June 13, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Docket No. CP19-28-000 Northern Delaware Basin Expansion Project Weekly Environmental Inspector Report No. 15 Commissioners: El Paso Natural Gas Company, L.L.C. ("EPNG") is hereby filing with the Federal Energy Regulatory Commission ("Commission") in Docket No. CP19-28-000, its weekly status report related to the Northern Delaware Basin Expansion Project (“Project”). Description of Proceeding On December 19, 2018, EPNG filed a prior notice application pursuant to sections 157.205, 157.208(b), and 157.210 of the Commission’s regulations under the Natural Gas Act and EPNG’s blanket certificate issued in Docket No. CP82-435-000 for authorization to construct an approximate 14-mile twenty-four-inch (24”) outside diameter (“O.D.”) loop line of its existing 20-inch (20”) O.D. Line No. 3162 in Winkler County, Texas, as well as make minor appurtenant facility modifications at existing compressor station and other facility locations in Winkler, Crane, and Upton Counties, Texas. Additionally, EPNG will be required to hydrotest approximately 51 miles of its existing 24-inch (24”) O.D. Line No. 1105 that traverses Winkler, Ector, and Crane Counties, Texas. On December 27, 2018, the Commission issued a Notice of Request Under Blanket Authorization initiating the 60 day comment period to allow for any person or Commission’s staff to file motions or notice to intervene and protests. Since no protests were filed within the comment period, the Project was deemed to be authorized on February 26, 2019. Submittal of Status Report In compliance with Section 157.208(c)(10) of the Natural Gas Act, EPNG is providing Environmental Inspector Report No. 15 for the period of June 2, 2019 through June 8, 2019.
Federal Energy Regulatory Commission -2- June 13, 2019 Filing Information EPNG is e-Filing this letter and report with the Commission's Secretary in accordance with the Commission's Order No. 703, Filing Via the Internet, guidelines issued on November 15, 2007 in Docket No. RM07-16-000.
Respectfully submitted,
EL PASO NATURAL GAS COMPANY, L.L.C.
By___________/s/______________ Francisco Tarin Director, Regulatory
Enclosures
EPNG We
Docket N
Project N
County/S
Reportin
Environm
1. Summ
Durin(Line Compcontilowe Ditch
Lowe
Backf
2. Relev
Durintotal North
All eqwalkenoted On Juthe hout opotho On Juthe pOfficeprojehydroNo pStatioover
eekly Enviro
No. CP19‐28‐
Name:
State:
ng Period:
mental Inspe
mary of Conng this reporNo. 31111
pressor Statnued betwering in, and
hing activitie
ering‐In activ
fill activities
vant Environng this repoof three‐huhern Delawa
quipment wed on a dailyd in the ditch
une 7, 2019,hole. The poof the pothoole was back
une 3‐4, 201project sitese on June 3ect were visiotest portionroblem areaon No. 58+0in the wind.
onmental Ins
‐000
Nor
WinCou
Jun
ector: Dav
nstruction Acrting period1), with cretion at Staeen Station backfill activ
s were cond
vities were c
were condu
nmental Actrting periodndred sixty‐are Basin Exp
was checked y basis to enh during this
a calf steppothole crew nole under itskfilled.
19, Douglas . After Safe3, 2019, varited. On Jun of the proas or non‐co00 to repair
spector Rep
rthern Delaw
nkler, Ector,unties, Texas
e 2, 2019 to
vid McCullou
ctivity for In, mainline wws complettion No. 7No. 228+00
vities were c
ducted betw
onducted be
ucted betwe
ivities: d, twenty‐fo‐four (364) ppansion Proj
for noxiousnsure that nos reporting p
ped into a ponearby was s own powe
Cotton, FERety and Envrious sites ane 4, 2019, oject as well ompliance issome geote
port No. 15
ware Basin E
, Crane ands
o June 8, 201
ugh
nspection Pewelding activting welds 62+38. Ab0 and Statioconducted al
een Station
etween Stat
en Station N
ur (24) peopeople haveject.
weeds ando animals haperiod.
othole near Sable to slopr without in
RC Project Mvironmental along the Ladditional sas the Loopssues were nech material
Expansion Pr
d Upton D
19
eriod: vities continfrom Statiobrasive blason No. 618long the new
No. 94+00 a
tion No. 62+0
No. 62+00 an
ple received received en
d found to bad become e
Station No. e the hole, ancident. Aft
Manager, conTraining atine No. 110sites were vp Line No. 31noted thougwhich was
roject
Date: 6/13/2
ued along ton No. 700+sting and c+00. Additw loop line.
and Station N
00 and Stati
nd Station N
d environmenvironmenta
be clean. Alentrapped.
393+08 andand the calf ter the calf l
nducted a fit the Kinder05 hydrotesvisited on th1111 portiongh a crew wnot staked
2019
he new loop+00 up to coating actitionally, ditc
No. 212+00.
on No. 168+
o. 128+00.
ental traininal training o
l open ditchNo animals
d became stuwas able toleft the hole
eld inspectir Morgan Odst portion ohe Line No. ns of the prowas dispatchdown and b
p line Wink vities ching,
+00.
ng. A n the
h was were
uck in walk e, the
on of dessa of the 1105 oject. ed to blown
3. EnvirA fluiThe sStatioabsorcontapicke As a encoanalyDepa
4. Envir
No en 5. Issue
No la 6. Work
Durinand bpermof thean alt
ronmental Pid spill occurspill was cauon No. 186+rbent mateaminated soed up and pla
follow up untered duryzed were dartment is co
ronmental Cnvironmenta
es and Concendowner iss
k Planned fong the next backfill of th
mitting agence Line No. 1ternative me
Problems/Issrred on Juneused by the+00. The trerials were oil. An area aced into DO
to the lastring trenchindetermined oordinating r
Compliance Ial complianc
erns Identifisues or conc
or the Followreporting phe new loopcy clearance1105 hydrosteasures requ
sues and Coe 7, 2019 con failure of aack hoe immplaced to of about 2‐fOT drums to
t environmeng activitiesto be asberemediation
Issues/Resoces issues we
ed by Landocerns were id
wing Reportieriod, activip line. As ps and landowtatic testing uest once al
rrective Actnsisting of apa hydraulic hmediately shabsorb thefeet by 3‐feeawait dispo
ental inspecs at Station estos conta efforts by a
lutions: ere identifie
owners: dentified du
ing Period:ties will conpreviously nwner approvactivities. El clearances
ions Taken:pproximatelhose on a thut down, te fluid andet was contaosal.
ctor report’sNo. 10+00, ining matera third party
ed during thi
ring this rep
ntinue on cooted, EPNGvals related EPNG will sehave been o
ly 2 gallons otrack hoe wthe spill wasd minimize aminated. T
s mention the materiarial. EPNG’contractor.
s reporting
porting perio
oating, ditch is securingto modificateek Commissobtained.
of hydraulic hile digging s containedthe amoun
This materia
of the trasals collected’s Environm
period.
od.
hing, lowerin the approption to the ssion approv
fluid. near , and nt of l was
h pit d and mental
ng‐in, priate scope al for
Report N
Photos
Location31111 RONo. 721+DirectionNorth Descriptiwelding cweld.
Location31111 RONo. 721+DirectionNorth Descriptiwelding cthe bead
No. 15
: Line No. OW at Statio+00 n of Photo:
ion: Mainlincrew lining u
: Line No. OW at Statio+00 n of Photo:
ion: Mainlincrew makingd weld.
on
e up a
on
ne g
Photos
Location31111 RONo. 718+DirectionSouth Descriptithe weld
Location31111 RONo. 479+DirectionNorth Descriptitrack hoePan Ranc
: Line No. OW at Statio+00 n of Photo:
ion: Capping.
: Line No. OW at Statio+00 n of Photo:
ion: Crossinge across Fryich Road
on
g
on
g a ng
Photos
Location31111 RONo. 431+DirectionSouthweDescriptiblasting a
Location31111 RONo. 432+DirectionSouthweDescriptiweld.
: Line No. OW at Statio+00 n of Photo: est ion: Abrasiva weld.
: Line No. OW at Statio+00 n of Photo: est ion: Coating
on
ve
on
g a
Photos
Location31111 RONo. 422+DirectionWest DescriptiGang creup pipe s
Location31111 RONo. 252+DirectionNortheasDescriptifor foreig
: Line No. OW at Statio+00 n of Photo:
ion: Mini ews welding sections.
: Line No. OW at Statio+00 n of Photo: st ion: Potholingn lines.
on
on
ng
Photos
Location31111 ROStation NDirectionSouth Descriptiwith a tra
Location31111 ROStation NDirectionNorth Description the noTexas Higprior to broad boa
: Line No. OW at No. 207+00 n of Photo:
ion: Ditchinackhoe.
: Line No. OW at No. 186+00 n of Photo:
ion: Bore pitorth side of ghway 874 beginning thar.
g
t
e
Photos
Location31111 ROStation NDirectionSouthweDescriptithe ditchforeign li
Location31111 ROStation NDirectionSouthweDescriptia tie‐in w
: Line No. OW at No. 172+00 n of Photo: est ion: Digging h near a ne crossing.
: Line No. OW at No. 84+00 n of Photo: est ion: Making weld.
.
Photos
Location31111 RONo. 64+0DirectionSouthweDescriptiblasting a
Location31111 RONo. 66+0DirectionSouthweDescriptiinstalled foreign li
: Line No. OW at Statio00 n of Photo: est ion: Abrasiva tie‐in weld
: Line No. OW at Statio00 n of Photo: est ion: Pipelineunder ne crossings
on
ve d.
on
e
s.
Photos
Location31111 ROStation NDirectionNortheasDescriptiBackfillinline with
Location31111 ROStation NDirectionNortheasDescriptiContouriafter thebeen bac
: Line No. OW at No. 72+00 n of Photo: st ion: ng the ditch a trackhoe.
: Line No. OW at No. 74+00 n of Photo: st ion: ng the ROW ditch has ckfilled.
W
Certificate of Service I hereby certify that I have this day caused a copy of the foregoing documents to be served upon each person designated on the official service list compiled by the Commission's Secretary in this proceeding in accordance with the requirements of Section 385.2010 of the Federal Energy Regulatory Commission's Rules of Practice and Procedure. Dated at Colorado Springs, Colorado as of this 13th day of June 2019.
/s/ Francisco Tarin
Two North Nevada Avenue Colorado Springs, Colorado 80903 (719) 667-7517