 40% pol.
– Achieved: p 2.01011/bunch 20m 0.5eV·s 20% pol. ?
• AGS warm helical snake in Run-4 40% pol. in RHIC
• AGS cold helical snake in Run-5 70% pol. in RHIC
• Later– New solenoid for polarized source
– 2nd AGS cold helical snake?
• EBIS (Electron Beam Ion Source)
– Earliest 2008, see presentation by J. Alessi
Wolfram Fischer 8
Limitations (2) – luminosity and background
• Vacuum problems with high intensities Test of NEG coated beam pipes (low SEY, pumping) Solenoids
• Losses during ramp Better orbit, tune, coupling, chromaticity control PLL tune meter, tune feedback
• Experimental background Secondary collimators (½ this year, ½ next) Shielding (PHENIX, BRAHMS this year)
• Instabilities Improved chromaticity control, coherence monitor Transverse damper
• Intra-beam scattering (Au-Au) Stochastic cooling development e-cooling for RHIC II
Wolfram Fischer 9
Limitations (3) – time in store
• Reduction of quench occurrences Reduce abort kicker pre-fires Avoid excessive beam losses
• Improve operational efficiency Faster down ramps (gain about 2 days/run) More automation at beginning of store (steering, collimation, gap cleaning) Better software tools for ramp tuning Faster injection set-up
• Reduce system downtime Eliminate ice ball maintenance at current leads Improve corrector power supply reliability Improve AtR reliability
• …
Wolfram Fischer 10
Run-4 goals
• President’s budget allows for 27 weeks of cryogenic operation (need 3 weeks for cool-down and warm-up)
• Run-4 modes:
1. 5+14 weeks Au-Au at 100GeV/u beam energy,target luminosity of 300(b)-1 delivered
2. 5 weeks p development(partial warm AGS snake, gas jet, working point)
Wolfram Fischer 12
Current status RHIC Run-4
• 5-week start-up/ramp-up period started on Monday 12/1/03
• Reached 0.8·109/bunch in Blue on Monday
• Blue: Injected 111 bunches with 0.5·109/bunch (pressure rise in bi8 and bo2, up to 10-6 Torr)
• Yellow: Injected 111 bunches with 0.1·109/bunch (no pressure rise observed)
• First ramps this morning– 6 bunches each
– 50% Blue transmission
– 40% Yellow transmission
Today at noon
Wolfram Fischer 13
Projected 5-year Au-Au luminosity evolution
Assume- 14 weeks production in every year- linear luminosity increase during run- 4 experiments- completion of improvements
achieved projectedmaximum
Wolfram Fischer 14
Projected 5-year p-p luminosity evolution
Assume- 14 weeks production in every year- linear luminosity increase during run- only 2 experiments- completion of improvements
achieved projectedmaximum
Wolfram Fischer 15
Major RHIC improvements
Injectors
Luminosity and background
Time in store
New things to be filled in as we understand the machine better
Wolfram Fischer 16
Summary
• Enhanced Luminosity Goals (before e-cooling)
– For Au-Au, average per store (4 design)
L = 81026cm-2s-1 at 100GeV/u
– For p-p average per store, 2 IRs (16 design)
L = 61031cm-2s-1 at 100GeV
L = 1.51032cm-2s-1 at 250GeV
with 70% polarization
• Required– Sufficient running time in each mode [many weeks/year]
– Resources to carry out improvement projects