Abbey Place...

Post on 07-Oct-2020

0 views 0 download

transcript

Abbey Place Apartments

CHARLOTTE, NORTH CAROLINA

Sheet Index:

C1.0

MULTI-FAMILY DEVELOPMENT

Chapter 1 - Existing Conditions

Cover Sheet

LandDevelopment1st Submittal

CONSTRUCTION DOCUMENTS

May 1, 2015

C1.4 Existing Conditions Plan

C2.0

Chapter 2 - Site

Layout Plan

C3.0

Chapter 3 - Grading

Overall Grading Plan

C5.2

Chapter 5 - Storm Drainage

Storm Drainage Plan

C5.3 - C5.4 Storm Drainage Notes and Details

C8.0 Abbey Place Roadway Plan and Profile

R.B. Pharr & Associates, P.A.420 Hawthorne Lane

Charlotte, NC 28204

(704)376-2186

Spectrum Properties

210 South Tryon Street

Charlotte, NC 28202(704)358-1000

DEVELOPER

LandDesign, Inc.223 N. Graham Street

Charlotte, NC 28202

(704)333-0325

CIVIL ENGINEER LandDesign, Inc.

223 N. Graham Street

Charlotte, NC 28202(704)333-0325

LANDSCAPE ARCHITECT

SURVEYOR

ARCHITECT BB+M Architecture

1435 West Morehead StreetCharlotte, NC 28208

(704)334-1716

SITE

Park Rd

CO

VER

SH

EET

RA

KR

PG RA

KN

LD

N.T

.S.

C-1

.0

Montford Dr

Abbey Place

Mockingbird Ln

C1.5 Demolition Plan

C4.0

Chapter 4 - Erosion Control

Erosion Control Plan Phase 1

C4.1 Erosion Control Plan Phase 2

C4.2 Erosion Control Notes and Details

C1.1-C1.3 Rezoning Plan

C5.0 Post Developed Impervious Area Plan

C5.1

Storm Drainage Area Plan

C5.5 Sand Filter 1 Detail

C5.6 Sand Filter 2 Detail

C3.3-C3.6 Driveway Sight Distance

C6.0

Chapter 6 - Utility

Utility Plan

C6.1-C6.2 Utility Notes and Details

C5.7 Sand Filter Riser Detail

C7.0-C7.1

Chapter 7 - Planting Plan

Required Planting Plan

C2.1-C2.2 Amenity Area Detail

C2.3-C2.12 Site Details

C3.1-C3.2 Detailed Grading Plan

Chapter 8 - Abbey Place Roadway Improvements

C8.1-C8.5 Abbey Place Cross Sections

C8.6 Traffic Control Plan

C5.0A 50-50 Woods-Grass Pre-Developed Map

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

Pool Storm Drainage PlanC5.1A May 1, 2015

LandDevelopment2nd Submittal

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

REV

ISIO

NS:

DA

TE:

DESIG

NED

BY

:D

RA

WN

BY

:C

HEC

KED

BY

:Q

.C. B

Y:

SH

EET

#:

SC

ALE:

PR

OJE

CT

#:

AB

BEY

PLA

CE A

PA

RT

MEN

TS

SPEC

TR

UM

PR

OPER

TIE

S R

ESI

DEN

TIA

L, IN

C.

1415 A

BBEY

PLA

CE, C

HA

RLO

TT

E, N

C 2

8209

MA

Y 1

, 2015

1014311

SEAL

07/1

0/1

5 -

PER

CIT

Y C

OM

MEN

TS (

1ST

REV

IEW

)07/1

5/1

5 -

GM

P P

AC

KA

GE

08/2

1/1

5 -

PER

CIT

Y C

OM

MEN

TS (

2N

D R

EV

IEW

)09/2

1/1

5 -

BU

ILD

ING

PER

MIT

SU

BM

ITT

AL

09/2

2/1

5 -

PER

CIT

Y C

OM

MEN

TS (

3R

D R

EV

IEW

)C7.2 Planting Plan

C7.3-C7.7 Detailed Planting Plan

C7.8 Planting Plan Schedule

GMPPackage

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

Chapter 9 - Lighting

E1.0 Site Lighting Plan

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

LandDevelopment

3rd Submittal

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

E1.1 Photometric Plan

Building

Standards1st Submittal

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

May 1, 2015 July 10, 2015 July 15, 2015 August 21, 2015 September 21, 2015

LandDevelopment4th Submittal

September 22, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 22, 2015

September 22, 2015

September 21, 2015

September 22, 2015

September 22, 2015

September 22, 2015

September 21, 2015

September 22, 2015

September 21, 2015

September 21, 2015

September 22, 2015

September 22, 2015

September 22, 2015

September 22, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 22, 2015

September 21, 2015

September 22, 2015

September 22, 2015

September 22, 2015

September 21, 2015

September 21, 2015

September 22, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 22, 2015

September 21, 2015

RZINK
Approved
RZINK
commercial
RZINK
Approved
RZINK
Approved
RZINK
Approved
BWILKINSON
Multi-Family Approval
BWILKINSON
Text Box
By Brent Wilkinson 9/28/15