UNDERGROUNDSTORAGE
TANKCLOSURE
8/13/2019 2012 Cupa Ust Closure Presentation Revised
2/85
Presented by :
Brenda ten BruggencateSanta Fe Springs Fire-Rescue
David NorenEBA Group
8/13/2019 2012 Cupa Ust Closure Presentation Revised
3/85
INSPECTORS
PERSPECTIVE
Permits Inspections
8/13/2019 2012 Cupa Ust Closure Presentation Revised
4/85
OTHER TOPICS
open excavationsclean certifications
8/13/2019 2012 Cupa Ust Closure Presentation Revised
5/85
TYPES OF UST CLOSURES
Permanent removal
Permanent-in-place
Temporary
8/13/2019 2012 Cupa Ust Closure Presentation Revised
6/85
CLOSURE VS. REMOVAL
careful with the termlosure when
rem ov l is meant
8/13/2019 2012 Cupa Ust Closure Presentation Revised
7/85
8/13/2019 2012 Cupa Ust Closure Presentation Revised
8/85
8/13/2019 2012 Cupa Ust Closure Presentation Revised
9/85
2010 CFC
105.7.7 - permitrequired to remove,
close, or place an USTinto temporary closure
PERMIT REQUIRED
8/13/2019 2012 Cupa Ust Closure Presentation Revised
10/85
8/13/2019 2012 Cupa Ust Closure Presentation Revised
11/85
UST CLOSUREREQUIREMENTS
23 CCR Art. 7 2670(e) apply for UST closure to LIA within 90 days
once hazardous substance storage has stopped
AND
Submit closure proposal 30 days priorto closure or shorter
Check with LIAMost want one submittal
Process varies
8/13/2019 2012 Cupa Ust Closure Presentation Revised
12/85
H SC 25298 - general
23 CCR Art. 723 CCR 2670 - general to all UST closures23 CCR 2671 - temporary closures23 CCR 2672 (b) - removal23 CCR 2672 (c) - closure-in-place23 CCR 2672 (d) - sampling requirements
2010 CFC 3404.2.13 - temporary & closure-in-place 3404.2.14 removal
Ordinance
UST CLOSUREREQUIREMENTS TYPES
8/13/2019 2012 Cupa Ust Closure Presentation Revised
13/85
WHAT DOES AN INSPECTORLOOK FOR ON A PERMIT?
Tracking of UST and RP
Application that demonstrate compliance withthe law, regs, codes, standards etc.
Names & addressesState UST ID#Contents, size, install date etc.State UST Operating Permit Application - Facilityand Tank Information forms contain a lot of this info
Safe removal or closure (inerting UST)Liquids, sludge, and residuals managed legallySampling to demonstrate if release occurred or not
8/13/2019 2012 Cupa Ust Closure Presentation Revised
14/85
WHAT DOES AN INSPECTORLOOK FOR ON A PERMIT?
Agency specific
Can be written narrativeLevel of detail varies
May be done on prescriptive formsSome LIAs attach standard conditionsExample: SFS Closure Permit
8/13/2019 2012 Cupa Ust Closure Presentation Revised
15/85
Most fieldson this form
are requiredby title 22
Attach Forms A & B
location
Type &proceduresfor closure
description
contractor
certification
RP
8/13/2019 2012 Cupa Ust Closure Presentation Revised
16/85
PERMANENTUST CLOSURE
REQUIREMENTSLG 48-5, Contractor Licensing
A ( all)
B ( construct building)C-36 ( service stations)C-61/D-40 ( < 20K capacity)
andHazardous SubstanceCertification issued by CSLB
B&P 7058.7
8/13/2019 2012 Cupa Ust Closure Presentation Revised
17/85
8/13/2019 2012 Cupa Ust Closure Presentation Revised
18/85
UST CLOSURE
Permit approved now what?
Complete closure within a reasonable amountof time as determined by LIA - 23 CCR 2670(e)
Be aware of Ordinance timelinesSFS 6 months, with possible 6 monthextension
CFC1 year for permanent closures90 days to safe guard temp closures
8/13/2019 2012 Cupa Ust Closure Presentation Revised
19/85
8/13/2019 2012 Cupa Ust Closure Presentation Revised
20/85
TO INSPECT FOR?
PermanentClosure removal
Principalsapply to otherclosure type
8/13/2019 2012 Cupa Ust Closure Presentation Revised
21/85
CFC 106.2
Fire Code Official is authorized to conductinspections to determine compliance with thiscode
Permanent closure by removalTank inert and remove contents, tank, & pipe
TO INSPECT FOR?
8/13/2019 2012 Cupa Ust Closure Presentation Revised
22/85
H SC 25298 23 CCR Art. 7
UST owner/operator shalldemonstrate/document to the Local
Agency
No unauthorized release has occurred, collectsamplesProper disposal (i.e. tank destruction cert)or reuse info
TO INSPECT FOR?
8/13/2019 2012 Cupa Ust Closure Presentation Revised
23/85
8/13/2019 2012 Cupa Ust Closure Presentation Revised
24/85
UPON ARRIVAL
Assess logisticsTraffic hazards
Access in and outHow many people are in removalarea?
Overhead hazards - electricalTank path from pit to truckPlan ahead
Use common sense
8/13/2019 2012 Cupa Ust Closure Presentation Revised
25/85
8/13/2019 2012 Cupa Ust Closure Presentation Revised
26/85
8/13/2019 2012 Cupa Ust Closure Presentation Revised
27/85
UPON ARRIVAL
Find out whos who SupervisorLooky-loosGeologistclean certifier Who is the SiteSafety Officer?
Report safety
concerns to SSO
8/13/2019 2012 Cupa Ust Closure Presentation Revised
28/85
UPON ARRIVAL
Ask where they are in the removal processWhen does your agency require the inspector
to be present?For excavation?For cold cutting?For cleaning?During the clean certification?During removal?During sample collection?
8/13/2019 2012 Cupa Ust Closure Presentation Revised
29/85
UPON ARRIVAL
Verify info submitted on permit
What info is different than site conditions
Has the contractor or subs changed?
Where are they taking the UST?confirm with driver
Where are they taking rinseate?Manifest # or copy
8/13/2019 2012 Cupa Ust Closure Presentation Revised
30/85
UPON ARRIVAL
Ask the contractor their plan and logistics
Is it consistent with the approved permit?
Does it appear reasonable?
Assess and record differences
8/13/2019 2012 Cupa Ust Closure Presentation Revised
31/85
UPON ARRIVAL
Look around the site
Size of crane appropriate?
Condition of lifting cablesor straps
8/13/2019 2012 Cupa Ust Closure Presentation Revised
32/85
Look around the site (cont.) Are the excavation walls stable or loose?
Where are people standing?
8/13/2019 2012 Cupa Ust Closure Presentation Revised
33/85
8/13/2019 2012 Cupa Ust Closure Presentation Revised
34/85
TALK TO GEOLOGIST
Do they know the sampling plan?
Do they have the right sampling equipment?No glass jars for VOCsEPA Method 5035Ice in their chest?
Ask early - may to allow time to acquirethese things should they not have them
8/13/2019 2012 Cupa Ust Closure Presentation Revised
35/85
NOW WHAT?
At this point SFSFR arrives on site towitness the clean certification
8/13/2019 2012 Cupa Ust Closure Presentation Revised
36/85
Residual liquids, sludges, or solids SHALL beremoved from tank and piping and handledhazardous wastes or recyclable materials
Inert possible flammables vapor at STP to levelsthat preclude explosion
22 CCR requires Hazardous Waste Tank ClosureCertification
clean UST or comply with all applicable HWrequirements
PRE-REMOVALREQUIREMENTS
8/13/2019 2012 Cupa Ust Closure Presentation Revised
37/85
8/13/2019 2012 Cupa Ust Closure Presentation Revised
38/85
API 2015
Thisstandarddoes notapply toUSTs
Many safetankcleaning
principalsareapplicable
Also see API2016
8/13/2019 2012 Cupa Ust Closure Presentation Revised
39/85
8/13/2019 2012 Cupa Ust Closure Presentation Revised
40/85
WHAT IS ACLEAN CERTIFICATION
API Publication 2015Intro says this standard does not apply to USTsSafe cleaning principals applyRefers to API 2016Vapors and degassing
Removing sludge and residuesTank cleaningControl of ignition sources
Atmospheric monitors
8/13/2019 2012 Cupa Ust Closure Presentation Revised
41/85
8/13/2019 2012 Cupa Ust Closure Presentation Revised
42/85
WHAT IS ACLEAN CERTIFICATION
NFPA 326 Atmospheric Testing
Combustible gas indicator reading can be incorrect if taken inoxygen deficient environmentCheck instrument specs
Cleaning Methods
Triple rinse (low pressure water)High pressure steamPhysical removal (vacuuming, shovel, absorbing)
Qualifications of person certifying tank atmosphere
All work stops if >10% LEL
8/13/2019 2012 Cupa Ust Closure Presentation Revised
43/85
WHAT IS ACLEAN CERTIFICATION
API Publication 1604
Recommended Practice for the Closure ofPetroleum USTs
8/13/2019 2012 Cupa Ust Closure Presentation Revised
44/85
WEB ADDRESSES FORCLEANING PROCEDURES
API Publication 2015http://publications.api.org/ Register or log in for freeUnder Read -Only Documents select Fire andSafety Protection
Not all API Publications are accessible withoutan account
API 1604 is not free
http://publications.api.org/http://publications.api.org/8/13/2019 2012 Cupa Ust Closure Presentation Revised
45/85
WEB ADDRESSES FORCLEANING PROCEDURES
NFPA 326, 1999 edition
Formerly NFPA 327, 1993 edition
www.nfpacodesonline.org
Need a subscription
http://www.nfpacodesonline.org/http://www.nfpacodesonline.org/8/13/2019 2012 Cupa Ust Closure Presentation Revised
46/85
8/13/2019 2012 Cupa Ust Closure Presentation Revised
47/85
If tank is clean (non-haz)
submit the Hazardous Waste Tank ClosureCertification
Piping and appurtenances must be clean so nopourable contents come out when inverted
UST must be free of product, sludge, debris etc.
UST must be visually inspected
NEXT STEPTANK CLEANING
NON HAZARDOUS
8/13/2019 2012 Cupa Ust Closure Presentation Revised
48/85
NON-HAZARDOUSREMOVAL
Visually inspectThrough manway orCut opening on siteUse non-sparking tools, cold cutting techniques
8/13/2019 2012 Cupa Ust Closure Presentation Revised
49/85
NON HAZARDOUS
8/13/2019 2012 Cupa Ust Closure Presentation Revised
50/85
If a cleaned tank is NOT cut and haspotential to generate flammable vapor
Visually inspect byUse Class I, Div. 1 light with mirror to see inside tan
Other method approved by CUPA
Inert with CO 2 or other inert gasDry ice
NON-HAZARDOUSREMOVAL
8/13/2019 2012 Cupa Ust Closure Presentation Revised
51/85
50 lb bl k i t l 12" 12" 12"
8/13/2019 2012 Cupa Ust Closure Presentation Revised
52/85
50 lb. blocks are approximately 12" x 12" x 12"
10 lb 50 lb
10K UST requires 220 lbs dry ice= 4.4 50 lbs blocks of dry iceSublimates at a rate of 5 to 10 pounds every 24hours when stored in a typical cooler
Much faster on hot days in metal UST
http://www.continentalcarbonic.com/dryicelocations/map.php8/13/2019 2012 Cupa Ust Closure Presentation Revised
53/85
DRY ICE
Allow sublimation to generate CO 2
Use CGI to measure LEL top, center,bottom
Careful! Whats the oxygen conc.?
Plug all hole except 1/8 vent
NON HAZARDOUS
8/13/2019 2012 Cupa Ust Closure Presentation Revised
54/85
NON-HAZARDOUSREMOVAL
Use Hazardous Waste Tank ClosureCertification or acceptable alternativecontaining specific information
8/13/2019 2012 Cupa Ust Closure Presentation Revised
55/85
Required by 2267383.3 (g)
Certify free of product,sludge, etc.
Atmosphere at top,center, bottom
Qualifications of certifier
Date, time, signature
Cert good only at time ofmonitoring
8/13/2019 2012 Cupa Ust Closure Presentation Revised
56/85
UST
8/13/2019 2012 Cupa Ust Closure Presentation Revised
57/85
USTREMOVAL
Ensure clear path frompit to truck
Remove loose dirt
Transport off-site
8/13/2019 2012 Cupa Ust Closure Presentation Revised
58/85
UST REMOVAL
Document to LIA disposition of UST
If disposedDocumentation i.e. tank destruction cert
If destined for reuseCheck with LIA for local requirements
Document to LIA within their requiredtime frame
Name of new owner and new operator of USTLocation of intended use
Nature of intended use
SOIL SAMPLING
8/13/2019 2012 Cupa Ust Closure Presentation Revised
59/85
SOIL SAMPLINGREQUIREMENTS
Must demonstrate no unauthorized release hasoccurred
Must be performed during or immediately after USTclosure activities
Based on soil and (if present in excavation) water
analysis and consistent with approved work plan
Analyze by State-Certified lab for previously storedsubstance(s) and breakdown products or transformationproducts.
SOIL SAMPLING
8/13/2019 2012 Cupa Ust Closure Presentation Revised
60/85
SOIL SAMPLINGREQUIREMENTS
Geological logs shall be prepared bya Professional Geologist or Civil
Engineer
technician working under the directsupervision of one can do this
provided the professional reviewsthe logs and assumes responsibilityfor them. 23 CCR 2649 (b)(1)(D)
SOIL SAMPLING
8/13/2019 2012 Cupa Ust Closure Presentation Revised
61/85
SOIL SAMPLINGREQUIREMENTS
Removal
Minimum 2 below the UST bottom in native soil ateach end of tank
Every 20 linear feet of piping
May include vent and vapor for VPH systems based onchange in piping definitionThis includes sampling under the dispenser
Stockpile sampling (not specified in 23 CCR 2672)
8/13/2019 2012 Cupa Ust Closure Presentation Revised
62/85
8/13/2019 2012 Cupa Ust Closure Presentation Revised
63/85
8/13/2019 2012 Cupa Ust Closure Presentation Revised
64/85
2670(f)
Bus. Prof.
Code 7835
2672(b)(2)(c)(2)
2672(b)(3)(4)
2649(f)(6)HSC
25298.5
2672(c)(1)
Bus. Prof.Code 7835
2649(f)(5) (g)
2649(f)(5) (g)HSC 25298.5
2649(f)(5) (g)
2670(f)
SFSFRrequirement
Needed to de-termine if furtheraction is needed
Professional
Professional
piping & dispensers
PERMANENT UST CLOSURE
8/13/2019 2012 Cupa Ust Closure Presentation Revised
65/85
2 TYPES
Closure-in-place23 CCR 2672(c)
Removal23 CCR 2672(b)
UST
8/13/2019 2012 Cupa Ust Closure Presentation Revised
66/85
USTCLOSURE-IN-PLACE
What justifies leaving UST in place?
Check with Building Dept. & LIA policy
City of SFS requires UST be within a 45
angle of footing of permanent structure
Consider requiring Engineering Report if not
obvious
UST
8/13/2019 2012 Cupa Ust Closure Presentation Revised
67/85
USTCLOSURE-IN-PLACE
Closure-in-place allowed for UST 2
UST 2
BUILDING
UST 1
45
UST
8/13/2019 2012 Cupa Ust Closure Presentation Revised
68/85
Process similar to removal
Clean tank
Legally manage waste
Sampling borings required
Fill with inert solidexception
USTCLOSURE-IN-PLACE
UST
8/13/2019 2012 Cupa Ust Closure Presentation Revised
69/85
USTCLOSURE-IN-PLACE
Exception: if owner intends to reuse tank forstorage of a non-haz substance
Non-haz substance must be compatible withprevious UST use and construction
Check with LIA and Fire Departments on theirrequirements
8/13/2019 2012 Cupa Ust Closure Presentation Revised
70/85
UST CLOSURE-IN-PLACE
Filling with inert solid
Provide proper openings to filling tank withinert material
Use concrete slurry, sand, flowable ash, orfoaming agentEnsure UST buoyancy is offset
UST PIPING
8/13/2019 2012 Cupa Ust Closure Presentation Revised
71/85
UST PIPINGCLOSURE-IN-PLACE
Remove all piping unless it willdamage structures or other pipes
Piping to remaining in place must beemptied of contents and capped
Piping does not have to be filled with an inertsolid, only the UST does
Remove ventBackfill
SOIL SAMPLING
8/13/2019 2012 Cupa Ust Closure Presentation Revised
72/85
SOIL SAMPLINGREQUIREMENTS
Closure-in-place
One or more slant boring as close as possible to themidpoint of the UST OR
Vertical borings drilled along each long dimensionalside of UST OR
Other method as approved by LIACheck approve permit/workplan
8/13/2019 2012 Cupa Ust Closure Presentation Revised
73/85
8/13/2019 2012 Cupa Ust Closure Presentation Revised
74/85
TEMPORARY
USTCLOSURE
8/13/2019 2012 Cupa Ust Closure Presentation Revised
75/85
TEMPORARY
UST CLOSURE
23 CCR 2010 CFC
When storage of HS has ceasedbut the UST will be used again
within 12 months
When UST is taken out of service
Submit proposal 30 days prior toclosure
Safeguard within 90 days
8/13/2019 2012 Cupa Ust Closure Presentation Revised
76/85
TEMPORARY
UST CLOSURE23 CCR 2010 CFCRemove liquid and properly manage it same
Cap and secure pipe, fill line, gauge openings,vapor recovery
same
maintain vents same
Disconnect power to pumps but not cathodicprotection system
Inert to levels that preclude explosions OR lower ifrequired by LIA
UST may be filled with a non-corrosive liquid thatis not a hazardous substance
8/13/2019 2012 Cupa Ust Closure Presentation Revised
77/85
TEMPORARY
UST CLOSURE23 CCR 2010 CFCRemove liquid and properly manage it same
Cap and secure pipe, fill line, gauge openings,vapor recovery
same
maintain vents same
Disconnect power to pumps but not cathodicprotection system
Inert to levels that preclude explosions OR lower ifrequired by LIA
UST may be filled with a non-corrosive liquid thatis not a hazardous substance
TO FILL OR NOT TO FILL?
8/13/2019 2012 Cupa Ust Closure Presentation Revised
78/85
TO FILL OR NOT TO FILL?
Decidingfactors
High
groundwater?Intent andtime frame forreuse?
Consideramount ofwastegenerated
8/13/2019 2012 Cupa Ust Closure Presentation Revised
79/85
TEMPORARY UST
8/13/2019 2012 Cupa Ust Closure Presentation Revised
80/85
TEMPORARY USTCLOSURE
f filled
Non corrosive liquid
Not a hazardous substance
Test liquid and submit results to LIA priorto removing it from UST at end of tempclosure period
UST TEMPORARY
8/13/2019 2012 Cupa Ust Closure Presentation Revised
81/85
CLOSURE
Monitoringrequirements
Can be modifiedby LIA based onneed to detectunauthorizedrelease
Cathodicprotection mustbe maintained
8/13/2019 2012 Cupa Ust Closure Presentation Revised
82/85
UST TEMPORARY
8/13/2019 2012 Cupa Ust Closure Presentation Revised
83/85
CLOSURE
Continue compliance with the followingrequirements:
Repair and record keeping
Release reporting and investigations
Release response and corrective actions
TEMPORARY
8/13/2019 2012 Cupa Ust Closure Presentation Revised
84/85
UST CLOSURE
Options at end of permit term
23 CCR 2010 CFC
12 month extension may begranted if site assessmentperformed
Removal from ground within oneyear for USTs out of service