A Process-Centric Approach to NGOSS

Post on 25-Jan-2022

3 views 0 download

transcript

A Process-Centric Approachto NGOSS

Tim Jacobs

Slide 2

Agenda

• Introductions• The BT Wholesale environment• TCP project• Business issues• IT architecture for Wholesale• Approach to the project• Business benefits & deliverables• Futures

Slide 3

Introduction

• Programme manager, BT Exact– Workflow Services Division– 6 years’ experience in BPM solutions

• TCP– Workflow consultant– Lead supplier– Project manager

Slide 4

BT Wholesale

• Role & responsibilities– Provision of bandwidth to UK operators– Provision of bandwidth to other divisions of

BT: Global Services, Retail, …– In essence, BT’s engine room

• Business strategy– Standardization of systems’ strategy– Emphasis on eBusiness

Slide 5

Network Design and Implementation (ND&I)

• Approximately 5,000 employees nationwide– Regionally based

• Significant 3rd Party involvement– External build agents– Network Build

• Job delivery via “Job Pack”

Slide 6

ND&I: Business Issues

• Hugely complex business process– Even more than typical fixed-line operators

• Slow time to market• Cost• Inflexibility• eBusiness imperatives

Slide 7

TCP: Objectives

• End the ‘Stovepipe’ approach to systems’ development

• Overcome the limitations of incremental development of systems

• Enable national standards for records• Provide systems capability for geographical

independence• Systems design to support radical organizational

change options

Slide 8

TCP: Focus of Project

• Radical new approach– Process-led methodology

• Tracking & control– Process improvement

• Single virtual system– BEA Portal

• “information anywhere”– Seamless systems’ integration

Slide 9

Pre-TCP

Slide 10

Post-TCP

Slide 11

TCP Architecture

Slide 12

Architectural concerns

• ARIS selected to enable definition of processes from business perspective

• BEA selected for Portal and middleware components

• BUT …• The gap between the two was too wide:

– Needed complex process execution software to integrate process, people & technology

Slide 13

Approach to TCP project

• Substantial diligence• References• Proof of Concept

– integration with ARIS– integration with BT Internal Systems– integration with CIMAGE– integration with Process Monitor– transactional integration with WebLogic

• “Proof of Process”

Slide 14

Process Lifecycle

designing, analyzing and optimizing

measuring and evaluation

process-oriented implementation

Slide 15

Integrating ARIS & Staffware

• ARIS models must conform to TIBCO protocols– Attribute mappings– Technical terms

• Needs rigorous change control

Slide 16

Key Features of TIBCO Staffware Process Interchange Manager (SPIM)

• All standard TIBCO features definable• Black box steps• Process version validation

Slide 17

Integrating ARIS & TIBCO

From this…

…to this

TIBCO StaffwareProcess Suite

Slide 18

Stage 1 Converter Functionality

• Aris Process Model designed• SW Converter imports Process

Model into “Internal Model”• Internal Model them modified as

required• Initial SW Process Definition

created• SW Process Definition made

executable (add forms & data)

ARIS ProcessModel

SWConverter

Tool

SW ProcessDefinition

1

2

33

4

55

Slide 19

Change Resolution Functionality

• ARIS (and SW) Process modified• SW Converter imports ARIS

Process Model into “Internal Model”

• SW Converter imports SWProcess Definition into “Internal Model”

• Conflicts on either side are then resolved (i.e. accept change / reject change)

• New SW Process Definition exported

• New Steps in SW Process Definition made executable

ARIS ProcessModel

SWConverter

Tool

SW ProcessDefinition

1

2

44

3

66

5

Slide 20

Sample Portal TIBCO Worklist

Slide 21

Sample TIBCO Portal Work Item

Slide 22

Sample TIBCO Queue Summary

Slide 23

Project strategy & roadmap

• TCP project must be completed by end 2004/2005

• Process automation using TIBCO Staffware Process Suite is key

• Pre-requisite for key sister programmes within BT

Slide 24

TCP: Business Benefits

• Annual cost savings• Process standardization• Geographical independence• Multi-skilling• Improved time to market

Slide 25

Summary

• TCP project crucial to BT Wholesale’s strategy

• TIBCO delivers complex process execution capability

• Major improvements in productivity & much tighter control of the process

• Delivers business agility & enhanced profitability

Slide 26

Futures

• Single sign-on through Portal• Use of rules engine to simplify process• Major project management• Expansion of BPM use within BT?