2017 FACILITY ASSESSMENT BOARD UPDATE

cmiller
Typewritten Text
Handout B
cmiller
Typewritten Text
cmiller
Typewritten Text
cmiller
Typewritten Text
cmiller
Typewritten Text

S C O P E O F W O R K

NON-INVASIVE VISUAL ASSESSMENT AND ASSOCIATED REPORT FOR: • BETTENDORF HIGH SCHOOL

• BETTENDORF MIDDLE SCHOOL

• EDISON ACADEMY

• HERBERT HOOVER ELEMENTARY SCHOOL

• MARK TWAIN ELEMENTARY SCHOOL

• PAUL NORTON ELEMENTARY SCHOOL

• THOMAS JEFFERSON ELEMENTARY SCHOOL

DID NOT INSPECT THE FOLLOWING: • GRANT WOOD ELEMENTARY SCHOOL

• NEIL ARMSTRONG ELEMENTARY SCHOOL

Presenter
Presentation Notes

T E A M C O N F I G U R AT I O N

ASSESSMENT OF INTERIOR FINISHES,

EXTERIOR BUILDING ENVELOPE AND ROOFS.

ASSESSMENT OF MECHANICAL, ELECTRICAL,

PLUMBING, AND FIRE PROTECTION SYSTEMS.

ASSESSMENT OF EXTERIOR HARD SURFACES

SUCH AS PARKING LOTS, SIDEWALKS, ETC.

INVESTIGATION OF POTENTIAL COSTS

RELATED IMPROVEMENTS INDICATED IN

REPORTS.

Presenter
Presentation Notes

EXISTING BUILDING

FACILITY

ASSESSMENT

O V E R V I E W O F P R O C E S S

MASTER PLANNING OF

POTENTIAL DISTRICT

IMPROVEMENTS

LONG TERM

FACILITY PLAN

FA C I LT Y A S S E S S M E N T D E L I V E R A B L E

O V E R A L L A N A LY S I S

“BUILDINGS HAVE GOOD BONES”

Presenter
Presentation Notes

B E T T E N D O R F H I G H S C H O O L

BOILER REPLACEMENT FULL HVAC SYSTEM REPLACEMENT

(EXCEPT PAC ADDITION)

Presenter
Presentation Notes

B E T T E N D O R F H I G H S C H O O L

POOL SETTLEMENT AND HVAC CONCERN

(F WING HEATING ONLY CREATING HUMIDITY

ISSUES

Presenter
Presentation Notes

B E T T E N D O R F H I G H S C H O O L

FLOODING IN CONNECTING LINK

AREA 1 PARKING LOT RESURFACING

Presenter
Presentation Notes

B E T T E N D O R F H I G H S C H O O L

B100 FIREPROOFING COMPROMISED

WINDOW REPLACEMENT (D100 & E100) NON-THERMALLY BROKEN FRAMES

CARPET REPLACEMENT (B100, B200, D100, D200)

Presenter
Presentation Notes

B E T T E N D O R F M I D D L E S C H O O L

REPLACE GYM ROOFTOP UNITS AND ADD DUCTWORK INSULATION

B E T T E N D O R F M I D D L E S C H O O L

PARTIAL ROOF REPLACEMENT – (ORANGE); SEAM/FLASHING FAILURES, WET INSULATION

B E T T E N D O R F M I D D L E S C H O O L

STRUCTURAL CONCERN AT WING WALL (4W, 5W & 6W)

WINDOW REPLACEMENT ORIGINAL BUILDING

CASEWORK REPLACEMENT IN SCIENCE AREAS

EXHAUST AT LASER

CUTTER

TOILET PARTITION REPLACEMENT

E D I S O N A C A D E M Y

EGRESS AND FIRE RATING CONCERNS

ROOF EXHAUST DUCTWORK

REPLACEMENT

EXTERIOR LIGHT REPLACEMENT

E D I S O N A C A D E M Y

PARTIAL ROOF REPLACEMENT – (ORANGE); SEAM/FLASHING FAILURES, WET INSULATION

H E R B E R T H O O V E R E L E M E N TA R Y S C H O O L

SITE DRAINAGE ISSUE WITH RUNOFF EROSION

H E R B E R T H O O V E R E L E M E N TA R Y S C H O O L

PARTIAL ROOF REPLACEMENT – (RED & ORANGE)

• PLANT GROWTH ON ROOF

• INSULATION CUPPED MEANING WATER INFILTRATION

• INSULATION NOT SECURED

• ROOF CURRENTLY HELD BY FASTENING BAR

H E R B E R T H O O V E R E L E M E N TA R Y S C H O O L

WINDOW REPLACEMENT (SINGLE PANE) ORIGINAL BUILDING

CARPET REPLACEMENT ORIGINAL BUILDING

SECURE ENTRANCE

GYM CEILING CONCERNS

M A R K T W A I N E L E M E N TA R Y S C H O O L

TUNNEL WATER INFILTRATION

BASEMENT WATER INFILTRATION CONCERN

M A R K T W A I N E L E M E N TA R Y S C H O O L

PARTIAL ROOF REPLACEMENT – (ORANGE). SEAM/FLASHING FAILURES WITH WET INSULATION

M A R K T W A I N E L E M E N TA R Y S C H O O L

CARPET AND LIGHT REPLACEMENT THROUGHOUT

SECURE ENTRANCE INTERCOM AND BELL SYSTEM REPLACEMENT

PA U L N O R T O N E L E M E N TA R Y S C H O O L

EXTERIOR HOLLOW METAL FRAME REPLACEMENT AT MAIN ENTRANCE

SECURE ENTRANCE UPGRADES

PA U L N O R T O N E L E M E N TA R Y S C H O O L

SATURATED CEILING TILES

PLUG MOLD BY SINK DATED CASEWORK

TOILET ROOM TILE REPLACEMENT

CARPET REPLACEMENT

T H O M A S J E F F E R S O N E L E M E N TA R Y S C H O O L

FULL ROOF REPLACEMENT

T H O M A S J E F F E R S O N E L E M E N TA R Y S C H O O L

GYM CEILING CONCERNS

NEW SECURE ENTRANCE

KITCHEN UPGRADES

T H O M A S J E F F E R S O N E L E M E N TA R Y S C H O O L

WINDOW AND SOFFIT REPLACEMENT STORAGE/ELECTRICAL ROOM FIRE RATING CONCERNS

S U M M A R Y

BUILDING “BONES” ARE IN GOOD SHAPE.

POTENTIAL PRIORITIES: • HIGH SCHOOL HVAC ~$3M TO $5M.

• MIDDLE SCHOOL GYM HVAC ~$700K

• MARK TWAIN TUNNELS - TBD

• THOMAS JEFFERSON ROOFING/SOFFITS ~$425K

• SECURE ENTRANCES (T.J., NORTON, TWAIN, HOOVER) – TBD

• HIGH SCHOOL POOL SETTLEMENT - TBD

• HIGH SCHOOL EXTERIOR TUNNEL FLOODING ~$100K

• PARTIAL ROOF REPLACEMENTS (HOOVER, EDISON, MS, HS) ~$800K

N E X T S T E P S

• CONFIRM FACILITY ASSESSMENT BUDGET ITEMS PER SCHOOL IN

CONJUNCTION WITH ESTES CONSTRUCTION.

• MEET WITH DISTRICT ADMINISTRATORS TO PRIORITIZE POTENTIAL

DISTRICT IMPROVEMENTS. (8/29/17)

• COLLABORATE WITH DISTRICT TO IDENTIFY POTENTIAL BUDGET FOR

ALL LONG TERM FACILITY PROJECTS.

• COLLABORATE WITH DISTRICT TO PRIORITIZE FACILITY AND

POTENTIAL DISTRICT IMPROVEMENTS.

Q U E S T I O N S