Activity Report 02/03-05.2011Reggio EmiliaUpper Austrian Region
overview
REZIPE activities• organisational matters• solar power station at a public building• 2. Upper Austrian Solar Rally• guidelines for e-mobility
other activities• tender for e-bikes and e-scooter• solar power station at the main railway station in Linz
organisational matters
• instead of “Upper Austrian Academy for Environment and Nature”: Upper Austrian Department of Environment
• lead responsibility still executed by Andreas Drack• substitute Michael Nagl instead of Harald Huber
solar power station at a public building
• 3 kWp-power station erected in November 2010 at the vocational school of Attnang-Puchheim
• successful press releases after the press conference on January 19th
• environment issues will be included in the regular school curriculum (by Climate Alliance Upper Austria)
• inclusion in the Solar Rally 2011; pupils will be invited to attend the exhibition on e-mobility
• electricity yielded as a budget in the Upper Austrian Administration free of charge for employees who travel by e-bikes to the offices
• official e-bike used in the school; two more are located in Linz; all three can be used as test vehicles
1. Upper Austrian Solar Power Station at a public building
2. Upper Austrian Solar Rally
• 22-24th June 2011• organised (again) by climate alliance Upper Austria• linked to the Austrian climate tour• in co-operation with the two big electricity companies Linz AG and
Energie AG• 3626 persons invited by letter (combination with a questionnaire
linked to the support scheme for e-bikes)• additional letter to all 444 mayors of municipalities• invitation of schools in Linz by the city of Linz• invitation of media representatives to drive a part of the tour• local posters of REZIPE• tour: Linz (exhibition)-Eberstalzell (PV-installation)-Attnang
(exhibition)-Klaus• different tours for e-bikes and e-cars
guidelines for e-mobility
• Resolution proposal will be agreed during the 2011 General Assembly on May 5th
• official introduced on 18th February by Climate Alliance Austria
tender for e-bikes and e-scooter
• action of the administration (mobility management) for employees
• 15-25% discount (for the new 2011 models)• data sheets• one week fair for testing the bikes in November 2010• evaluation starting by questionnaire last week• 3 official e-bike in the administration
solar power station at the main railway station in Linz
• project management and design by the electricity company (Linz AG)
• positive expert opinion from the responsible architecture (Holzbauer plus Partner): transparent cells
• restrictive opinion of the representatives of the railway company (ÖBB)
• next step: representative of city should boost the project
• but! Mayor of Linz stopped the project!
CMO-project
• Project redesigned – reduced costs, regional support for co-financing
• launch of an association for e-mobility (and a network?)
current situation:
• no further activities in networking in Upper Austria• new (10) working groups on e-mobility under the
umbrella of federal ministries