Lyndale Community School – Safe / Secure Entrance and Monument Sign Addendum No. 001
Permit Set – 02/13/20 Page 1
Addendum No. 001 – 03/04/2020
ADDENDUM NO. 001
To Drawings and Project Manual Documents for:
Lyndale Community School – SAFE/SECURE ENTRY ENTRANCE & MONUMENT SIGN
OFFICIAL PUBLICATION NUMBER: OP#20-2918
OWNER'S PROJECT NO.: 19LYND001
ARCHITECT'S PROJECT NO.: 53560-19131A
OWNER: Minneapolis Public Schools
1250 West Broadway Avenue
Minneapolis, MN 55411
ARCHITECT: POPE ARCHITECTS, INC.
1295 Bandana Blvd N, Suite 200
St. Paul, Minnesota 55108
(651) 789-1638
DATE: 03/04/2020
This Addendum forms a part of the Permit Set Documents dated 02/13/20, and modifies the original Docu-
ments as noted below. This Addendum applies to any or all contracts and subcontracts. All work required
by this addendum shall be in complete accord with the Contract Documents and subsequent Addenda here-
to. The Items listed in this addendum are not in any order in regard to the drawings or the specifications. All
contractors are cautioned to examine each and every item of this addendum.
The following changes or clarifications to the plans and specifications shall be included as part of the Con-
tract Document.
This Addendum consists of (4) written pages and (5) full sized drawings.
Lyndale Community School – Safe / Secure Entrance and Monument Sign Addendum No. 001
Permit Set – 02/13/20 Page 2
Addendum No. 001 – 03/04/2020
A. PROJECT MANUAL
1. PROJECT MANUAL COVER
a. REVISE the Official Publication Number to be: OP#20-2918.
2. 00 01 01 - PROJECT TITLE PAGE
a. REVISE the MPS Official Publication Number to be: OP#20-2918.
3. 00 11 13 – CALL FOR BIDS
a. REVISE the MPS Official Publication Number to be: OP#20-2918.
B. DRAWINGS
1. SHEET AD-110 – OVERALL DEMOLITION FIRST FLOOR PLAN (Drawing is ReIssued)
a. ADD DEMOLITION KEYNOTE D43, “DEMO EXISTING CORRIDOR DIVIDER DOOR COMPLETE
INCLUDING WALL / OVERHEAD TRACKS AND SUPPORT FRAMING. PATCH EXISTING WALL FINISH
AS REQUIRED.”
b. DEMO complete the two existing corridor gates as indicated, KEYNOTE 43.
2. SHEET I-00 – INTERIOR MATERIAL IDENTIFICATION AND ABBREVIATIONS (Drawing is not reissued)
a. REVISE the CTW-2 color to be: “0135 ALMOND”.
Lyndale Community School – Safe / Secure Entrance and Monument Sign Addendum No. 001
Permit Set – 02/13/20 Page 3
Addendum No. 001 – 03/04/2020
b. REVISE the CTW-3 color to be: “1194 ELECTRIC BLUE”.
c. REVISE the PT-7 color to be: “SW6802 JACARANDA”.
d. ADD: VCT-5; MANUFACTURER: ARMSTRONG; STYLE: PREMIUM EXCELON – CROWN; COLOR:
5C868 SMOKEY BROWN; SIZE: 12”X12”; INSTALL: MONOLITHIC.
2. SHEET I-110 – OVERALL FIRST FLOOR – FLOOR FINISH PLAN (Drawing is ReIssued)
a. REFER to the reissued plan for the changes.
2. SHEET I-111 – OVERALL FIRST FLOOR – WALL FINISH PLAN (Drawing is not reissued)
a. CONFERENCE ROOM 111: REVISE the wall accent color from “PT7” to be “PT6”.
3. SHEET MD111 – LEVEL 1 MECHANICAL DEMOLITION PLAN (Drawing is not reissued)
a. Add the following to Keyed Note MD1: TURN OVER CONTROL VALVES AND UNIT HEATER TO
OWNER.
b. Revise Keyed Note MD5 as follows (underlined items are added; strikethrough items are omit-
ted): REMOVE EXISTING VAV REHEAT COIL IN ITS ENTIRETY, INCLUDING PIPING, DUCTWORK,
INSULATION, HANGERS & SUPPORTS. REMOVE EXISTING PNEUMATIC TUBING AS FAR BACK AS
POSSIBLE AND MECHANICALLY CAP IN WALL.
4. SHEET MP-111 – LEVEL 1 HYDRONIC PLAN (Drawing is ReIssued)
a. Revise Keyed Note MP23 as follows (underlined items are added; strikethrough items are omit-
ted): PROVIDE ¾” GHWS/R WITH VALVE AND CAP FOR FUTURE VAV.
b. Add the following to Keyed Note MP24: PROVIDE SHUT-OFF VALVE.
c. Add the following to Keyed Note MP25: PROVIDE ISOLATION VALVE AT CONNECTION.
d. Refer to Secure Vestibule 118I: Provide space temperature sensor on east wall. Include Keyed
Note MP17. Coordinate Location with items within space.
5. SHEET MH111 – LEVEL 1 MECHANICAL HVAC PLAN (Drawing is not reissued)
a. Refer to Corridor 118J: Identified CAP note to locations of ductwork removed back to main.
b. Refer to Staff Breakroom 115: Added room tag.
Lyndale Community School – Safe / Secure Entrance and Monument Sign Addendum No. 001
Permit Set – 02/13/20 Page 4
Addendum No. 001 – 03/04/2020
c. Refer to Staff Breakroom 115: Identified CAP note to duct removed back to wall.
6. SHEET MH111 – LEVEL 1 MECHANICAL DEMOLITION PLAN (Drawing is not reissued)
a. Refer to Detail 3/M-510: Add Note to supply duct main take-off as follows: BELL-MOUTH OR
CONICAL TAKE-OFF.
b. Refer to Detail 13/M-510: Revise Numbered Note 1 to read: REFER TO MECHANICAL
SPECIFICATION FOR EXACT TYPE OF CONTROL VALVE, BALANCE VALVE, VENT, FITTINGS,
STRAINER, PIPING, EXT. USED FOR APPLICATION.
c. Refer to Detail 13/M-510: Add Note to equal distance piping: PROVIDE ISOLATION VALVES.
d. Refer to Detail 10/M-510: Add Note D: PROVIDE WITH SAFETY CHAIN.
7. SHEET ED111 – LEVEL 1 ELECTRICAL DEMOLITION PLAN (Drawing is Reissued)
a. Add additional demolition to existing Conference Room 111E. Refer to sheet for details.
b. Add Keyed Note E64. Refer to sheet for details.
8. SHEET ET111 – LEVEL 1 TECHNOLOGY PLAN (Drawing is Reissued)
a. Review clock location in Staff Breakroom 115. Refer to sheet for details.
b. Unshaded Storage Room 108C. Refer to sheet for details.
c. Add Keyed Notes E65 and E66. Refer to sheet for details.
E. ATTACHMENTS
1. AD-110 – OVERALL DEMOLITION FIRST FLOOR PLAN
2. I-110 – OVERALL FIRST FLOOR – FLOOR FINISH PLAN
3. MP-111 – LEVEL 1 HYDRONIC PLAN
4. ET111 – LEVEL 1 TECHNOLOGY PLAN
5. ED111 – LEVEL 1 ELECTRICAL DEMOLITION PLAN
* END OF ADDENDUM NO. 001 *
UP
UP
FS
FS
F S
F S
DNUP
A) THE OWNER RESERVES THE RIGHT TO SALVAGE ANY EXISTING MATERIAL, EQUIPMENT, ETC. PRIOR TO THE START OF DEMOLITION. THE CONTRACTOR SHALL VERIFY THOSE ITEMS TO BE SALVAGED WITH OWNER.
B) ALL EXISTING CONSTRUCTION INDICATED TO REMAIN THAT IS DAMAGED OR AFFECTED BY THE DEMOLITION SHALL BE REPAIRED AND RESTORED TO ITS ORIGINAL CONDITION.
C) CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH THE OCCUPANT TO AVOID DISRUPTION OF THE FACILITY OPERATIONS. MAINTAIN REQUIRED EGRESS DURING CONSTRUCTION. PROVIDE TEMPORARY BARRICADES, ENCLOSURES AND PROTECTION AS NECESSARY DURING CONSTRUCTION.
D) WHERE WALLS OR PARTITIONS ARE SHOWN TO BE REMOVED, ALSO REMOVE ALL ITEMS ATTACHED, CONNECTED OR INTERNAL TO THE WALLS INCLUDING TRIM, SHELVING, ACCESSORIES, CABINETS, BLOCKING, EQUIPMENT, MARKERBOARDS, ETC. REMOVE IN THEIR ENTIRETY, FASTENERS AND WALL ATTACHMENT DEVICES. PATCH AND REPAIR AS NEEDED TO COMPLETE WORK.
E) CONTRACTOR TO VERIFY EXACT LOCATION AND IDENTIFY, LABEL AND PROTECT EXISTING MECHANICAL AND ELECTRICAL SERVICES WHICH MAY BE AFFECTED BY DEMOLITION.
F) ALL DEMOLITION WORK NOTED ON THESE DRAWINGS SHALL BE COORDINATED WITH CORRESPONDING NEW WORK FLOOR PLANS AND DETAILS. REMOVE EXISTING CONSTRUCTIONAS INDICATED OR REQUIRED BY THE NEW WORK.
G) DETAILS OF EXISTING CONDITIONS: ACTUAL FIELD CONDITIONS WHICH ARE CONCEALED BYEXISTING CONSTRUCTION MAY VARY FROM THOSE INDICATED IN THE DRAWINGS. ALL WORKTHAT RELATES TO, OR IS IN ANY WAY AFFECTED BY EXISTING CONDITIONS WHICH VARY FROM THOSE INDICATED SHALL BE MODIFIED AS REQUIRED TO COMPLY WITH THE NEW WORKREQUIREMENTS.
H) THE DEMOLITION DRAWINGS INDICATE MAJOR ITEMS TO BE DEMOLISHED AND REMOVED. MISCELLANEOUS ABANDONED ITEMS INCLUDING CONDUIT, WALL PENETRATIONS (SCREWS, NAILS,ANCHORS, ETC), WOOD BLOCKING, AND OTHER VARIOUS ITEMS FASTENED TO EXISTING WALLS MAY NOT BE INDICATED ON THE DRAWINGS. REMOVE SUCH ITEMS THAT ARE NOT USED IN, ORCONCEALED BY NEW WORK. PATCH AND REPAIR DAMAGE TO THE WALLS WHERE SUCH ITEMSARE REMOVED.
I) SAWCUT AND REMOVE THE EXISTING CONCRETE SLAB AS REQUIRED TO ACCOMODATE NEWSTRUCTURAL, PLUMBING, ELECTRICAL WORK, ETC. REFERENCE STRUCTURAL, PLUMBING,ELECTRICAL DRAWINGS. MINOR LOCATIONS MAY NOT BE INDICATED.
J) REFER TO THE GENERAL NOTES FOR OTHER APPLICABLE INFORMATION.
K) REMOVE ALL CEILING MOUNTED ITEMS INCLUDING LIGHT FIXTURES, GRILLS, REGISTERS, SPEAKERS, FIRE ALARM DEVICES, ETC. COORDINATE WITH MECHANICAL AND ELECTRICAL DRAWINGS.
L) SALVAGE ALL CEILING MOUNTED PROJECTORS AND TURN OVER TO OWNER.
M) REFER TO CIVIL, STRUCTURAL, PLUMBING, MECHANICAL, AND ELECTRICAL DRAWINGS FOR ADDITIONAL DEMOLITION INFORMATION.
N) PORTIONS OR ELEMENTS (I.E. DOOR FRAMES) OF WALL SCHEDULED TO BE REMOVED OR SAWCUT AND REMOVED SHALL BE DONE SO TO PREVENT DAMAGE TO ADJACENT CONSTRUCTION TO REMAIN.
O) LIMITS INDICATED FOR DEMOLITION OF EXISTING BRICK AND CMU MASONRY ARE APPROXIMATE. REMOVE MASONRY UNITS TO NEAREST MORTAR JOINTS TO PREMIT "TOOTHING IN" OF NEW MASONRY TO EXISTING COURSING, UNLESS NOTED OTHERWISE. REFER TO MECHANICAL DRAWINGS FOR REMOVAL OF THRU-WALL MECHANICAL GRILLES, REGISTERS, AND DUCTWORK. AT MASONRY WALLS REMOVE BRICK AND CMU TO NEAREST MORTAR JOINTS TO PERMIT "TOOTHING IN" OF INFILL MASONRY TO MATCH EXISTING COURSING.
P) ITEMS IDENTIFIED TO BE SALVAGED ("REMOVE AND DELIVER TO OWNER") SHALL BE CAREFULLY REMOVED AND DELIVERED TO A STORAGE AREA DESIGNATED BY THE OWNER FOR THIS PURPOSE. ITEMS OWNER CHOOSES TO RETAIN SHALL BE RELOCATED FROM THE STORAGE AREA BY OWNER (NIC). ALL OTHER ITEMS SHALL BE SUBSEQUENTLY REMOVED AND DISPOSED OF BY CONTRACTOR WHEN AUTHORIZED BY OWNER.
Q) EXISTING LOOSE FURNITURE, EQUIPMENT, SUPPLIES, AND PERSONAL BELONGINGS LOCATED IN SPACES TO BE RENOVATED SHALL BE REMOVED AND RELOCATED BY OWNER (NIC).
R) COORDINATE DEMOLITION WORK WITH NEW WORK NOTES TO ENSURE PROPER REMOVAL OF ITEMS.
S) REMOVE ALL CEILINGS UNLESS OTHERWISE NOTED.
T) REMOVE ALL CEILING MOUNTED PROJECTORS, SPEAKERS AND A/V ITEMS IN ALL ROOMS AND TURN OVER TO OWNER. A/V WIRING SHALL REMAIN ABOVE CEILING AND BRACKET SUPPORTED FROM THE STRUCTURE ABOVE.
U) DEMO ALL CONCRETE MECH AND ELECTRICAL UNIT HOUSEKEEPING PADS. SEE MECH/ELEC.
V) NOTE: THE CONTRACTOR SHALL ASSUME THAT THERE IS EXISTING FLOORING UNDER ALL EXISTING CASEWORK AND THAT THE FLOORING CONTAINS ASBESTOS. ONCE THE CONTRACTOR HAS REMOVED THE EXISTING CASEWORK THE CONTRACTOR SHALL NOTIFY AND COORDINATE WITH THE OWNER AND THE OWNER'S ASBESTOS ABATEMENT CONTRACTOR PRIOR TO RESUMING WITH THE REQUIRED WORK IN THE ROOM OR AREA WHERE THE CASEWORK IS REMOVED.
W) REMOVE ALL EXISTING FLOORING FINISHES AND WALL BASE WHERE NEW FLOORING AND WALL BASE ARE INDICATED AND / OR SCHEDULED.
X) THE CONTRACTOR SHALL COORDINATE WITH THE OWNER'S ASBESTOS ABATEMENT CONTRACTOR THROUGHOUT THE CONSTRUCTION PHASE OF THE PROJECT. A COPY OF THE OWNER'S ABATEMENT CONTRACTOR SCOPE OF WORK IS INCLUDED IN THE PROJECT MANUAL FOR REFERENCE, ATTACHMENT F.
DEMOLITION GENERAL NOTESDEMOLITION PLAN SYMBOLSEXISTING DOOR AND FRAME TO REMAIN
EXISTING DOOR AND FRAME TO BE REMOVED
EXISTING WALL TO REMAIN
EXISTING WALL TO BE DEMOLISHED
EXISTING WINDOW TO REMAIN
EXISTING WINDOW TO BE DEMOLISHED
INDICATES EXISTING BUILDING AREAS WITH NO ARCHITECTURAL SCOPE OF WORK, U.N.O.
AREA OF FLOOR STRUCTURE DEMOLITION AND REPLACEMENT. COORDINATE WITH STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS.
UP
UPUP
UP
OPEN TO BELOW
D06D06
CL.
120
CL.
118 STAFF
112
MEN'S
TOILET
114
WOMEN'S
TOILET
116
D06 D07
D06
D06
D06
D06
D01
D05
F.V.+/- 9'-2"
PRINCIPALS
OFFICE
111A
CONFERENCE
ROOM
115
OFFICE
111C
OFFICE
111D
WORKROOM
111E
HEALTH
OFFICE
111F
STORAGE
111G
MISA
111H
MAIN OFFICE
111
D11
D11
CL.
126
CL.
100
CL.
136
CL.
134
CL.
132
CL.
130
CL.
128
CL.
102
CL.
104
OFFICE
109D
OFFICE
109E
STORAGE
108C
MEN'S
TOILET
108B
WOMEN'S
TOILET
108A
STORAGE
103B
FREEZER
108G
STORAGE
108A
STORAGE
108DTLT
108F
MULTI-PURPOSE
ROOM
108
GYM
109
WOMEN'S
LOCKERS
109A
MEN'S
LOCKERS
109B
Room
109F
TOILET
12TOILET
10
TOILET
11
JANITOR
103A
STORAGE
105D
GYM 110
239
WORK
ROOM
127
CL.
101
CL.
103
STORAGE
106
CL.
105
COMPUTER
ROOM
123/125
MEDIA
OFFICE
107
GIRLS'
TOILET
131 BOYS'
TOILET
129
LIBRARY
111K
STORAGE
106A
D02
D01
D01 D01
D02
D03
D10
D05
D05
EXISTING CHASE
AD-111
1
D08
D08
EXISTING ACCESS HATCH
DN
ELEVATOR
D04
D28
D18
D30
D31
D31
D32
D32
EXISTING CHASE ETR.
DASHED LINE OF OPEN CEILING ABOVE.
RECEIVING
108E
DISH
108C
KITCHEN
108B
D35
D39
108E D42
1
1
D43
D43
Issues and Revisions:
Commission No:
Drawn by:
Checked by:
SHEET
1295 BANDANA BLVD N, SUITE 200
ST. PAUL, MN 55108-2735
(651) 642-9200 | FAX (651) 642-1101
www.popearch.com
POPE ARCHITECTS, INC.
0" 1/2" 1"
TRUE SHEET SCALE
INFORMATION ON THESE PLANS REGARDING EXISTING STRUCTURE WAS TAKEN FROM EXISTING CONSTRUCTION DOCUMENTS
PROVIDED BY MINNEAPOLIS PUBLIC SCHOOLS. ACTUAL FIELD CONDITIONS MAY VARY FROM
WHAT IS SHOWN. ALL DIMENSIONS, ELEVATIONS AND CONDITIONS OF EXISTING CONDITIONS TO BE FIELD VERIFIED BY CONTRACTOR PRIOR TO
CONSTRUCTION.
3/4/2020 2:08:15 PMC:\Revit Projects\P1-53560-19131 MPS Lyndale ES - R19 -workshared_rlister.rvt
AD-110
OVERALL DEMOLITIONFIRST FLOOR PLAN
RDL
SAM
53560-19131
MPS LYNDALECOMMUNITY SCHOOL -
SAFE/SECUREENTRANCE AND
MONUMENT SIGN
312 W 34TH STMINNEAPOLIS, MN
55408
3/32" = 1'-0"AD-110
1 OVERALL DEMOLITION FIRST FLOOR PLAN
NORTH
DEMOLITION KEYNOTESKey Value Keynote Text
D01 THE OWNERS ASBESTOS ABATEMENT CONTRACTOR WILL DEMO THE EXISTING METAL STUDAND GYPSUM WALLBOARD WALL IN ITS ENTIRETY. SEE OWNER'S ABATEMENT CONTRACTORREPORT FOR FULL SCOPE OF WORK.
D02 DEMO EXISTING CONCRETE MASONRY WALL IN ITS ENTIRETY.D03 DEMO EXISTING DOOR, FRAME (INCLUDING ANY SIDELITE) AND HARDWARE.D04 DEMO EXISTING CONCRETE SLAB COMPLETE IN AREA OF RENOVATED TOILET ROOMS.D05 DEMO EXISTING PORTION OF WALL AS REQUIRED FOR NEW OPENINGS.D06 DEMO EXISTING CASEWORK SHOWN DASHED. SEE MECHANICAL DRAWINGS FOR FIN TUBE
SYSTEM DEMOLITION. SEE DEMOLITION GENERAL NOTES FOR ASBESTOS COORDINATIONREQUIREMENTS. SEE OWNER'S ABATEMENT CONTRACTOR REPORT FOR FULL SCOPE OFWORK.
D07 DEMO EXISTING HOLLOW METAL FRAME ENTRANCE SYSTEM.D08 DEMO EXISTING PLUMBING FIXTURE. SEE MECH FOR FULL PLUMBING SCOPE OF WORK.D10 REMOVE CMU BLOCK AND BRICK BEARING WALL, SEE STRUCT FOR NEW WALL. SALVAGE
BRICK FOR REINSTALLATION AROUND CUH REPLACEMENT AND EXISTING WINDOW INFILLLOCATIONS.
D11 DEMO CUH, SEE MECH.D18 DEMO EXISTING FLOOR SLAB AS REQUIRED TO INSTALL NEW FLOOR POWER/DATA BOXES.D27 SAWCUT CONCRETE FLOOR FOR NEW MECH. SEE MECH.D28 SAWCUT EXISTING FLOOR AS REQUIRED FOR NEW CASEWORK SINK.D30 DEMO EXISTING 3'-4" X 9'-0" TALL WINDOW.D31 PROTECT EXISTING WALL MOUNTED MURALS.D32 REMOVE EXISTING DOOR AND HARDWARE, EXISTING FRAME TO REMAIN.D35 REMOVE EXISTING FOUNTAIN AND SALVAGE.D36 THE OWNER'S ASBESTOS ABATEMENT CONTRACTOR WILL DEMO THE EXISTING
MARKERBOARDS. SEE OWNER'S ABATEMENT CONTRACTOR REPORT FOR FULL SCOPE OFWORK.
D37D38 THE OWNER'S ASBESTOS ABATEMENT CONTRACTOR WILL DEMO ALL OF THE EXISTING
CERAMIC TILE FLOORING AND WALL BASE WHERE NEW FLOORING AND WALL BASE ISINDICATED AND/OR SCHEDULED. SEE OWNER'S ABATEMENT CONTRACTOR REPORT FOR FULLSCOPE OF WORK.
D39 DEMO ALL EXISTING FLOORING AND WALL BASE WHERE NEW FLOORING AND WALL BASE ISINDICATED AND/OR SCHEDULED.
D40 DEMO EXISTING CEILING TILE AND GRID.D41 REMOVE EXISTING CEILING GRID AND TILES AS REQUIRED TO GET ACCESS TO DUCTWORK
ABOVE. SALVAGE GRID AND TILES FOR REINSTALLATION ONCE MECHANICAL WORK ISCOMPLETE.
D42 REMOVE EXISTING DOOR HARDWARE. EXISTING DOOR AND FRAME TO REMAIN. REFER TOSECURITY DRAWINGS FOR ADDITIONAL WORK SCOPE.
D43 DEMO EXISTING CORRIDOR DIVIDER DOOR COMPLETE INCLUDING WALL / OVERHEAD TRACKSAND SUPPORT FRAMING. PATCH EXISTING WALL FINISH AS REQUIRED.
ISSUE FOR BIDDING 02/13/20
ADDENDUM #1 03/04/20
NOTE: KEYNOTES THAT ARE NOT LISTED ARE NOT USEDAND THEREFORE HAVE BEEN INTENTIONALLY OMITTED.
1
ACCACC
ACC
REF.
AC
C
CHECKIN
112B
WAITING
112A
SECURE
VESTIBULE
118I
CORRIDOR
118J
TOILET
116
TOILET
114
TOILET
112L
TOILET
112KCORRIDOR
112C
OFFICE
112E
OFFICE
112D
HEALTH
OFFICE
112J
CLASSROOM
113
CLASSROOM
120
CONFERENCE
ROOM
111
MEDIA
OFFICE
107
LIBRARY
1
STAFF
BREAKROOM
115
CPT2 RB1
OFFICE
112H
WORKROOM
112I
OFFICE
112F
CL.
122
CPT2 RB1
CPT2 RB1
CPT3 RB1
SC RB1
LVT1 RB2
CPT2 RB1
CPT2 RB1
VCT1 RB2
PTF1 PTB1
PTF1
PTB1
PTF1
PTB1
PTF1
PTB1
PTF1
PTB1
LVT1 RB2
CPT2 RB1
VCT1 RB2
VCT1 RB2
CPT3 RB1
VCT2
VCT3
VCT4
4'-0"
4'-0"4'-0"
EXIST EXIST
EXIST EXIST
4'-0"
4'-0"
VCT3
VCT2
VCT4
CL.
124
CL.
128
CL.
130
GIRLS'
TOILET
119
BOYS'
TOILET
117
WOMEN'S
LOCKERS
109A
STORAGE
109C
Room
109F
OFFICE
109D
OPEN TO BELOW
EXIST RB2
4'-0"
PROVIDE NEW VCT
1
ALIGNALIGN
VCT5 RB2
ALIGN
VCT5 RB2
ALIGN
1
1
XX#
XX# FLOOR FINISH, BASE FINISH
FINISH PLAN SYMBOLS LEGEND
XX#
XX#
BASE FINISH (WHERE VARIES WITHIN ROOM)
WALL FINISH
WALL FINISH (WHERE VARIES WITHIN ROOM)
FLOORING GRAIN DIRECTION
WALL PROTECTION (WP-1 U.N.O.)
XX# WALL FINISH (ABOVE) REFER TO INTERIOR ELEVATIONS
A) SUBMIT DRAW-DOWNS AND SAMPLES FOR ALL FINISH MATERIALS FOR APPROVAL BY ARCHITECT/DESIGNER PRIOR TO MATERIAL APPLICATION.
B) SUBMIT FINISH FLOORING SEAMING DIAGRAMS FOR APPROVAL BY ARCHITECT/DESIGNER PRIOR TO INSTALLATION.
C) FLOOR SURFACE PREPARATION: SURFACES TO BE PREPARED IN ACCORDANCE WITH PRODUCT MANUFACTURER'S RECOMMENDATIONS. FILL AND SMOOTH OUT ALL CRACKS, UNEVEN AND/OR ROUGH SURFACES IN SUBSTRATE WHERE NEW FLOOR COVERING IS TO BE INSTALLED. PRIOR TO INSTALLING FLOOR COVERING, REMOVE ANY AND ALL SUBSTANCES FROM SUBSTRATE, WHICH MAY TELEGRAPH THROUGH FINISH FLOORING.
D) JOINTS IN RESILIENT BASE SHALL NOT OCCUR CLOSER THAN 6" FROM CORNER AND SHALL BE BUTTED TIGHTLY TOGETHER.
E) PROVIDE REDUCER/TRANSITION STRIP BETWEEN DISSIMILAR FINISH FLOOR MATERIALS AT ALL AREAS. PROVIDE SAMPLE FOR ARCHITECT/DESIGNER APPROVAL.
F) MILLWORK SURFACE PREPARATION SHALL INCLUDE PUTTYING OF NAIL HOLES, CRACKS, AND BLEMISHES. PUTTY TO MATCH THE FINISH SURFACE.
G) WALL AND CEILING SURFACE PREPARATION: SURFACES TO BE PREPARED IN ACCORDANCE WITH THE FINISH MATERIAL MANUFACTURERS RECOMMENDATION. CONTRACTOR SHALL CONFIRM AND COORDINATE THE REQUIREMENTS. NO TELEGRAPHING OF WALL OR CEILING IRREGULARITIES WILL BE ACCEPTED.
H) CONTRACTOR SHALL REMOVE ALL ELECTRICAL SWITCHES AND OUTLET PLATES, SURFACE HARDWARE, GRILLE COVERS ETC., BEFORE PAINTING. PROTECT AND REPLACE SAME, IF IN GOOD CONDITION, WHEN PAINTING IS COMPLETE.
J) MISCELLANEOUS ITEMS (GRILLES, REGISTERS, METAL PANELS, ETC.) ON CEILINGS AND WALLS TO BE PAINTED TO MATCH SURFACE COLORS ON WHICH THEY OCCUR, UNLESS OTHERWISE NOTED.
K) CONTRACTOR SHALL FINISH AFFECTED SURFACES TO MATCH THE ADJACENT CONDITIONS. FINISH SURFACES TO THE NEXT LOGICAL JOINT OR WALL/CEILING CORNER UNLESS NOTED OTHERWISE.
FINISH PLAN GENERAL NOTESL) REFER TO THE GENERAL NOTES FOR OTHER APPLICABLE INFORMATION.
M) THRESHOLDS AT RESTROOMS DOORS TO BE TS-2. TRANSITIONS FROM CPT TO RESILIENT TO BE TS-1.
O) ALL CLOSET SHELVING TO BE PLAM-1.
P) SEE FLOOR FINISH PLANS AND/OR WALL FINISH PLANS AT I-110 TO I-121, FOR SPECIFIC FINISH INFORMATION.
Q) ALL WALLS TO BE PT-2 U.N.O.
R) INSTALL ONE (1) COAT HOOK CENTERED ON DOORS AT SINGLE STALL TOILET ROOMS .
S) ALL HOLLOW METAL DOOR & WINDOW FRAMES TO BE PAINTED TO MATCH EXISTING, SEMI-GLOSS FINISH ONLY, U.N.O.
T) EXTEND FLOOR AND WALL FINISHES UNDER AND BEHIND ALL APPLIANCES AND INTO ACCCESSIBLE SINK SPACES. EXTEND FLOOR AND WALL FINISHES UNDER ALL CASEWORK AND EQUIPMENT.
U) SHADED AREAS INDICATE EXISTING FINISHES TO REMAIN, U.N.O.
V) WHERE WALL FINISH VARIES, REFER TO ELEVATIONS FOR ADDITIONAL FINISH INFORMATION.
W) ALL SIGN TEXT (ROOM NAME & NUMBER) TO BE APPROVED BY OWNER PRIOR TO FABRICATION.
X) BASIS OF DESIGN FOR SIGNAGE IS ASI INTOUCH SERIES - REFER TO ELEVATION FOR DESIGN INTENT.
Issues and Revisions:
Commission No:
Drawn by:
Checked by:
SHEET
1295 BANDANA BLVD N, SUITE 200
ST. PAUL, MN 55108-2735
(651) 642-9200 | FAX (651) 642-1101
www.popearch.com
POPE ARCHITECTS, INC.
0" 1/2" 1"
TRUE SHEET SCALE
INFORMATION ON THESE PLANS REGARDING EXISTING STRUCTURE WAS TAKEN FROM EXISTING CONSTRUCTION DOCUMENTS
PROVIDED BY MINNEAPOLIS PUBLIC SCHOOLS. ACTUAL FIELD CONDITIONS MAY VARY FROM
WHAT IS SHOWN. ALL DIMENSIONS, ELEVATIONS AND CONDITIONS OF EXISTING CONDITIONS TO BE FIELD VERIFIED BY CONTRACTOR PRIOR TO
CONSTRUCTION.
3/4/2020 2:08:23 PMC:\Revit Projects\P1-53560-19131 MPS Lyndale ES - R19 -workshared_rlister.rvt
I-110
OVERALL FIRSTFLOOR - FLOOR FINISH
PLAN
RDL
MX
53560-19131
MPS LYNDALECOMMUNITY SCHOOL -
SAFE/SECUREENTRANCE AND
MONUMENT SIGN
312 W 34TH STMINNEAPOLIS, MN
55408
1/8" = 1'-0"I-110
1 OVERALL FIRST FLOOR - FLOOR FINISH PLAN
NORTH
FINISH PLAN KEYED NOTESI01 ENTIRE WALL TO RECEIVE NEW PAINT, PT-2.I02 PAINT TO MATCH ADJACENT WALL FINISH IN COLOR & SHEEN.I04 ROOM SIGNAGE TO BE TYPE A.I05 ROOM SIGNAGE TO BE TYPE B.I06 WAYFINDING SIGNAGE TO BE TYPE C.1.I07 WAYFINDING SIGNAGE TO BE TYPE C.2.I08 PROVIDE OPAQUE VINYL DECAL ON INTERIOR SIDE OF ROOM LOCATIONS WHERE SIGNS ARE
MOUNTED ON GLASS. DECALS TO BE THE SAME SIZE AND COLOR AS ROOM SIGN.
ISSUE FOR BIDDING 02/13/20
ADDENDUM #1 03/04/20
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
F
S
AP
F
F
F
FS
V
V
F
F
F
F
AP
AP
F
F
F
F
K
C
AP
S
F
F
F
F
S
SS
IR
VP
AP
F
F
VP
IR
S S
S S
AP
SS
F
F
S
S
S
S
IR
AP
VP
S
S
S
IR
VP
AP
S
S
C
C
M
MTV
TV
FS
TV
S
S
F
F
SMSSSMSSSMSS
C
FS
SG
B
J
C
FS
FS
C
C
C
C
C
C
M
C
AP
FS MD
FSP
F
C
C
SM
D
SC
RS
VI
SD
C
F
F
S
F
F
S
C
C
F
F
FS
FS
FS
FS F
S
P
P
C
F
C
C
C
C
F S
F S
DH
DH
L2-7
L1-8
L1-4
SRSR
E3
E3
SR
SR
SR
SR
SR
SR SR
SR SRSR
SR
SRSR
E1
E1
CUH
CUH
FIBER & CL
DEMARC
TIME
CONTROL
CENTER
IDF
TERM BLOCKS
MDF
CUH
E50
CUH
E44
E1
L1-6
E14
STORAGE
108C
E64
1
OFFICE
109D
OFFICE
109E
MEDIA OFFICE
107
CORRIDOR
118J
TOILET
112L
TOILET
114
1
8' 16'4'01/8" = 1'-0"ED111
1 LEVEL 1 ELECTRICAL DEMOLITION PLAN
Issues and Revisions:
Commission No:
Drawn by:
Checked by:
SHEET
Date:
I hereby certify that this plan,specification,or report was
prepared by me or under my direct supervision and that I
am a duly Licensed Professional Engineer under the laws of
the State of MINNESOTA
Lic. No:
1295 BANDANA BLVD N, SUITE 200
ST. PAUL, MN 55108-2735
(651) 642-9200 | FAX (651) 642-1101
www.popearch.com
POPE ARCHITECTS, INC.
0" 1/2" 1"
TRUE SHEET SCALE
JAMES STEVEN SOMMER
54049
3/3/2020 1:38:41 PMC:\Autodesk\RevitTemp\MEP19 - MPS Lyndale_drpierce@kfi-eng.com.rvt
ED111
LEVEL 1 ELECTRICALDEMOLITION PLAN
JSS
DRP
19-141
02/13/2020
LYNDALE COMMUNITYSCHOOL -
SAFE/SECUREENTRANCE &
MONUMENT SIGN
312 W 34TH STMINNEAPOLIS, MN
55408
KEYED NOTES
E1 DEMOLISH THE EXISTING PANELBOARD, FEEDER CONDUIT AND CONDUCTORS, NEW PANELBOARD TO BE
PLACED IN SAME LOCATION WHERE POSSIBLE. EXISTING BRANCH CIRCUITS NOT REMOVED THROUGH
OTHER DEMOLITION WORK WILL REMAIN AND BE RECONNECTED TO NEW PANELBOARD.
E3 DEMOLISH POWER AND DATA CONNECTIONS AT FLOOR BOXES. CUT OUT AND REMOVE THE EXISTING
FLOOR BOXES. COORDINATE FLOOR PATCHING WITH GENERAL CONTRACTOR.
E14 EXISTING PAGING SYSTEM TO BE DEMOLISH AND RELOCATED IN NEW OFFICE. MAINTAIN AND EXTEND
ALL EXISTING PAGING SYSTEM CABLE TO NEW LOCATION.
E44 DEMOLISH EXISTING DEVICE MAINTAIN EXISTING CIRCUIT TO BE RE-USED.
E50 DEMOLISH POLE LIGHT. SAVE CIRCUITRY TO BE REUSED. SEE EP SERIES DRAWINGS.
E64 DEMOLISH EXISTING DATA RACK, TERMINAL BLOCK, GROUNDING BAR, AND RELATED EQUIPMENT.
RELOCATE EXISTING FIBER DEMARCATION POINT TO STORAGE ROOM 108C. COORDINATE RELOCATION
OF DEMARCATION POINT WITH UTILITY PROVIDER.
GENERAL SHEET NOTES
A. REFER TO GENERAL DEMOLITION NOTES ON SHEET E-000 AND ELECTRICAL DEMOLITION SPECIFICATION
FOR ADDITIONAL REQUIREMENTS.
B. SEE ARCHITECTURAL DEMOLITION PLANS FOR EXTENT OF WALLS, CEILING AND ROOM FINISHES TO BE
REMOVED.
C. REFER TO SPECIFICATIONS FOR SCOPE OF DEMOLITION FOR EACH SYSTEM.
D. DEMOLISH ALL ELECTRICAL DEVICES IN WALLS TO BE DEMOLISHED OR REFINISHED. WALLS TO BE
DEMOLISHED ARE SHOWN DASHED. DISCONNECT AND REMOVE ASSOCIATED BOXES, CONDUIT AND WIRE
BACK TO SOURCE UNLESS NOTED OTHERWISE. NOT ALL DEVICES TO BE REMOVED MAY BE SHOWN.
E. THE EXISTING INTRUSION DETECTION SYSTEM SHALL BE EXISTING TO REMAIN. PROTECT IN PLACE AND
EXTEND ANY EXISTING CABLING AS REQUIRED TO ACCOMPLISH THE REQUIRED DEMOLITION. PROVIDE
NEW CABLING WHERE REQUIRED. COORDINATE EXTENT OF DEMOLITION WITH ELECTRICAL, MECHANICAL
AND ARCHITECTURAL DEMOLITION DRAWINGS. IF SYSTEM IS DISABLED / CUT DURING CONSTRUCTION, IT
SHALL BE REPAIRED IMMEDIATELY BY THE CONTRACTOR RESPONSIBLE.
F. TEMPORARILY DISCONNECT AND REMOVE WIRELESS ACCESS POINTS TO FACILITATE WORK IN ALL
AREAS WHERE CEILINGS ARE TO BE REMOVED. LABEL EQUIPMENT LOCATION AND RE-INSTALL IN NEW
CEILING AT PREVIOUS LOCATION.
G. TEMPORARILY DISCONNECT AND REMOVE SOUND REINFORCEMENT SPEAKERS AND INFRARED SENSORS
TO FACILITATE WORK IN ALL AREAS WHERE CEILINGS ARE TO BE REMOVED. LABEL EQUIPMENT
LOCATION AND RE-INSTALL IN NEW CEILING AT PREVIOUS LOCATION.
H. VIDEO PROJECTORS ARE TO BE REMOVED, EXCEPT AS NOTED. DISCONNECT AND REMOVE VIDEO
PROJECTORS AND RETURN TO OWNER. DISCONNECT AND REMOVE CONDUCTORS, CABLING, CONTROLS
AND MISCELLANEOUS HARDWARE ASSOCIATED WITH THIS SYSTEM. PROVIDE BLANK COVERPLATES
WHERE REQUIRED.
I. MAINTAIN EXISTING FIRE ALARM SYSTEM AND EXTEND TO NEW LOCATION. REFER TO ET SERIES SHEETS
FIRE ALARM RISER AND SPECFIICATION FOR ADDITIONAL INFORMATION.
NORTH
1
ISSUE FOR BIDDING 02/13/20
1 ADDENDUM 1 03/04/20
REF.
ACCACC
ACC
AC
C
S
S
S
S
S
S
S
S
S
S
F
S
AP
F
F
F
F S
V
V
F
F
FF
S
S
S
S
IR
AP
VP
S
S
S
S
C
C
M
MTV
TV
F S
TV
S
S
F
F
C
C
F S
F
AP
AP
IR
IR
AP
S
S
S
S
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
F
F
F S
F S
F S
F S F S
F
F
F
F
F
F
F
F
F
F
FF
FF
F
F
F
F
F
F
S
F
FF
F
S
S
S
S
F
S
S
C
F
C
C
C
C
F
S
S
S
F
F
F
F
C
C
CC
C
C
C
F
F
S
S
S
S
F SF S
T
FAA
FAA
E5
E5
E5
FB1
FB1
FB1
SRSR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SEE SECURITY PLANS -TY SERIES - FOR SECUREDENTRY DEVICE INSTALLATION
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
E58
E55
DH
DH
TIMECONTROLCENTER
FB1
E5
STAFFBREAKROOM
115
CLASSROOM
113
CL.
122
WORKROOM
112I
OFFICE
112H
OFFICE
112F
CORRIDOR
112C
HEALTH OFFICE
112J
OFFICE
112EOFFICE
112D
CHECKIN
112B
TOILET
112K
TOILET
112LTOILET
116
TOILET
114
WAITING
112A
SECUREVESTIBULE
118IWOMEN'SLOCKERS
109A
MEN'S LOCKERS
109B
GYM 110
110
Room
109F
CORRIDOR
118J
CLASSROOM
120
LIBRARY
1
CONFERENCEROOM
111
MEDIA OFFICE
107
OFFICE
109D
OFFICE
109E
GYM 109
109
STORAGE
109C
PA
PA
PA
PA
PA
PA
PA
PA
E61
E61
E61
E61
E61
E61
E61
E61
E61
E61
E61E61
E61
E61
E61
E61
E61
E61
E61
E61
E61
E61
E61 E61
E61
E61
E61
E61
E61
E62
E55
E63
AC
STORAGE
108C E65
E66
1
8' 16'4'01/8" = 1'-0"ET111
1 LEVEL 1 TECHNOLOGY PLAN - AREA B
Issues and Revisions:
Commission No:
Drawn by:
Checked by:
SHEET
Date:
I hereby certify that this plan,specification,or report was
prepared by me or under my direct supervision and that I
am a duly Licensed Professional Engineer under the laws of
the State of MINNESOTA
Lic. No:
1295 BANDANA BLVD N, SUITE 200
ST. PAUL, MN 55108-2735
(651) 642-9200 | FAX (651) 642-1101
www.popearch.com
POPE ARCHITECTS, INC.
0" 1/2" 1"
TRUE SHEET SCALE
JAMES STEVEN SOMMER
54049
3/3/2020 1:37:50 PMC:\Autodesk\RevitTemp\MEP19 - MPS Lyndale_drpierce@kfi-eng.com.rvt
ET111
LEVEL 1TECHNOLOGY PLAN
JSS
DRP
19-141
02/13/2020
LYNDALE COMMUNITYSCHOOL -
SAFE/SECUREENTRANCE &
MONUMENT SIGN
312 W 34TH STMINNEAPOLIS, MN
55408
KEYED NOTES
E5 PROVIDE 1 ¼” SPARE CONDUIT TO UNUSED COMPARTMENT IN 4 COMPARTMENT FLOOR BOX. STUB UPABOVE ACCESSIBLE CEILING, PROVIDE BUSHING, CAP END AND LABEL CONDUIT FOR FUTURE A/V TOFLOOR BOX. PROVIDE 1” CONDUIT FOR DATA OUTLET.
E55 PROVIDE MUTING RELAY(S) ATLAS SOUND AA-PPRC OR SIMILAR FOR SOUND SYSTEM IN SPACE. MUTESOUND SYSTEM UPON FIRE ALARM OUTPUT.
E58 TAP LOWER DUE TO PROXIMITY TO VCA.
E61 PROVIDE A FIRE ALARM DEVICE THAT IS COMPATIBLE WITH THE EXISTING SYSTEM. EXTEND EXISTINGCIRCUITS TO NEW LOCATION AND REZONE. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
E62 RELOCATE EXISTING PAGING SYSTEM. EXTEND ALL CABLES TO NEW LOCATION. CONTRACTOR TOPROVIDE ALL ADDITIONAL PART NEEDED TO PROVIDE A COMPLETE OPERATIONAL SYSTEM AS IN THEORIGINAL LOCATION.
E63 PROVIDE SURFACE MOUNTED RACEWAY FROM ABOVE THE CEILING TO FIRE ALARM ANNUNCIATOR ASNEEDED.
E65 EXTEND CABLING FOR EXISTING TO REMAIN CAMERAS THAT WHERE FED FROM DEMOLISHED RACK INOLD OFFICE. REFER TO SHEET ED111.
E66 LOCATION OF RELOCATED FIBER DEMARCATION POINT. COORDINATE EXACT LOCATION ON FIELD.
GENERAL SHEET NOTES
A. REFER TO GENERAL TECHNOLOGY NOTES ON SHEET E-000 AND ELECTRICAL SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
B. SEE ARCHITECTURAL PLANS FOR EXTENT OF WALLS, CEILINGS AND ROOM FINISHES TO BE INSTALLED.
C. REFER TO SPECIFICATIONS FOR SCOPE OF WORK REQUIRED FOR EACH SYSTEM.
D. EXTEND OR PROVIDE NEW INTRUSION DETECTION SYSTEM CABLING TO RE-INSTALL IN RENOVATED SPACE. SYSTEM TO REMAIN FUNCTIONAL DURING CONSTRUCTION. COORDINATE ANY PARTIAL AREA SHUTDOWNS REQUIRED FOR EXPANSION OR RECONNECTION WORK WITH OWNER.
E. REINSTALL EXISTING WIRELESS ACCESS POINTS TO IN ALL AREAS WHERE CEILINGS WERE RENOVATED. REFER TO LABELED EQUIPMENT LOCATION AND RE-INSTALL IN NEW CEILING AT PREVIOUS LOCATION OR AS DIRECTED BY OWNER.
F. REINSTALL SOUND REINFORCEMENT SPEAKERS AND INFRARED SENSORS IN ALL AREAS WHERE CEILINGS WERE RENOVATED. REFER TO LABELED EQUIPMENT LOCATION AND RE-INSTALL IN NEW CEILING AT PREVIOUS LOCATION OR AS DIRECTED BY OWNER.
NORTH
ISSUE FOR BIDDING 02/13/20
1 ADDENDUM 1 03/04/20
REF.
T
T
T
T
T
T
T
T
T
T
T
T
T
VAV-1.10
Htg: 2.5
VAV-1.11
Htg: 3
VAV-1.12
Htg: 4.2
VAV-3.1
Htg: 3.5
VAV-3.9
Htg: 1.9 VAV-3.10
Htg: 1.6
VAV-3.8
Htg: 1.6
VAV-3.7
Htg: 1.6
VAV-3.6
Htg: 1.6
VAV-3.5
Htg: 1.9
RCT-6
Htg: 1.8
CUH-8
Htg: 6.2
2" GHWS
2 1/2" GHWRR
3/4"3/4"
2" GHWS
3/4"3/4"
3/4"3/4"
2" GHWS3" GHWRR
3/4"3/4"
3" GHWRR
2" GHWS
3/4"
3/4"
3/4"3/4"
1"1"
2" GHWS
2" GHWRR
2" GHWRR2" GHWS
3/4"3/4"
2" GHWRR
2" GHWS
3/4"
2" GHWRR2" GHWS
RCT-10
Htg: 1.8
VAV-3.4
Htg: 4.2
RCT-5
Htg: 1.8RCT-5
Htg: 1.8
2 1/2" GHWRR
RCT-5
Htg: 1.8
CUH-7
Htg: 6.2
RCT-5
Htg: 1.8
RCT-5
Htg: 1.8
RCT-5
Htg: 1.8
<
<
<
<
<
<
<>
>
>>
>
>
>
>
>
3/4"3/4"
3/4"
3/4"
>
MP17
1"1"
LIBRARY
1
CLASSROOM
113
CLASSROOM
120
CONFERENCEROOM
111
MEDIA OFFICE
107
OFFICE
109D
OFFICE
109E
Room
109F
STORAGE
109C
GYM 109
109
GYM 110
110
WOMEN'SLOCKERS
109A
MEN'S LOCKERS
109B
SECUREVESTIBULE
118I
CORRIDOR
118J
TOILET
114TOILET
116
TOILET
112L
TOILET
112K
HEALTH OFFICE
112J WAITING
112A
CHECKIN
112B
CORRIDOR
112C
OFFICE
112D
OFFICE
112E
OFFICE
112F
OFFICE
112H
WORKROOM
112I
CL.
122
BOYS' TOILET
117
GIRLS' TOILET
119
STAFFBREAKROOM
115
(E) 2" GHWRR
(E) 1 1/2" GHWS
3" GHWRR
2" GHWS
2" GHWRR
2" GHWS
2 1/2" GHWRR2" GHWS
MP17
MP17
MP17
MP17
MP17
MP17
MP17
MP17
MP17
MP17
MP15 MP15
MP15
MP15
MP23
3/4"
MP24
MP24
MP17
2" GHWS
MP22
MP22
2" GHWRR
MP15
MP15
MP15
MP15
MP15
MP15 MP15
MP24
MP24
MP14
MP22
MP25
MP25
MP25
MP25
MP25MP25
MP25
MP18MP18
MP18
MP18
MP26
MP18
3/4"3/4"
1 1/4"1 1/4"
1"
1"
1
1
1
1
1
M17
3/4"
3/4"
1
Issues and Revisions:
Commission No:
Drawn by:
Checked by:
SHEET
Date:
I hereby certify that this plan,specification,or report was
prepared by me or under my direct supervision and that I
am a duly Licensed Professional Engineer under the laws of
the State of MINNESOTA
Lic. No:
1295 BANDANA BLVD N, SUITE 200
ST. PAUL, MN 55108-2735
(651) 642-9200 | FAX (651) 642-1101
www.popearch.com
POPE ARCHITECTS, INC.
0" 1/2" 1"
TRUE SHEET SCALE
LARRY G. JUSTIN
22460
3/3/2020 12:45:58 PMC:\Users\ajentenza\Documents\MEP19 - MPS Lyndale_ajentenza.rvt
MP111
LEVEL 1 HYDRONICPLAN
LGJ
AJE
19-141
02/13/2020
LYNDALE COMMUNITYSCHOOL -
SAFE/SECUREENTRANCE &
MONUMENT SIGN
312 W 34TH STMINNEAPOLIS, MN
55408
KEYED NOTES
M17 REPLACE EXISTING EXHAUST FAN ON ROOF WITH NEW EXHAUST FAN. PROVIDECURB ADAPTOR & EXTEND/RECONNECT DUCTWORK AS REQUIRED. PROVIDE NEWMOTORIZED DAMPER. REFER TO DETAIL 11/M503.
MP14 INSTALL CABINET UNIT HEATER AT LOCATION OF REMOVED. COORDINATE WITHGENERAL CONTRACTOR ON WALL WORK AND REPAIR AS NEEDED. REFER TODETAIL (3-WAY CONTROL VALVE).
MP15 CONNECT GHWS/R TO VAV. REFER TO DETAIL (2-WAY CONTROL VALVE)
MP17 INSTALL TEMPERATURE SENSOR AT LOCATION OF REMOVED IF POSSIBLE
MP18 RADIANT CEILING PANEL. REFER TO DETAIL AND COORDINATE WITHMANUFACTURER ABOUT SITE SPECIFIC INSTALLATION REQUIREMENTS
MP22 CONNECT TO TO EXISTING GHWS/R ; CONFIRM SIZE.
MP23 PROVIDE 3/4" GHWS/R WITH VALVE AND CAP FOR FUTURE VAV.
MP24 CAP FOR FUTURE CONNECTION. PROVIDE SHUT-OFF VALVE.
MP25 CONNECT TO EXISTING GHWS/R ABOVE. PROVIDED ISOLATION VALVE ATCONNECTION. CONFIRM SIZE.
MP26 INSTALL CEILING MOUNTED CABINET UNIT HEATER. REFER TO DETAIL 10/M-510
NORTH
8' 16'4'01/8" = 1'-0"MP111
1 LEVEL 1 HYDRONIC PIPING PLAN
ISSUE FOR BIDDING 02/13/20
1 ADDENDUM 1 03/04/20
1