11 - Peter Kerr...~102,000 km circuit wire 254,920 km2 The SWIN ~861,000 poles & towers 17,047 GWh...

Post on 04-Nov-2020

1 views 0 download

transcript

Peter Kerr

Executive Manager- Growth6 June, 2018

EDM# XXXXXXXX

~102,000km circuit wire

254,920 km2

The

SWIN

~861,000poles & towers

17,047GWhelectricity transported

About Western Power

• Build, maintain & operate transmissionand distribution assets: South WestInterconnected Network (SWIN)

• 1.1+ million customers

• ~264,000 street lights

• ~228,000 solar PV installations*

• ~465 battery systems*

* As at 1/2/182

We’re Sorry

3

And we’ve changed…

Engineer

4

19th/20th Century Intelligent Asset Equation

Intelligent Asset

=

Customer

5

21st Century Intelligent Asset Equation

Intelligent Asset=

People Data

+ +

6

Unlocking available power

• Looking at links to West Kal Terminal

• Piccadilly

• Parkeston

• Boulder

• Mungari

• Black Flag

7

Finding solutions

8

Virtual Power Plants

• Decentralised energy is playing an expanding role

• VPP technology is still in its infancy

• State Government has announced a study and Western Power is keen to test its application

• Potential application in the Goldfields for:

• deferral of expensive augmentation

• voltage management, improved supply

• peak demand support, freeing capacity for industry loads

9

Evolving our physical assets• Changing customer needs, evolving technologies

• Addressing reliability challenges

• Introducing more innovation to improve reliability & control costs

• Developing services,products to meetcustomer needs