2011/07/07 North Anna 3 COL Hearing - FW: Slides for the ... · To: Roy, Tarun; Patel, Chandu Cc:...

Post on 22-Jul-2020

0 views 0 download

transcript

1

PMNorthAnna3COLPEmails Resource

From: Patel, ChanduSent: Thursday, July 07, 2011 2:40 PMTo: 'Marc Hotchkiss'Cc: NorthAnna3COL Resource; Roy, Tarun; Graizer, VladimirSubject: FW: Slides for the meeting with Dominion

Marc, This will help our discussion tomorrow. Please distribute to your participants. Chandu _____________________________________________ From: Graizer, Vladimir Sent: Thursday, July 07, 2011 12:03 PM To: Roy, Tarun; Patel, Chandu Cc: Cook, Christopher; Karas, Rebecca; Munson, Clifford Subject: Slides for the meeting with Dominion   Chandu and Tarun, Please find attached few slides that I prepared for the July 8th meeting on North Anna. You can send these slides to the applicant today to let them be prepared. Vladimir

NRC_Graizer_July 2011.pptx

Hearing Identifier: NorthAnna3_Public_EX Email Number: 983 Mail Envelope Properties (8C658E9029C91D4D90C6960EF59FC0D630EA8BCB69) Subject: FW: Slides for the meeting with Dominion Sent Date: 7/7/2011 2:39:40 PM Received Date: 7/7/2011 2:39:47 PM From: Patel, Chandu Created By: Chandu.Patel@nrc.gov Recipients: "NorthAnna3COL Resource" <NorthAnna3COL.Resource@nrc.gov> Tracking Status: None "Roy, Tarun" <Tarun.Roy@nrc.gov> Tracking Status: None "Graizer, Vladimir" <Vladimir.Graizer@nrc.gov> Tracking Status: None "'Marc Hotchkiss'" <marc.hotchkiss@dom.com> Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 557 7/7/2011 2:39:47 PM NRC_Graizer_July 2011.pptx 122568 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:

North Anna, Unit 3Section 2.5.2Section 2.5.2

Vladimir Graizer, Ph.D.Seismologist, NRO

July 8, 2011

1

NRC staff compilation of FSAR Table 2.5-208 with MACTEC boring logs and208 with MACTEC boring logs and

GEOVision S-wave velocity measurements for downholes B-901 B-907 B-909 M10for downholes B-901, B-907, B-909, M10

and M-30 (App. A, B.1, C.1)

2

350B-901

250

300

200

100

150

Vs (App A GEOVision 2007)

50

Vs (App. A, GEOVision, 2007)

FSAR Zones (Table 2.5-208)

Boring Log Zones (MACTEC, 2006)

3

0

0 2000 4000 6000 8000 10000 12000

350B-907

250

300

200

100

150

50

Vs (App. A, GEOVision, 2007)

FSAR Zones (Table 2.5-208)

Boring Log Zones (MACTEC, 2006)

4

0

0 2000 4000 6000 8000 10000 12000

350B-909

250

300

200

100

150

Vs (App. A, GEOVision, 2007)

50

FSAR Zones (Table 2.5-208)

Boring Log Zones (MACTEC, 2006)

5

0

0 2000 4000 6000 8000 10000 12000

350M-10DH

250

300

200

100

150

Vs (App C 1 GEOVision 2009)

50

Vs (App. C.1, GEOVision, 2009)

FSAR Zones (Table 2.5-208)

Boring Log Zones (App.B.1, MACTEC, 2009)

6

0

0 2000 4000 6000 8000 10000 12000

350M-30DH

250

300

200

100

150

Vs (App. C.1, GEOVision, 2009)

50

FSAR Zones (Table 2.5-208)

Boring Log Zones (App. B.1, MACTEC, 2009)

7

0

0 2000 4000 6000 8000 10000 12000