ACO London 2012

Post on 08-Jul-2015

643 views 1 download

description

ACO supplied the sustainable drainage systems to six of the major Olympic venues, all of which required very specific products and installations. As ACO were involved in the planning stages of each project all the way through to the completion, we were able to meet the high standards that were set out by the British Olympic Association (“BOA”). The Olympic Park has been defined by its ground-breaking engineering and the radical new approach to sustainability.

transcript