1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV...

Post on 12-Jan-2016

245 views 0 download

transcript

1

RHIC Machine/Detector Planning Meeting9 May 06

Agenda

– SPECIAL TOPICS:

• Schedule for the 62 GeV pp run

• What is preferred order of beam species for RUN07? – first thoughts

– Scheduling Physicist (Brown) - Scheduling issues

– Experiment Progress/Issues - STAR, PHENIX, (BRAHMS)

– Jet Target Progress/issues - (Makdisi)

– Machine Issues - (Ptitsyn)

– AGS beam polarization progress report/polarimeter status – (Huang)

– RHIC Polarimeters (Bravar) – issues

– RHIC Beam Experiments – (Pilat)

– RCF (Throwe) – issues

Planning Meeting Web Site: http://www.c-ad.bnl.gov/esfd/RMEM_06/rhic_planning.htm

2

Experiment Goals (in progress)

s Pol. Config. Recorded L Delivered L Pol weeks

PHENIX: 200 GeV Radial 4-7 pb-1 10-17 pb-1 ≥ 50% 3-4# 200 GeV Longitudinal 10 pb-1 30 pb-1 ~ 60% 7 62.4 GeV Transverse 0.6 pb-1 1.4 pb-1 any 2 *22 GeV 4 nb-1 10 nb-1

STAR: 200 GeV Transverse 5 3 pb-1 15 pb-1 ≥ 50% ~ 4 200 GeV Longitudinal 10 pb-1 30 pb-1 ≥ 50% ~7 62.4 GeV Transverse 0.5 pb-1 0.5 pb-1 ≥ 2

BRAHMS: 62.4 GeV Transverse 0.85 pb-1 1.4 pb-1 ~ 50% 2

• Not in present plan• # with 50-60% pol, end with 4 weeks of operation or 4-7 recorded pb -1, whichever comes first

3

Run6 RHIC p^p^ Integrated Luminosity for Physics

0.02.04.06.08.0

10.012.014.016.018.020.022.024.026.028.030.0

4-M

ar

11

-Ma

r

18

-Ma

r

25

-Ma

r

1-A

pr

8-A

pr

15

-Ap

r

22

-Ap

r

29

-Ap

r

6-M

ay

date

Inte

gra

ted

Lu

min

os

ity

[p

b^

-1]

STAR

PHENIX

min

max

current as of 5/8/06

STAR Transverse Goal(15 pb-1 delivered)

STAR transverse pol begins

4

Run6 RHIC p^p^ Integrated Luminosity for Physics

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

50.0

55.0

60.0

4-M

ar

11

-Ma

r

18

-Ma

r

25

-Ma

r

1-A

pr

8-A

pr

15

-Ap

r

22

-Ap

r

29

-Ap

r

6-M

ay

13

-Ma

y

20

-Ma

y

27

-Ma

y

3-J

un

date

Inte

gra

ted

Lu

min

os

ity

[p

b^

-1]

STAR

PHENIX

min

max

current as of 5/8/06

PHENIX longitudal Goal(30 pb-1 delivered)

“11” weeks in Physics mode

PHENIX long pol begins

5

Run6 RHIC p^p^ Integrated Luminosity for Physics

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

50.0

55.0

60.0

4-M

ar

11

-Ma

r

18

-Ma

r

25

-Ma

r

1-A

pr

8-A

pr

15

-Ap

r

22

-Ap

r

29

-Ap

r

6-M

ay

13

-Ma

y

20

-Ma

y

27

-Ma

y

3-J

un

date

Inte

gra

ted

Lu

min

os

ity

[p

b^

-1]

STAR

PHENIX

min

max

current as of 5/8/06

STAR longitudal Goal(30 pb-1 delivered)

“11” weeks in Physics mode (STAR)

STAR long pol part 2 begins (plan)STAR long pol part 1 ends

6

5/9/06

# protons in RHIC vs date

0

20

40

60

80

100

120

140

160

25

-Fe

b-0

6

4-M

ar-0

6

11

-Ma

r-06

18

-Ma

r-06

25

-Ma

r-06

1-A

pr-0

6

8-A

pr-0

6

15

-Ap

r-06

22

-Ap

r-06

29

-Ap

r-06

6-M

ay-0

6

13

-Ma

y-06

Av

era

ge

pro

ton

s in

ea

ch

rin

g x

1011

7

PHENIX ZDC Rate vs date

0

5000

10000

15000

25-Feb-06

4-Mar-06

11-Mar-06

18-Mar-06

25-Mar-06

1-Apr-06

8-Apr-06

15-Apr-06

22-Apr-06

29-Apr-06

6-May-06

13-May-06

ZD

C R

ate

PHENIX ZDC (Initial)

PHENIX ZDC (+3 hrs)

5/9/06

8

Phenix Initial ZDC Rate vs Protons in RHIC

0

2000

4000

6000

8000

10000

12000

14000

0 20 40 60 80 100 120 140

Protons in RHIC, Blue/Yellow Average x 1011

Init

ial

PH

EN

IX Z

DC

Rat

e

5/9/06

9

5/9/06

Luminosity loss 3 hrs into store vs date

0.0%

10.0%

20.0%

30.0%

40.0%

50.0%

60.0%

70.0%

80.0%

90.0%

100.0%

25

-Fe

b-0

6

4-M

ar-0

6

11

-Ma

r-06

18

-Ma

r-06

25

-Ma

r-06

1-A

pr-0

6

8-A

pr-0

6

15

-Ap

r-06

22

-Ap

r-06

29

-Ap

r-06

6-M

ay-0

6

13

-Ma

y-06

% L

um

ino

sit

y L

os

s

10

5/6/06

pp RUN05-06, hours at store

0

100

200

300

400

500

600

700

800

900

1000

0 2 4 6 8 10 12

Weeks in Physics mode

To

tal

Ho

urs

RUN05

RUN06

11

pp RUN05-06, PHENIX Integrated Luminosity (delivered)

0

5

10

15

20

25

30

35

40

45

0 7 14 21 28 35 42 49 56 63 70 77 84

PHENIX Days in Physics mode

Inte

gra

ted

Lu

min

osi

ty (

pb

-1)

RUN05

RUN06

5/8/06

12

RHIC Run 6 - For Discussion

Plan A (present plan): • 5 Jun: end 200 GeV run, begin 22 GeV test run• 6 Jun: end 22 GeV test run, begin 62 GeV run• 20 Jun: end 62 GeV run, begin 500 GeV development• 26 Jun:  end RHIC operations with beam•  Plan B (proposed): • 5 Jun: end 200 GeV run, begin 22 GeV test run• 6 Jun: end 22 GeV test run, begin 500 GeV development• 12 Jun: end 500 GeV development, begin 62 GeV run • 26 Jun:  end RHIC operations with beam

5/9/06

13

RHIC Run 6 - For Discussion

A short history (from my Tuesday meeting notes): Date                           62 GeV Start Date  through 4/18          5/28    (with usual caveats)

4/25                          6/1      (added 4 days to schedule as a result of unscheduled shutdown - flag the we needed to "revisit the schedule")

5/2                            6/6      (added another 4 days to the schedule, maxing out possible calendar days for RHIC Run 6 and scheduled the 22 GeV test run before 62 GeV run - raised issue that we should consider moving the 62 GeV run to the end to minimize the possible negative impact of the Accelerator Conference on the 500 GeV development run)

5/9                            6/6 vs 6/12

5/9/06

14

RHIC Machine/Detector Planning Meeting

Archive

15

Run6 RHIC p^p^ Integrated Luminosity for Physics

0.02.04.06.08.0

10.012.014.016.018.020.022.024.026.028.030.0

4-M

ar

11

-Ma

r

18

-Ma

r

25

-Ma

r

1-A

pr

8-A

pr

15

-Ap

r

22

-Ap

r

29

-Ap

r

6-M

ay

date

Inte

gra

ted

Lu

min

os

ity

[p

b^

-1]

STAR

PHENIX

min

max

current as of 5/8/06

PHENIX Radial Goal (min)10 pb-1 delivered

PHENIX long pol begins

16

BNL Energy Use FY 2005-6(C-AD Bldg 911 power is in AGS-Exp/Mach)

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

40.00

45.00

50.00

31

-Ma

r-0

4

31

-Ma

y-0

4

31

-Ju

l-04

30

-Se

p-0

4

30

-No

v-0

4

31

-Ja

n-0

5

31

-Ma

r-0

5

31

-Ma

y-0

5

31

-Ju

l-05

30

-Se

p-0

5

30

-No

v-0

5

31

-Ja

n-0

6

31

-Ma

r-0

6

31

-Ma

y-0

6

Date

Da

ily A

ve

rag

e P

ow

er

(MW

)

$-

$10

$20

$30

$40

$50

$60

$70

$80

$90

$100

$110

$/M

Wh

r

RHIC Cryo RHIC other AGS-Mach

Tandem Booster AGS-Exp

NSRL CAD Bldg Site Base

Peak-Av $/MWhr

As of 30 Apr 2006

17

RHIC Run 6 as run/revised plan• 1 Feb – Cool-down begins• 7 Feb – 1st beam in blue ring• 12 Feb – 1st beam in yellow beam• 5 Mar – Machine Physics Mode declared (4.6 weeks into run)• 8 Mar – PHENIX in Physics Mode – radial pol (5 weeks into run – on schedule)• 12 Mar – STAR in Physics Mode – long pol (5.6 weeks into run)• 12 Mar – begin 11.0 weeks of s=200 GeV pp (0.6 weeks behind schedule)• 6 Apr – STAR switch to trans pol• 14 April – unscheduled shutdown (incr. power use at ~50% of full operations)• 21 April – unscheduled shutdown ends – lost ~ 7 days• 22 April –PHENIX back on (lost 8 days)• 24 April – STAR back on (lost 10 days)• 26 Apr – PHENIX completed radial polarization, switched to longitudal• 10 May – STAR switch to longitudal polarization (plan)• 5 Jun – end 11.0 weeks s=200 GeV pp, begin s=22 GeV development• 6 Jun - begin setup s=62 GeV pp – add BRAHMS• 20 Jun – end 2 week s=62 GeV pp, begin s=500 GeV development• 26 Jun – end s=500 GeV development, begin warm-up to LN2

• 29 Jun – RHIC Cryo switch to LN2 complete, end 21.1 weeks of cryo operation

5/9/06

18

The 14.5 week pp “physics” plan, Run6

s = 200 GeV/c (1st 11 weeks)

s = 62.4 GeV/c (next 2 weeks)

– 2 weeks physics• STAR Transverse• PHENIX Transverse• BRAHMS Transverse

s = 500 GeV/c (last 1 week)

– Machine Development

• 0.5 week contingency, use to be determined

19

RHIC Run 6 Original Plan• 1 Feb – Begin cool-down• 8 Mar –Physics Mode for machine and experiments (5 weeks into

run)• 8 Mar – begin 11 weeks of s=200 GeV pp• 24 May – end 11 weeks s=200 GeV pp• 24 May begin setup s=62 GeV pp• 7 Jun – end 2 week s=62 GeV pp• 7 Jun – begin 1 week s=500 GeV pp development• 14-18 Jun – Contingency (end 14.5 weeks “Physics”)• 18 Jun – begin cyro warm-up • 21 Jun – RHIC Cryo warm-up complete, end 20.0 weeks of cryo

operation

20

RHIC Run 7 – first look at possible run plan

• PHENIX– Long Au-Au run at s=200 GeV/n– pp development, especially for s=500 GeV

• STAR– d-Au at s=200 GeV/n– pp development

21

11 physics weeks at 200 GeV, (20 weeks cryo operation)

STAR/PHENIX Goals - Transverse

STAR Goal - Longitudal

22

2 physics weeks at s = 62.4 GeV

PHENIX and BRAHMS Goal

23

http://www.c-ad.bnl.gov/esfd

AGS-Booster-Tandem/Linac Startup

RHIC Cryo Cooldow/Warm-up

RHIC Cryo Operation

RHIC Cryo off

RHIC Systems Test (no colliding beams)

RHIC Colliding Beams

RHIC Research with 100x100 GeV pp

RHIC Research with 31x31 GeV pp

RHIC 250x250 GeV pp development

NSRL (NASA Radiobiology)

Shutdown (RHIC)

C-A Operations-FY06

Program Element Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

FY 2006

30 Jan 06

setup/ramp up luminosity

The Plan

20 weeks

Sep

schedule to be determined

1 Feb

21 Jun

14.5 weeks

Commissioning

Contingency

0.5 Week Cont'when to use TBD

24

http://www.c-ad.bnl.gov/esfd

AGS-Booster-Tandem/Linac Startup

RHIC Cryo Cooldow/Warm-up

RHIC Cryo Operation

RHIC Cryo off

RHIC Systems Test (no colliding beams)

RHIC Colliding Beams

RHIC Research with HI

RHIC Research with pp

RHIC 250x250 GeV pp development

NSRL (NASA Radiobiology)

(NASA Schedule to be determined)

Shutdown (RHIC)

C-A Operations-FY07

Program Element Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

FY 2006

14 Mar 06

setup/ramp up luminosity

34 week Draft Plan

34 weeks

Sep

concurrent with RHIC

16 Oct 11 Jun

28.5 weeks

Commissioning

Contingency

species, energy and/or schedule TBD

25

1.7

6.0

5.6

0.2

2.52.7

1.5

2.8

1.0

1.8 1.8

6.4

5.3

2.63.1

1.6

2.9

1.2

1.9

26.1102.2105.410.253.368.543.386.671.9 84.0

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

3/05 to 3/11

3/12 to 3/18

3/19 to 3/25

3/26 to 4/01

4/02 to 4/08

4/09 to 4/15

4/16 to 4/22

4/23 to 4/29

4/30 to 5/06

5/07 to 5/13

period

inte

gra

ted

lu

mn

ios

ity

[p

b^

-1]

0

20

40

60

80

100

120

Run 6 (p^p^) -- Integrated Luminosity by week

ho

urs

pe

r w

ee

k a

t s

tore

Phenix STAR (lumi) hours at store

current as of 5/08/06

26

1.9

0.3

0.7

1.1

1.3

1.7 1.7

0.8

1.7

1.2

1.6

0.3

0.91.0

1.2

1.6 1.6

0.7

2.1

1.1

79

96

76

89

101 101 104107

71

80

0.0

0.5

1.0

1.5

2.0

2.5

4/16 to 4/22

4/23 to 4/29

4/30 to 5/06

5/07 to 5/13

5/14 to 5/20

5/21 to 5/27

5/28 to 6/03

6/04 to 6/10

6/11 to 6/17

6/18 to 6/24

period

inte

gra

ted

lu

mn

iosi

ty [

pb

^-1

] (l

on

git

ud

inal

p

ola

riza

tio

n)

0

20

40

60

80

100

120

Run 5 (p^p^) -- Integrated Luminosity by week

ho

urs

per

wee

k at

sto

re

Phenix STAR hours at store