Post on 22-Jan-2020
transcript
2.8m
13.82m
6.00m
6.2m
6.3m
1.2m 2.0m
3.2m
2.9m
3.0mm
3.1mm
3.1mm
1.7m
2.3m
5.4m 5.9m 5.9m 5.9m 5.9m 5.4m
6.0m
EX. CEDAR HEDGETO REMAIN
NEW CEDAR HEDGE TO MATCHEXISTING HEIGHT (4.5 - 5.5m)
6.0m (TYP.)
60-90cmSPACING
TO10
TO10
TO10
FD1
FD1
FD1
FD1 FD
1
FD1
FD1
JW10
6.5m
TO10
JW10
JW10
JW10 JW
10JW10
JW10
BM10 BM
7
BM9 BM
14 BM11 BM
8
BM9 BM
14
TH12
hh12 ms
8 hh12
ms8
hh14
ms10
1210 ms
8
tp14
TH7
tp12
TH6
tp14
TH7
tp6
TH5
3R
5R 3R
3R
3R1R
BM9 BM
6
BM8 BM
13
hh10 ms
7 hh12
ms8
tp10
TH5
TH12
tp12
TH6
2R 2R
3R3R 3R3R
3R
3R3R
3R
3R3R
SOD (6m²)
QA1
TH11
QM1
QR1
0 5 metres SOD (6m²)
75mm min.
WATER AND MULCH PLANTS IMMEDIATELY FOLLOWING PLANTING. SHRUBS TO BEPLANTED AT THE SAME LEVEL AS PREVIOUSLY PLANTED IN NURSERY, ALLOWINGFOR SETTLEMENT. PLANTING ON 3:1 SLOPE, CREATE TEMPORARY 100mm HIGH SOILMIX BERM ON DOWNHILL SIDE OF PLANTING PIT TO RETAIN WATER.
CUT AND REMOVE ALL SYNTHETIC AND TREATED TWINE/ROPE.
PLANT STOCK WITH A GIRDLED ROOT SYSTEM WILL BE REJECTED AND SHALL BEREPLACED WITH APPROVED PLANT STOCK AT THE CONTRACTOR'S EXPENSE
REMOVE POT OR TOP 12OF BURLAP AND/OR WIRE BASKETON ROOT BALL
75mm SHREDDED PINE MULCH (SPM)
100mm HIGH TEMPORARY TOPSOILBERM AROUND PLANTING PITSPECIFIED PLANTING MEDIUM
PREPARED PLANTING BED TO SPECIFIED DEPTH(SEE PLANTING BED PREPARATION NOTES)
COMPACTED PLANTING MEDIUMSCARIFY ALL SIDES AND BOTTOMOF TREE PITUNDISTURBED SUBGRADE
250mmmin.
150mmmin.
REMOVE WRAP FROM TRUNKAND INSPECT FOR DAMAGE
STAKES NOT TO BE INSTALLED ONBALLED OR BURLAPPED TREES
BACKFILL IN 150mm (6 in.) LIFTS AND LAMP TO REVENT AIR POCKETS
ADD SANDY LOAM SOIL IF ADDITIONAL BACKFILL ISREQUIRED. SOIL TO CONSIST OF:
50-60% SAND20-40% SILT6-10% CLAY2-5% ORGANIC MATTER7.5 pH OR LESS
TREE SHALL BEAR SAME RELATION TO GRADEAS BORE TO IT'S PREVIOUSLY EXISTING GRADE. PLANTTREE 100-150mm ABOVE FINISHED GRADE TO ALLOW FORSETTLEMENT
PRUNE ONLY AS NECESSARY TO REMOVE DEAD,BROKEN AND DISEASED BRANCHES ACCORDING TOSTANDARD HORTICUTURAL PRACTICES. PRESERVE THENATURAL FORM AND CHARACTER OF THE PLANT. DONOT CUT THE LEADER.
DETAIL FOR DECIDUOUS TREE PLANTINGFOR 50mm CALIPER TREES OR GREATER
NOTE:
FORM A SOIL SAUCER 125mm (5") IN DEPTH AND FILLWITH WATER. SOON AFTER WATER HAS BEENABSORBED, COVER WITH APPROXIMATELY 100mm(4") OF SHREDDED PINE MULCH (SPM) TAPERED TOGROUND LEVEL AT THE TRUNK
CAREFULLY REMOVE ANY LOOSE SOIL AROUND TRUNK,TOP OF ROOTBALL SHOULD NOT BE DISTURBED ORCOVERED WITH SOIL
ENSURE THAT TREES DO NOT DRY OUT PRIOR TO PLANTING. STORE PLANTS IN ASHADED LOCATION.
WATER AND MULCH TREE IMMEDIATELY FOLLOWING PLANTING.
PLANT SLIGHTLY HIGHER THAN PREVIOUSLY PLANTED IN NURSERY TO ALLOW FORSETTLEMENT.
COMPACT PLANTING SOIL WITH WATER PRESSURE ALONE TO PREVENTOVERCOMPACTION AND SETTLEMENT FOLLOWING PLANTING.
FOR PLANTING ON SLOPES, CREATE A 100mm HIGH SOIL MIX BERM ON DOWNHILLSIDE OF PLANTING PIT TO RETAIN WATER.
CUT AND REMOVE ALL SYNTHETIC AND TREATED TWINE/ROPE.
PLANT STOCK WITH A GIRDLED ROOT SYSTEM WILL BE REJECTED AND SHALL BEREPLACED WITH APPROVED PLANT STOCK AT THE CONTRACTOR'S EXPENSE
NOTES:
BACKFILL WITH SPECIFIED PLANTING SOIL MIX. SOAKBACKFILLED AREA TO ENSURE FULLCONTACT BETWEEN ROOTBALL AND BACKFILL
LOOSEN AND SCARIFY ALL SIDESAND BOTTOM OF TREE PIT
COMPACTED OR UNDISTURBED SUBGRADE
CUT, LOOSEN, AND REMOVE 12 OFTWINE, BURLAP AND WIRE ON ROOTBALL
FINISHED GRADE
REMOVE WRAP FROM TRUNKAND INSPECT FOR DAMAGE
STAKES NOT TO BE INSTALLED ONBALLED OR BURLAPPED TREES
BACKFILL IN 150mm (6 in.)LIFTS AND LAMPTO REVENT AIR POCKETS
ADD SANDY LOAM SOIL IFADDITIONALBACKFILL IS REQUIRED.SOIL TO CONSIST OF:
50-60% SAND20-40% SILT6-10% CLAY2-5% ORGANICMATTER7.5 pH OR LESS
TREE SHALL BEAR SAME RELATION TO GRADEAS BORE TO IT'S PREVIOUSLY EXISTING GRADE. PLANTTREE 100-150mm ABOVE FINISHED GRADE TO ALLOW FORSETTLEMENT
DETAIL FOR DECIDUOUS TREE PLANTINGFOR 50mm CALIPER TREES OR GREATER
NOTE:
FORM A SOIL SAUCER 125mm (5") IN DEPTH AND FILLWITH WATER. SOON AFTER WATER HAS BEENABSORBED, COVER WITH APPROXIMATELY 100mm(4") OF SHREDDED PINE MULCH (SPM) TAPERED TOGROUND LEVEL AT THE TRUNK
ENSURE THAT TREES DO NOT DRY OUT PRIOR TO PLANTING. STORE PLANTS IN ASHADED LOCATION.
WATER AND MULCH TREE IMMEDIATELY FOLLOWING PLANTING.
PLANT SLIGHTLY HIGHER THAN PREVIOUSLY PLANTED IN NURSERY TO ALLOW FORSETTLEMENT.
COMPACT PLANTING SOIL WITH WATER PRESSURE ALONE TO PREVENTOVERCOMPACTION AND SETTLEMENT FOLLOWING PLANTING.
FOR PLANTING ON SLOPES, CREATE A 100mm HIGH SOIL MIX BERM ON DOWNHILLSIDE OF PLANTING PIT TO RETAIN WATER.
CUT AND REMOVE ALL SYNTHETIC AND TREATED TWINE/ROPE.
PLANT STOCK WITH A GIRDLED ROOT SYSTEM WILL BE REJECTED AND SHALL BEREPLACED WITH APPROVED PLANT STOCK AT THE CONTRACTOR'S EXPENSE
NOTES:
BACKFILL WITH SPECIFIED PLANTING SOIL MIX. SOAKBACKFILLED AREA TO ENSURE FULLCONTACT BETWEEN ROOTBALL AND BACKFILL
LOOSEN AND SCARIFY ALL SIDESAND BOTTOM OF TREE PIT
COMPACTED OR UNDISTURBED SUBGRADE
CUT, LOOSEN, AND REMOVE 12 OFTWINE, BURLAP AND WIRE ON ROOTBALL
CAREFULLY REMOVE ANY LOOSESOIL AROUND TRUNK, TOP OFROOTBALL SHOULD NOT BEDISTURBED OR COVERED WITH SOIL
FINISHED GRADE
PLANTS TO BE SELECTED ANDMAINTAINED AS UNSHEARED SPECIMEN
3315 Tallmast Cres. Mississauga ON L5L 1K1416-557-9298 | sb@treeandravine.comwww.treeandravine.comContact: Sebastian Bravo, ISA Certified Arborist
Tree and Ravine Inc.
231 - 237Rebecca StreetOakville, Ontario
General Notes
The Contractor is to carefully review the site in conjunctionwith the plans, details and specifications prepared for theproject and report any discrepancies or need for clarificationto the Project Manager before proceeding.
The Contractor is to check and confirm property boundaries inthe field.
The Contractor is to confirm the location of all subsurfaceutilities before any excavation work.
The Contractor is to confirm extent of demolition beforeproceeding.
All surplus materials and debris is to be removed from thesite.
The Contractor is responsible for any damages to private orCity property caused by their forces or Sub-contractors.
Tree and Ravine Inc. - #16018 - 06 Sep
temb
er 2017
THIS DRAWING IS THE PROPERTY OF TREE AND RAVINE INC. ANDSHALL NOT BE COPIED OR ELECTRONICALLY ALTERED WITHOUTWRITTEN AUTHORIZATION
ww
w.treeand
ravine.com
1 06 Sept 2017 Large Scale Landscape Plan AW SB
1:100
AW
SB
Oct. 2016
#16018
ByDateNo. Description Ck.
L1Sheet No
Landscape PlanTitle
Revision PLEASE MARK VOID ALL SUPERCEDED COPIES
Scale
Drawn
Checked
Date
Job No
PLANTING SCHEDULE
ALL EXISTING GRADES AT PROPERTY LINES ARE TO BEMAINTAINED IN COMPLIANCE WITH SECTION 9.14.6.1OF THE ONTARIO BUILDING CODE. THIS SITE IS TO BEGRADED SO THAT WATER WILL NOT ACCUMULATE ATOR NEAR THE BUILDING UNDER CONSTRUCTION ANDWILL NOT ADVERSELY AFFECT ANY ADJACENTPROPERTIES.
PLANTING SCHEDULE NOTES:
All substitutions (including subspecies and cultivars) to the list are to be approved by the Project Managerprior to shipment to the site. All plants are to be laid out on site with the Project Manager present.
Not all of the plants on the list are shown on the plan.
If there is a discrepancy between the quantities on the Planting Schedule and those on the plan, thePlanting Schedule shall be assumed to be correct. All substitutions to the Plant List are to be approvedprior to shipment to the site.
LANDSCAPE NOTES:- ALL DISTURBED LANDSCAPE AREAS TO BE SODDED- ALL PLANTING BEDS TO BE COVERED WITH 3" OF SHREDDED PINE MULCH (SPM)
ExistingDeciduous Tree
ExistingCedar
Legend
Property Line
ProposedDeciduousTree
Proposed Plant SpeciesPlant KeyQuantity
EH1
ProposedCedar
ProposedYews
ProposedForbs/Groundcover
SHRUB PLANTING DETAIL
LARGE DECIDUOUS TREE PLANTING DETAIL
LARGE EVERGREEN TREE PLANTING DETAIL
1L1
NTS
2L1
NTS
3L1
NTS
Project