2011 CSIA Investment Promotion Conference(class 4, Argentina)

Post on 17-Jun-2015

163 views 0 download

Tags:

transcript

Life begins with Li

Valioso Incorporated.

30402 YoungShin Kim 30408 YoungHeun Pyo30436 EunSeo Park 30443 HyunTaek Jung

30445 HyunSoo Ryu

Table of ContentsTable of Contents

1. Introduction about Argentina

2. Relationship with Korea

1. Introduction about Valioso Inc.

2. Main Projects

- Salar del Hombre Muerto

- Pascua Lama

I. Introduction

II. Main Body

III. Conclusion

I. 1. Introduction about ArgentinaI. 1. Introduction about Argentina

Agriculture in ArgentinaAgriculture in Argentina

I. 1. Introduction about ArgentinaI. 1. Introduction about Argentina

Livestock Industry in ArgentinaLivestock Industry in Argentina

I. 1. Introduction about ArgentinaI. 1. Introduction about Argentina

Construction in ArgentinaConstruction in Argentina

I. 1. Introduction about ArgentinaI. 1. Introduction about Argentina

I. 1. Introduction about ArgentinaI. 1. Introduction about Argentina

GDP Growth RateGDP Growth Rate

I. 1. Introduction about ArgentinaI. 1. Introduction about Argentina

I. 2. Relationship with KoreaI. 2. Relationship with Korea

Investment

DiplomacyDiplomacy

Economic

Partnership

Economic

Partnership

Natural re-

sources

Agriculture

Trade

I. 2. Relationship with KoreaI. 2. Relationship with Korea

Investment

DiplomacyDiplomacyEconomic

Partnership

Economic

Partnership

Inter-govern-

mental cooper-

ation

Trade

I. 2. Relationship with KoreaI. 2. Relationship with Korea

Investment

DiplomacyDiplomacy

Economic

Partnership

Economic

Partnership

International

cooperation

between en-

terprises

Trade

II. 1. Introduction about Valioso Inc.II. 1. Introduction about Valioso Inc.

II. 1. Introduction about Valioso Inc.II. 1. Introduction about Valioso Inc.

II. 1. Introduction about Valioso Inc.II. 1. Introduction about Valioso Inc.

II. 2. Main ProjectsII. 2. Main Projects

CHILECHILE

BOLIVIABOLIVIA

ARGENTINAARGENTINA

II. 2. Main ProjectsII. 2. Main Projects

Salar del Hombre Muerto

II. 2. Main ProjectsII. 2. Main Projects

Salar del Hombre Muerto

II. 2. Main ProjectsII. 2. Main Projects

Energy Storage (Lithium Battery)Energy Storage (Lithium Battery)

II. 2. Main ProjectsII. 2. Main Projects

Current Lithium Uses

Batteries (27%)Aluminum Processes (33%)Glass & Ceramic (17%)Others(23%)

II. 2. Main ProjectsII. 2. Main Projects

2006 20100

5000

10000

15000

20000

25000

30000

35000

Lithium Production in Argentina

Lithium Production

II. 2. Main ProjectsII. 2. Main Projects

II. 2. Main ProjectsII. 2. Main Projects

Proprietary Alumina Absorption System(PAAS)

II. 2. Main ProjectsII. 2. Main Projects

Estimation-Lifespan of or more- by 2020-more than of profit per year (in 2010: 63 million dollars)

75 yearsDoubled production

50 million dollars

II. 2. Main ProjectsII. 2. Main Projects

2010 2015 20200

5000

10000

15000

20000

25000

30000

Lithium Production in Hombre Muerto

Lithium Production in Hombre Muerto

II. 2. Main ProjectsII. 2. Main Projects

Pascua Lama

CHILECHILE

ARGENTINAARGENTINA

II. 2. Main ProjectsII. 2. Main Projects

Pascua Lama

II. 2. Main ProjectsII. 2. Main Projects

2000 2005 2006 20090

100

200

300

400

500

600

700

800

900

1000

PriceDemand

Price and Demand of Gold

II. 2. Main ProjectsII. 2. Main Projects

Estimation-Lifespan of- of gold & of silver -Intergovernmental support from

and

20-25 years0.8 million ounces35 million ounces

Argentina, Chile,

South Korea

III. ConclusionIII. Conclusion

Expertise• 26 years of experience

-Managing risks expertly

Innovation

• Innovative technology

-Proprietary Alumina Absorption

System (PAAS)

Vision

• Promising natural resources

(lithium, gold)

• Strong governmental support

Your In-vestment

Right Now

Q&AQ&A

LIFE STARTS WITH LITHANK YOU