A-101 · 2020. 5. 24. · Dolma Tsering 747 Flushing Avenue (718)-356-2493 (718)-356-2494...

Post on 21-Aug-2020

0 views 0 download

transcript

LEVEL 1 GROUND0' - 0"

LEVEL 212' - 0"

LEVEL 3 ROOF24' - 0"

TOP OF PARAPET27' - 0"

B

TOP OF FOOTING-4' - 0"

A-1018

A-10110

A-10211

A

GYPSUM WALL BOARD

18 GAGUE METAL STUDS

8" METAL STUD TRACK

HORIZONTAL TRACKS

VERTICAL ALUMINUM TRACKS

1" RIGID INSULATION

TERRACOTTA PANELS

TERRACOTTA CLIPS

GYPSUM WALL BOARD

18 GAGUE METAL STUDS

8" METAL STUD TRACK

HORIZONTAL TRACKS

VERTICAL ALUMINUM TRACKS

1" RIGID INSULATION

TERRACOTTA PANELS

TERRACOTTA CLIPS

3

GYPSUM WALL BOARD

18 GAGUE METAL STUDS

8" METAL STUD TRACK

HORIZONTAL TRACK

VERTICAL ALUMINUM END TRACKS

1" RIGID INSULATION

TERRACOTTA PANELS

TERRACOTTA CLIPS

A B

2

1

3

C

2A-101

0' -

4 3/

16"

A-1015

A-1016

A-1017

3A-102

A-10212

11' - 6" 8' - 0"

5' -

3"

8' -

10"

8' -

0"

12" CMU WALL BACKING

3" RIGID INSULATION

WATERPROOFING MEMBRANE CONTINOUS

1" SPACER

2" FINISHED PAVING

3" CONCRETE ON 2" METAL DECKING

TERRACOTTA LEDGE PANEL

1" RIGID INSULATION OF R5

3/4" PLYWOOD

W12x26 GIRDER

5/8" GUPSUM WALLBOARD CEILING FINISH

LEVEL 1 GROUND0' - 0"

2x4" KEY

4" CONCRETE SLAB

1" EXPANSION JOINT

4" DRAIN PIPE

1 1/2" RE BAR

1/16" WATERPROOFING CONTINUOUS

FLASHING

FILTER FABRIC

DRAINAGE MAT

RE BAR ANCHOR

J DRAIN

COMPACTED GRAVEL BED

Scale

Project number

Date

Drawn by

Checked by

Roy Yang745 Flushing Avenue(718)-356-2497(718)-356-2498roy.yang@JDREam.com

Eduardo Ramirez

Professor Justin Sherman

ARCH.2431 BUILDING TECHNOLOGY III

SECTION: E148

Jovany Cumbe746 Flushing Avenue(718)-356-2495(718)-356-2496jovany.cumbe@JDREam.com

Dolma Tsering747 Flushing Avenue(718)-356-2493(718)-356-2494dolma.tsering@JDREam.com

As indicated

5/24

/202

0 6:

10:2

3 PM

A-101

OPAQUE FACADE STUDY

5

Eduardo RamirezTerracotta Panels

5/20/2020E.R.JNS

1/2" = 1'-0"2TERRACOTTA PANEL SECTIONELEVATION

No. Description Date

1 TERRACOTTA PANEL WALL AXON

1 1/2" = 1'-0"5 OUTSIDE CORNER DETAIL

1 1/2" = 1'-0"6 INSIDE CORNER DETAIL

1 1/2" = 1'-0"7 END OF WALL DETAIL

3/4" = 1'-0"3 LEVEL 1 GROUND PLAN

1" = 1'-0"8 PARAPET DETAIL

1" = 1'-0"10 FOUNDATION DETAIL

LEVEL 1 GROUND0' - 0"

LEVEL 212' - 0"

LEVEL 3 ROOF24' - 0"

TOP OF PARAPET27' - 0"

B

TOP OF FOOTING-4' - 0"

TERRACOTTA ROOF PANEL

TERRACOTTA PANELS

VERTICAL TRACK

TERRACOTTA CLIPS

HORIZONTAL TRACKS

WINDOWS

TERRACOTTA CORNER PANELS

5' - 9 7/16"

5' - 7 1/2"

3' -

5 1/

8"

2' -

6 1/

2"

TERRACOTTA CLIPS

1" RIGID INSULATION

HORIZONTAL TRACKS

TERRACOTTA PANEL

A-1021

2-7/8" CASING BED

BLOCKING

2 5/8" GYPSUM WALL BOARD

FLEXIBLE FLASHING

WINDOW PANES

2-7/8" CASING BED

BLOCKING

2 5/8" GYPSUM WALL BOARD

FLEXIBLE FLASHING

WINDOW PANES

3

5/8" GYPSUM WALL BOARD

18 GAUGE METAL STUDS

8" METAL TRACK

A-1022

WINDOW PANES

2-7/8" WINDOW CASING BED

ALUMINUM COVER

PLYWOOD BLOCKING

EXTERIOR INTERIOR

LEVEL 1 GROUND0' - 0"

LEVEL 212' - 0"

LEVEL 3 ROOF24' - 0"

TOP OF PARAPET27' - 0"

2 1

TOP OF FOOTING-4' - 0"

3

A-10210

3' -

0"12

' - 0

"12

' - 0

"4'

- 0"

2-7/8" CASING BED

BLOCKING

2 5/8" GYPSUM WALL BOARD

FLEXIBLE FLASHING

WINDOW PANES

WINDOW PANES

ALUMINUM COVER

PLYWOOD BLOCKING

2-7/8" WINDOW CASING BED

0' - 0 5/8"

AIR GAP

Scale

Project number

Date

Drawn by

Checked by

Roy Yang745 Flushing Avenue(718)-356-2497(718)-356-2498roy.yang@JDREam.com

Eduardo Ramirez

Professor Justin Sherman

ARCH.2431 BUILDING TECHNOLOGY III

SECTION: E148

Jovany Cumbe746 Flushing Avenue(718)-356-2495(718)-356-2496jovany.cumbe@JDREam.com

Dolma Tsering747 Flushing Avenue(718)-356-2493(718)-356-2494dolma.tsering@JDREam.com

As indicated

5/24

/202

0 6:

10:3

0 PM

A-102

OPAQUE FACADE STUDY

5

Eduardo Ramirez2250 IG (Inside Glazed)

Terracotta Panels

4/20/2020 E.R.

JNS

No. Description Date

3/4" = 1'-0"3 SECTION PERSPECTIVE8TERRACOTTA PANEL WINDOWOPENING9

TERRACOTTA PANEL WINDOWOPENING PAREPET

1" = 1'-0"10 WINDOW ELEVATION

1 1/2" = 1'-0"11 TERRACOTTA PANEL WINDOW SECTION3" = 1'-0"12 TERRACOTTA WINDOW PLAN DETAIL

1/2" = 1'-0"4 TERRACOTTA WALL WEST ELEVATION

6" = 1'-0"1 WINDOW SECTION ENLARGED

6" = 1'-0"2 WINDOW PLAN ENLARGED DETAIL

E

F

G

H

I

J

4A-104

A-1035

A-1034

A-1032

----

I

MULLION ENCASING

WINDOW GLAZING

FACE COVER

THERMAL CLIPS

THERMAL CLIPS

MULLION ENCASING

GLAZING GASKETS

WINDOW GLAZING

1/8" FORMED ALUMINIUM

FACE COVER

THERMAL CLIPS

MULLION ENCASING

GLAZING GASKETS

WINDOW GLAZING

FORMED ALUMINIUM COVER

FACE COVER

THERMAL CLIPS

SEALANT

MULLION ENCASING

FACE COVER

THERMAL CLIPS

GLASS DOOR JAMB

GLAZING GASKETS

GLASS DOOR GLAZING

Scale

Project number

Date

Drawn by

Checked by

Roy Yang745 Flushing Avenue(718)-356-2497(718)-356-2498roy.yang@JDREam.com

Eduardo Ramirez

Professor Justin Sherman

ARCH.2431 BUILDING TECHNOLOGY III

SECTION: E148

Jovany Cumbe746 Flushing Avenue(718)-356-2495(718)-356-2496jovany.cumbe@JDREam.com

Dolma Tsering747 Flushing Avenue(718)-356-2493(718)-356-2494dolma.tsering@JDREam.com

As indicated

5/24

/202

0 6:

10:3

6 PM

A-103

CURTAIN WALL FACADESYSTEM

5

Eduardo Ramirez2250 IG (Inside Glazed) Curtain Wall System

4/20/2020 E.R.

JNS

No. Description Date

1 CURTAIN WALL AXON3/4" = 1'-0"7 LEVEL 1 GROUND - Glass CurtainWall

3" = 1'-0"2 CURTAIN WALL END CONDITION3" = 1'-0"4 CURTAIN WALL INSIDE CORNER

3" = 1'-0"5 CURTAIN WALL OUSIDECORNER3" = 1'-0"6 CURTAIN WALL DOOR PLAN DETAIL

LEVEL 3 ROOF24' - 0"

12" CMU WALL BACKING

3" RIGID INSULATION

WATERPROOFING MEMBRANE CONTINOUS

1" SPACER

2" FINISHED PAVING

3" CONCRETE ON 2" METAL DECKING

ALUMINIUM COPING

2" RIGID INSULATION OF R10

BLOCKING

HSS 10x6x5/8 COATED WITH IMUDESCENT PAINT

HSS 12x12x5/8 COATED WITH IMUDESCENT PAINT

A-1048

ALLUMINIUM PANELS

LEVEL 212' - 0"

F

HSS 10x6x5/8

HSS 12x12x5/8

MULLION ENCLOSURE

CAULKING

WINDOW GLAZING

INSULATION

F

2x4" KEY

4" CONCRETE SLAB

1" EXPANSION JOINT

A-1049

COMPACTED GRAVEL BED

FLASHING

J DRAIN

4" DRAIN PIPE

1 1/2" RE BAR

WATERPROOFING CONTINUOUS

FILTER FABRIC

1/2" WATER PROOF PROTECTION

LEVEL 1 GROUND0' - 0"

LEVEL 212' - 0"

LEVEL 3 ROOF24' - 0"

TOP OF PARAPET27' - 0"

TOP OF FOOTING-4' - 0"

E F J

A-1041

A-1042

A-1043

A-1045

LEVEL 1 GROUND0' - 0"

A-1046

A-1047

LEVEL 1 GROUND0' - 0"

WINDOW GLAZING

GLAZING GASKET

GLASS DOOR BASE

WINDOW GLAZING

MULLION ENCASING

THERMAL CLIPS

GLASS DOOR HEADER

DOOR GLAZING PANEL

GLAZING GASKET

TOP OF PARAPET27' - 0"

F

12" CMU WALL BACKING

WATERPROOFING MEMBRANE CONTINOUS

ALUMINIUM COPING

2" RIGID INSULATION OF R10

BLOCKING

ALLUMINIUM PANELS

ALUMINIUM CLEAT

LEVEL 1 GROUND0' - 0"

FLASHING

3/4" SHEATHING

WATERPROOFING

1/2" WATERPROOF PROTECTION BARRIER

Scale

Project number

Date

Drawn by

Checked by

Roy Yang745 Flushing Avenue(718)-356-2497(718)-356-2498roy.yang@JDREam.com

Eduardo Ramirez

Professor Justin Sherman

ARCH.2431 BUILDING TECHNOLOGY III

SECTION: E148

Jovany Cumbe746 Flushing Avenue(718)-356-2495(718)-356-2496jovany.cumbe@JDREam.com

Dolma Tsering747 Flushing Avenue(718)-356-2493(718)-356-2494dolma.tsering@JDREam.com

As indicated

5/24

/202

0 6:

10:4

1 PM

A-104

CURTAIN WALL FACADESYSTEM

5

Eduardo Ramirez2250 IG (Inside Glazed) Curtain Wall System

4/20/2020E.R.

JNS

No. Description Date

1" = 1'-0"1 CURTAIN WALL PARAPET DETAIL

1 1/2" = 1'-0"2 MID LEVEL SECTION

1" = 1'-0"3 CURTAIN WALL FOUNDATION1/2" = 1'-0"4 Section-Elevation Glass Curtain Wall

1" = 1'-0"5 CURTAIN WALL DOOR SECTION3" = 1'-0"6CURTAIN WALL DOOR SECTIONBOTTOM DETAIL

3" = 1'-0"7CURTAIN WALL DOOR SECTION TOPDETAIL

3" = 1'-0"8CURTAIN WALL PARAPET ENLARGEDDETAIL

3" = 1'-0"9 CURTAIN WALL FOUNDATION CALLOUT

ramir
Underline

Terracotta Panel Wall AssemblyEduardo Ramirez

Thermal properties

Picture: Boston valley

Terracotta panels have a minimum of 4 inch gaps from the studs or CMU to back of finished terracotta panels, there is enough space for different types of insulation.

The most commonly used insulation in terracotta panels is 1-2” rigid insulation between the vertical and horizontal tracks

waterproofing propertiesTerracotta panels have a minimum of 4 inch gaps from the studs or CMU to back of finished terracotta panels, in which a waterproofing membrane is used on top of the CMU or on a sheathing wall on the studs

Picture: Boston valleyBecause there is an air gap, it allows water to go right through the gap and out with help of flashing

Fire protection propertiesTerracotta panels and the aluminium tracks used are non combustible to help with fire protection

British Board of Agrement

Structural propertiesThe main structure of the terracotta panel system is held by vertical and horizontal tracks. These tracks span the length and width of the wall.

The tracks serve as the backing for the clips that are bolted to the tracks and then the panels are hung from the clips.

Pictures: Boston valley

sustainabilityBoston Valley offers a way in which you can give them most ceramic materials from old construction sites and through their manufacturing process, can be used to create new terracotta panels

8” tracks

8” studs

Stud framing for window

⅝” Gypsum Wall Board

Waterproofing membrane on sheathing

Boston valley horizontal tracks

Boston valley Vertical tracks

Boston valley terracotta clips

1” or 2” rigid insulation

terracottA PANELs

Window placed

2250 ig Curtain wall Assembly

Thermal properties

Pictures : kawneer

Since the 2250 IG Curtain Wall system has an added amount of tint, it allows for more shading inside the building which helps regulate temperature by not allowing much heat that will factor in the building

The system also features economical thermal insulation clips

waterproofing propertiesThe Curtain Wall system has double pane system to offer a dry glazing to provide a weather seal that helps prevent water from coming in through sealed mullions that have glazing gaskets to prevent water from entering building as well as caulking on blocking on end conditions

Fire protection propertiesThermafiber products offer different level of protection against fire

Protects floor slabs, Mullions, bolts, and connections

Pictures : owens corning

structural propertiesThis Wall is held by unitized mullions that are fabricated and put together off site and have the option of including steel reinforcement inside the mullions and well as structural Silicone Sealant

Pictures : Kawneer and aristo industries

Structure

window placement

window placement

Double door placement

resourceshttps://bostonvalley.com/downloads/BVTC.TerraClad_book-web.pdf

https://www.bostonvalley.com/downloads/BVTC.install-guide.Panels.FINAL_SCREEN.pdf

https://www.kawneer.com/kawneer/north_america/catalog/product_flyers/17-2228_2250IG.pdf

https://www.kawneer.com/kawneer/north_america/catalog/97911/ADMD150EN.pdf

https://www.wje.com/projects/detail/robert-d-moreton-building

http://www.owenscorning.com/NetworkShare/EIS/Owens-Corning-Enclosure-Solutions-Curtain-Wall-Perimeter-Fire-Containment-Joint-ASTM-E2307-Tech-Bulletin.pdf

http://www.aristoindustries.com/sale-4767109-neutral-cure-structural-liquid-waterproof-silicone-sealant-for-structural-bonding-300ml.html