Sheridan Rd and Chicago Ave Bike Path

transcript

City Council Meeting August 12, 20131

ITEP GRANT

SHERIDAN RD & CHICAGO AVE

Bike Path

City Council Meeting August 12, 20132

ITEP GRANT

•Federally Funded Program

•IDOT Administered

•Up to 80% Federal Share

•At least 20% Local Match

City Council Meeting August 12, 2013

• Sheridan Road (off-street)Ridge Avenue to South Campus Drive

Along east side in front of Northwestern University Campus

Connects to the Lakefront Bike Path and Wilmette’s Bike System

• Chicago Avenue (on-street)Sheridan Road to Davis Street

Connect Sheridan bike path to protected bike lanes on Church and Davis

3

Two-Way Bike Path

City Council Meeting August 12, 20134

Sheridan Road

City Council Meeting August 12, 20135

Sheridan Road•Description

• East side of street in the parkway (off-street)• 8 feet wide, bike path markings• Landscaping between street curb and bike path

•ImpactsSidewalk

• From 12 feet wide to 8 feet wide

Trees• Some trees may have to be removed or relocated• Minimize impact using permeable materials

Description and Impacts

City Council Meeting August 12, 20136

Chicago Avenue

City Council Meeting August 12, 20137

Chicago Avenue•Description

• West side of street(on-street) in the parking lane• Raised median, delineators, bike path markings• Bike signal

•ImpactsParking Spaces

• 36 metered spaces• 16 non-metered spaces• 19 metered spaces can be added to the east side between

Sheridan Road and Clark Street

Trees• None

Description and Impacts

City Council Meeting August 12, 2013

QUESTIONS?

8