Addendum No. 2 Project MTC 16-001 (MRN01.01)
1
Date February 8th, 2018
Project Title Project MTC 16-001 Cadaver Lab and HTC Renovation Marion Technical College Marion, Marion County, Ohio
To All Plan Holders
Purpose Modify the Bid Documents
Distribution All Plan Holders Marion Technical College Design Team
TO ALL BIDDERS:
This Addendum supplements and amends the original Plans and Specifications and shall be taken into account
in preparing proposals and shall become a part of the contract documents.
REQUESTS FOR INTERPRETATIONS:
Item 1. Q. Who pays for the “authorized independent physicist to inspect the lead lined partitions?
A. Refer to spec. section 00 72 13, 3.3.1. The architect will apply for, secure, and pay for special inspections.
Item 2. Q. Door 168 is an existing door to be reused. Is the frame to be reused as well?
A. Yes, reuse and reinstall existing door frame.
Item 3. Q. Does the Lead lined frame get relocated along with the door? Drawings mention door only.
A. Yes, relocate frame as well.
Item 4. Q. Verify that all restroom accessories are provided by owner.
A. Please refer to Toilet Accessory Schedule on sheet H-A600. Any necessary accessories for the Cadaver Lab will also be owner furnished, contractor installed.
Item 5. Q. How are we addressing the saw cutting that extends into Hall 111, there will be carpet to patch? Does the owner have any of this carpet left over as attic stock?
A. Resilient flooring will be installed in this location. Refer to revised sheet C-A101 (sheet re-issued).
Item 6. Q. I want to verify that we are to bid the metal cabinets by quantities stated on the drawings.
A. Yes. Per metal casework legend on sheet C-A600, “confirm quantities with casework elevations and casework schedule. Report discrepancies to architect”.
Item 7. Q. Is the contractor responsible for the asbestos abatement?
A. Yes, refer to spec. section 02 82 20 and sheet C-HM101. Note: Hazardous Materials Assessment Report is included in specification.
Addendum No. 2 Project MTC 16-001 (MRN01.01)
2
Item 8. Q. Please provide more detail on the tall wood cabinets in the Cadaver Lab. Glass type, glass thickness, door thickness and verify that these are plastic laminate finish.
A. Add the following to spec. section 06 40 23 (section not re-issued):
a. “2.02 CABINET HARDWARE AND ACCESSORIES
M. Glass for Glazed Doors: Clear tempered glass complying with ASTM C 1048, Kind FT, Condition A, Type I, Class 1, Quality-Q3; not less than 5.0 mm thick.
Item 9. Q. Door jamb detail on sheet H-A700 shows a ½” rounding on the door jamb edges. Could you clarify this detail?
A. This is just a graphic misrepresentation. Sealant should be provided on both sides of door frame. Refer to drywall jamb detail on sheet C-A700 for clarification.
Item 10. Q. Can you provide a model # for the wall mounted beds?
A. Please use Hausmann Industries Model 4075 Wall Folding Treatment/Changing Table as a basis of design.
Item 11. Q. Can you provide a detail for the mechanical pad screen wall and screen wall doors? Will this be painted?
A. See revised sheet C-A700. Design should match that of existing mechanical screen wall on campus as closely as possible. All components of wall to be powder-coated to match existing (sheet re-issued).
Item 12. Q. Drawings for equipment pad says to verify pad size with equipment size. Pad will be bid as 40’x13’.
A. That is correct. Ensure that north and south end of equipment pad align with center of pilasters on column lines 4 and 5.
Item 13. Q. Provide casework end panel type in room 112B.
A. Casework end panel to be Wilsonart, Dove Grey (D92-60).
Item 14. Q. What is the type of finish for cubbies?
A. Plastic laminate. Refer to elevation 4/C-A600.
Item 15. Q. Are there any allowances on the project?
A. No. Please refer to item 12 on addendum 1.
Item 16. Q. In the communications specifications, 27 10 00. 1.1.B, it states that Black Box is to provide and install the data/voice work. Is Black Box contracted through the College to do the work, or do we need to include their price with our price? If we need to include their price, will any equal contractors be accepted to do the data/voice work?
A. The contractor shall include Black Box’s price in the bid. The College has standardized on Black Box products and installation; no equals should be accepted unless approved by the College.
Item 17. Q. Will all the casework be metal?
A. Please refer to Metal Casework Legend on sheet C-A600 for extent of metal casework.
Item 18. Q. Who will be responsible for the permit fees, GC or owner?
A. Please refer to spec. section 00 72 13, 5.2.
Item 19. Q. Do you have carpet specs? (Patch areas)
A. Refer to revised sheet C-A101.
Addendum No. 2 Project MTC 16-001 (MRN01.01)
3
Item 20. Q. Would there be an issue with working longer days or weekends?
A. Please refer to spec. section 00 72 13, 6.10.5.3.
Item 21. Q. Do you have a manufacturer of the surgical light and camera?
A. The contractor shall furnish and install the surgical lights, double articulating arms, and cameras as described in Coded Note #1 on sheet C-E101. Manufacturer and model numbers are listed in the note.
Item 22. Q. Sheet C-H101 shows a 22x10 return duct from IDF-1 going into the South Corridor? Does terminate with just a grill below the ceiling in this corridor? I am curious why this duct would go outside of the Cadaver Lab?
A. The 22”x10” exhaust duct going to the south of the lab room should drop down in the chase by the door. The duct then extends down to the floor and a Type D grille is mounted at 12” above the floor. Provide a manual damper in the 22”x10” duct above the ceiling in the lab. This should be the same for the 22”x10” duct and grille located adjacent to the prep room in the lab.
Item 23. Sheet C-H101 RTU-1 Note #6 “Furnish unit with BACNET Interface for BAS integration”. Do we just bid providing the equipment with the BACNET and owner is doing the tie-in with their controls contractor?
A. The equipment being provide by the HVAC contractor shall be tied into the existing temperature controls contractor. The temperature controls contractor will be Siemens and their work shall be provided under the HVAC contractor.
Item 24. Q. Are lifts able to be used in either building?
A. Only electric lifts may be used. Per the specifications, the contractor is responsible for any damage caused by these lifts.
Item 25. Q. I don’t see any lab casework. Did you delete the following specification sections :12 35 53 Laboratory Casework, 11 53 63 Laboratory Accessories, 11 53 43 Laboratory Service Fittings and Fixtures, and 11 53 13 Laboratory Fume hoods?
A. These spec. sections were included in the project manual. Information for the metal casework is on sheet C-A600.
Item 26. Q. What kind of ductwork insulation are they requiring for this installation (liner, external wrap and R value)?
A. Supply air ductwork inside the building shall be wrapped with 1-1/2” fiberglass insulation.
B. Exterior ductwork shall be provided with 2” rigid duct board with aluminum jacket and banding. Provide a high point on top of the ductwork to shed the water off the top of the duct. See revised specification information listed below.
Item 27. Q. As for the ductwork that will be on the outside of the building what kind of detail for insulation for ductwork will be required for that?
A. Exterior ductwork shall be provided with 2” rigid duct board with aluminum jacket and banding. Provide a high point on top of the ductwork to shed the water off the top of the duct. See revised specification information listed below.
Item 28. Q. Since this is such a high volume of air I suggest using "Ductmate" connectors. This basically requires a flanged connection that bolts together. Will that be sufficient?
A. Flanged duct connections are acceptable.
Addendum No. 2 Project MTC 16-001 (MRN01.01)
4
Item 29. Q. What is going to be the required air temperature for the structure?
A. The required air temperature shall be 75 degrees for summer and 72 for the winter condition.
Item 30. Q. Specification section 26 05 33 2.05 B states “all electrical metallic tubing (EMT) conduits shall be compression fittings” but section 3.01 B states “concealed or exposed conduit .75 inch up to 1.75 inch, shall be EMT with set screw fittings.” Please advise which is required; set screw fittings or compression fittings.
A. Set screw fittings are acceptable.
Item 31. Q. If MC cables are not allowed in walls, will the general contractor be cutting and repairing slots in existing walls to install conduit to new outlets?
A. Flexible metallic conduit will be acceptable for fishing existing walls. Flexible conduit shall transition to EMT within 6’ of entering/exiting the wall.
SPECIFICATIONS REVISIONS:
Item 32. Section 06 40 23 revised to include glazed doors in casework (see above) (section not re-issued).
Item 33. Following paragraph added to section 06 40 23 (section not re-issued):
A. 2.03 MISCELLANEOUS MATERIALS
D. Hardboard Pegboard: 1/4-inch-thick perforated hardboard, complying with
ANSI A135.4, Class 1 tempered.
Item 34. Section 23 07 00 – HVAC Insulation. Revise Paragraph 3.02 to read as follows (section not re-
issued):
A. “3.02 Insulate Supply Air and exhaust Air Ducts. Cover as follows:
A. All supply air ducts shall be insulated with 1-1/2" thick, 1 lb. density blanket
flexible duct insulation.
B. Adhere insulation to duct surface with Foster No. 85-20 adhesive applied in 6" wide
strips on 12" centers. Butt all edges of insulation and seal all joints with a foil-skrim-kraft
tape or flange adhered over the joint. Secure insulation with flare door staples until the
adhesive sets.
C. Seal all breaks and joints in vapor barrier with 2-1/2" wide pressure sensitive tape
to match vapor barrier facing. Adhere with Foster 85-20 adhesive where necessary.
D. Cover all round low pressure supply air ductwork (including that on the
downstream side of the air terminal boxes).
E. Exterior supply and exhaust ductwork shall be covered with 2” rigid, 6 lb./cu.ft.
density rigid duct insulation. Cover insulation with 0.016” embossed aluminum jacket and
banding. Jacket shall factory colored to match existing brick wall. Seal all joints watertight.
Provide a high point on top of ductwork to shed water.”
Item 35. Section 23 31 13.16 – High Pressure Ductwork
A. Delete Specification section in its entirety.
Item 36. Section 23 34 13 – Laboratory Exhaust Fans
A. Revise entire section (section re-issued).
Item 37. Section 23 36 16 – Medium Velocity VAV/CV boxes
A. Delete Specification section in its entirety.
Item 38. Section 23 36 18 – Laboratory Airflow Control System
A. Delete Specification section in its entirety.
Item 39. Section 23 75 00 – Single Zone Rooftop Unit.
A. Add the entire section attached.
Addendum No. 2 Project MTC 16-001 (MRN01.01)
5
Item 40. Section 25 00 00 – Building Management System
A. Revise entire section (section re-issued).
Item 41. Section 25 90 00 – Sequence of Operations
A. Revise entire section (section re-issued).
Item 42. Section 26 05 33 – Raceway and Boxes for Electrical Systems
A. Revise entire section (section re-issued).
DRAWING REVISIONS:
Item 43. Resilient flooring added to corridor on sheet C-A101 (sheet re-issued). Item 44. Equipment Screen Elevation added to sheet C-A700 (sheet re-issued). Item 45. Drawings C-H101 – HVAC Plans (sheet not re-issued).
A. RTU Schedule – Delete remark 8 from the schedule. Unit to be provided with gas heat. B. Revise all the 24”x16” supply air ductwork from the unit plenum curb and in the building to
38”x16” ductwork C. Revise all the 24”x16” exhaust ductwork from the exhaust fan and in the building to
38”x16”
ATTACHED:
SPECIFICATIONS: 23 34 13 – LABORATORY EXHAUST FANS
23 75 00 – SINGLE ZONE RTUS
25 00 00 – TEMPERATURE CONTROLS
25 90 00 – SEQUENCE OF OPERATIONS
26 05 33 – RACEWAY AND BOXES
SHEETS: C-A101 FIRST FLOOR PLAN, DEMO PLAN, RCP’S AND LIFE SAFETY PLAN
C-A700 DOOR SCHEDULE, DETAILS, AND PARTITION TYPES
MISCELLANEOUS: N/A
END OF ADDENDUM No. 02
Marion Technical College BHDP-MRN01.01 February 7, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
LABORATORY EXHAUST FANS 23 34 13-1
SECTION 23 34 13 - LABORATORY EXHAUST FANS
PART 1 GENERAL
1.1 REFERENCE
A. Section 23 0105, Paragraph 1.05 - OHIO ENERGY CODE
B. Section 25 0000 - TEMPERATURE CONTROLS
C. AMCA -99-10 Standards Handbook.
D. AMCA 204-05 - Balance Quality and Vibration Levels for Fans.
E. AMCA 205-12 – Energy Efficiency Classification for Fans.
F. AMCA 210-07 - Laboratory Methods of Testing Fans for Aerodynamic Performance
Rating.
G. AMCA 211-13 – Certified Ratings Program - Product Rating Manual for Fan Air
Performance.
H. AMCA 260-13 - Laboratory Methods of Testing Induced Flow Fans for Rating.
I. AMCA 300-08 - Reverberant Room Method for Sound Testing of Fans.
J. AMCA 311-05 - Certified Ratings Program.
K. AFMBA - Method of Evaluating Load Ratings of Bearings (ASA - B3.11).
L. AMCA 500 - Test Methods for Louvers, Dampers and Shutters.
M. SMACNA - Medium Pressure Plenum Construction Standard.
N. ANSI Z9.5 - Laboratory Design.
O. ASHRAE - Laboratory Design Guide.
P. ASTM D4167-97 - Standard Specification for Fiber-Reinforced Plastic Fans and
Blowers.
1.2 SCOPE
A. Furnish laboratory exhaust fan IDF-1 with size, capacity and appurtenances as herein
specified.
1.3 QUALITY ASSURANCE
A. Performance ratings: Conform to AMCA standard 205, 211, 260 and 311. All fans shall
be licensed to bear the AMCA ratings seal for FEG ratings (AMCA 205), Air
Performance (AMCA 210), Sound Performance (AMCA 300), and Induced Flow for
high plume dilution fans (AMCA 260). Acceptable manufacturers whose equipment are
not licensed to bear the AMCA seal for Sound, Air Performance and Induced Flow must
submit performance tests conducted by an independent third party at a registered AMCA
test facility, and certified for accuracy (stamped) by a registered professional engineer (at
the manufacturers expense).
B. Classification for Spark Resistant Construction Conform to AMCA 99.
Marion Technical College BHDP-MRN01.01 February 7, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
LABORATORY EXHAUST FANS 23 34 13-2
C. All fans prior to shipment shall be completely assembled and test run as a unit at the
specified operating speed or maximum RPM allowed for the particular construction type.
Each wheel shall be statically and dynamically balanced in accordance with
ANSI/AMCA 204 “Balance Quality and Vibration Levels for Fans” to Fan Application
Category BV-3, Balance Quality Grade G6.3. Balance readings shall be taken by
electronic type equipment in the axial, vertical, and horizontal directions on each of the
bearings. Records shall be maintained and a written copy shall be available upon request.
1.5 SUBMITTALS
A. Provide dimensional drawings and product data on each high-plume dilution laboratory
exhaust fan assembly.
B. Provide fan curves for each fan at the specified operation point, with the flow, static
pressure and horsepower clearly plotted.
C. Provide nozzle velocity of exhaust fan, total exhaust flow, and discharge plume height at
specified wind velocity.
D. Strictly adhere to QUALITY ASSURANCE requirements of AMCA CERTIFICATION,
as stated in section 1.04.A of this specification, and provide QC certificate as stated in
section 1.04.C of this specification.
E. Provide AMCA Certified FEG minimum acceptable rating values of FEG 67-71 (fan
sizes 1225-1500), and FEG 80 (fan sizes 1825-6000).
PART 2 PRODUCTS
2.01 GENERAL
A. Base fan performance at standard conditions (density 0.075 Lb/ft3).
B. Each fan shall be direct driven in AMCA arrangement 4 or 8, according to drawings.
C. Fans to be equipped with lifting lugs.
D. Fan stand shall be coated steel with a minimum of 4-6 mil electrostatically applied
Plastifer™ baked Polyester powder coating.
E. Fasteners to be 304 stainless steel.
2.02 FAN HOUSING AND OUTLET
A. Fan housing to be aerodynamically designed with high-efficiency inlet, engineered to
reduce incoming air turbulence. Casings to be smooth exterior and resin rich interior.
B. Fan housing shall be manufactured in specifically formulated resins, for maximum
corrosion resistance, and reinforced with fiberglass for structural strength. Fastening
bolts holding the casing to the support plate are to be encapsulated in FRP. No uncoated
metal fan parts in the corrosive air stream will be tolerated.
C. A bifurcated fiberglass reinforced plastic (FRP) discharge nozzle shall be supplied by the
fan manufacturer and be designed to efficiently handle an outlet velocity of up to 7,000
FPM. The discharge shall include a venturi and fiberglass wind band to induce ambient
air.
D. All fiberglass parts shall include UV inhibitors in the resins to prevent chalking from the
sunlight. Flame retardancy of 25 or less, is standard.
Marion Technical College BHDP-MRN01.01 February 7, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
LABORATORY EXHAUST FANS 23 34 13-3
E. A graphite liner and grounding strap shall be included to remove any possible build up of
static electricity, if noted on the equipment schedule.
F. An integral fan housing drain shall be used to drain rainwater when the fan is de-
energized.
G. A bolted housing access door shall be supplied for impeller inspection.
H. Standard finish color to be light gray.
I. Hub seal to be neoprene or Teflon, if noted on the equipment schedule.
J. On AMCA arrangement 8 fans, M. K. Plastics will supply a Vacuum Hub Seal to avoid
any contaminated air from escaping (patent pending), if noted on the equipment
schedule.
2.03 FAN IMPELLER
A. Impellers on 1225 and 1500 fans shall be solid, molded FRP with backward inclined
blades. Impellers larger than 1500 shall be backward curved airfoil. A metal backplate
integral to the FRP impeller and encapsulated in resin shall have the hub extending to the
outside of the fan housing. A tight fitting removable FRP cap shall cover the impeller
end of the shaft. Impellers manufactured in coated steel are not acceptable.
2.04 FAN INLET ELBOW/PLENUM
A. For constant volume systems, the fan shall be connected directly to duct without the need
of bypass damper.
B. For variable volume systems, an inlet elbow/plenum shall be provided as shown on
drawings. The elbow/plenum shall be equipped with a bypass air damper(s) and
fiberglass reinforced plastic (FRP) weather cowl and birdscreen, for introducing outside
air at roof level upstream of the fan. As standard, the plenum shall be constructed of
double wall, thermally and acoustically insulated, 1” thick K-Kore™ fiberglass panels,
bonded, reinforced and sealed together to prevent noise and air leakage.
C. Bypass plenum shall be mounted on an insulated curb. An optional combination integral
fan platform plenum curb shall be provided by the fan manufacturer, if shown on the
equipment schedule and project drawings.
D. Inlet elbow/plenum to be attached to the fan inlet by a flexible FPVC connector,
provided by the fan manufacturer.
E. Bypass air damper(s) shall be opposed-blade, airfoil design, constructed of either
fiberglass reinforced plastic (FRP), or extruded aluminum with a clear anodized finish,
(as indicated on the equipment schedule and project drawings), with linkage hardware
installed in the side frame. Each bypass damper shall be housed inside a fiberglass
reinforced plastic (FRP) weather cowl and birdscreen, to prevent the possibility of
rainwater entrainment.
F. Fan isolation damper(s) shall be parallel-blade, airfoil design, constructed of either
fiberglass reinforced plastic (FRP), or extruded aluminum with a clear anodized finish,
(as indicated on the equipment schedule and project drawings), with linkage hardware
installed in the side frame. Each isolation damper shall be housed inside a fiberglass
reinforced plastic (FRP) damper enclosure, bolted to the bypass air plenum with a round
slip connection at one end for fan inlet attachment.
Marion Technical College BHDP-MRN01.01 February 7, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
LABORATORY EXHAUST FANS 23 34 13-4
G. All dampers shall have an extended control shaft for electronic, pneumatic or manual
control actuation.
2.05 FAN MOTORS AND DRIVE
A. Motors to be premium efficiency, standard NEMA frame, 900, 1200 or 1800 RPM,
TEFC with a 1.15 service factor. A factory mounted NEMA 3R or 4X disconnect switch
shall be provided for each fan.
B. Fans shall be AMCA arrangement 4, (as standard). Where access and handling of the fan
components during motor replacement is of concern, (due to hazardous exhaust), fans
shall be AMCA arrangement 8, direct mount coupling connecting the motor shaft to the
fan impeller shaft. Motor, coupling, and bearings shall all be outside the contaminated
exhaust, and be capable of replacement without disassembling fan.
C. For arrangement 8 fans, fan bearings shall be sized for a minimum life of (AFBMA L10)
- 200,000 hrs.
D. If noted on the fan schedule, direct drive AMCA arrangement 4 fans shall include ‘EZ-
4®’ Construction to provide full access to the impeller and motor for maintenance,
cleaning, inspection and removal. The removal of the motor or fan impeller shall be
accomplished by unbolting the fan back plate and unbolting the motor base sub-assembly
from the fan base. The motor/impeller assembly shall then slide back on the fan base,
away from the fan housing.
2.06 Laboratory exhaust fans by Strobic, Twin City, PennBarry or Greenheck of the same size, type
and capacity, can be bid as equals.
PART 3 EXECUTION
3.1 Starters and wiring by the Electrical Contractor. The disconnect switch shall be field mounted
and wired so it is mounted in accessible location from the roof without a ladder.
3.2 Roof openings and flashing for weatherproofing by the General Contractor.
3.3 Fan to be mounted on 18” curb furnished with the fan system. The HVAC contractor to
coordinate exact dimension of the fan with the general contractor for proper support of the fan.
END OF SECTION 23 34 13
Marion Technical College BHDP-MRN01.01 February 7, 2018
Cadaver Lab and HTC Renovation Addendum 2
Marion, Ohio
SINGLE ZONE ROOFTOP UNIT 23 75 00-1
SECTION 237500 - SINGLE ZONE ROOFTOP UNITS
PART 1 – GENERAL
1.01 REFERENCE
A. Section 23 05 13 - Electrical Work
B. Section 23 31 13.13 - Low Pressure Ductwork
C. Section 25 00 00 - Temperature Controls
1.02 SCOPE
A. Furnish and install packaged, single zone, constant volume and variable volume rooftop
air handling units with arrangements and capacities as shown on drawings.
B. Unit shall be furnished completely factory assembled and tested, including all controls.
C. The unit shall operate on 460 volt, 60 Hertz, 3 phase electric service.
D. The units shall be completely factory assembled, piped, wired, tested and shipped in one
piece with a single point power connection. Outside air system, power exhaust system,
economizer, filters, switches, supply air fan system, microprocessor operating controls
and safety controls shall be furnished and factory installed. Units shall be specifically
designed for outdoor application and include a weatherproof cabinet with insulated
bottom panels.
E. Units shall be provided with direct expansion cooling. Units shall be shipped fully
charged with Refrigerant 410A.
F. Unit shall have decals and tags to indicate caution areas and aid unit service. Unit
nameplates shall be fixed to the deadfront cover in the main control panel. Electrical
wiring diagrams shall be attached to the outside of control panels. Installation and
maintenance bulletins shall be supplied with each unit.
1.03 QUALITY ASSURANCE
A. Packaged air-cooled condenser units shall be certified in accordance with ANSI/AHRI
Standard 340/360 performance rating of commercial and industrial unitary air-
conditioning and heat pump equipment.
B. Unit shall be certified in accordance with UL Standard 1995/CSA C22.2 No. 236, Safety
Standard for Heating and Cooling Equipment.
C. Unit and refrigeration system shall comply with ASHRAE 15, Safety Standard for
Mechanical Refrigeration.
Marion Technical College BHDP-MRN01.01 February 7, 2018
Cadaver Lab and HTC Renovation Addendum 2
Marion, Ohio
SINGLE ZONE ROOFTOP UNIT 23 75 00-2
D. Unit shall be certified in accordance with ANSI Z21.47b/CSA 2.3b and ANSI Z83.8/CSA
2.6, Safety Standard Gas-Fired Furnaces.
E. Unit Energy Efficiency Ratio (EER) shall be equal to or greater that prescribed by
ASHRAE 90.1, Energy Efficient Design of New Buildings except Low-Rise Residential
Buildings.
F. Unit shall be safety certified by ETL and ETL US listed. Unit nameplate shall include the
ETL/ETL Canada label.
1.04 SUBMITTALS
A. Product Data: Literature shall be provided that indicates dimensions, operating and
shipping weights, capacities, ratings, fan performance, filter information, factory supplied
accessories,electrical characteristics and connection requirements. Installation, Operation,
and Maintenance manual with startup requirements shall be provided.
B. Shop Drawings: Unit drawings shall be provided that indicate assembly, unit dimensions,
construction details, clearances and connection details. Computer generated fan curves for
each fan shall be submitted with specificdesign operation point noted. Wiring diagram
shall be provided with details for both power and control systems and differentiate
between factory installed and field installed wiring.
1.05 Delivery, Storage, and Handling
A. Unit shall be shipped with doors screwed shut and outside air hood closed to prevent
damage during transport and thereafter while in storage awaiting installation.
B. Follow Installation, Operation, and Maintenance manual instructions for rigging, moving,
and unloading the unit at its final location.
C. Unit shall be stored in a clean, dry place protected from construction traffic in accordance
with the Installation, Operation, and Maintenance manual.
1.06 WARRANTY
A. Manufacturer shall provide a limited “parts only” warranty for a period of 24 months
from the date of original equipment shipment from the factory. Warranty shall cover
material and workmanship that prove defective,within the specified warranty period,
provided manufacturer’s written instructions for installation, operation and maintenance
have been followed. Warranty excludes parts associated with routine maintenance, such
as belts and air filters.
B. Startup Repair: Manufacturer shall provide startup repair for a period of 12 months from
the date of original equipment shipment from the factory. Program shall cover labor for
materials and workmanship that prove defective, within the specified warranty period,
Marion Technical College BHDP-MRN01.01 February 7, 2018
Cadaver Lab and HTC Renovation Addendum 2
Marion, Ohio
SINGLE ZONE ROOFTOP UNIT 23 75 00-3
provided manufacturer’s written instructions for installation, operation and maintenance
have been followed. Program excludes labor associated with routine maintenance, such
as belt and air filter replacement.
PART 2 – PRODUCTS
2.01 Manufacturer
A. Products shall be provided by the following manufacturers:
1. Basis of design: AAON
2. Approved substitute manufacturers: Engineered Air and Addison. Substitute
equipment shall meet all requirements specified herein, including but not limited to:
a. R-410A refrigerant
b. Variable capacity compressor with 10-100% capacity control
c. Direct drive supply fans
d. Double wall cabinet construction
e. Insulation with a minimum R-value of 13
f. Stainless steel drain pans
g. All other provisions of the specifications must be satisfactorily addressed
2.02 Rooftop Units
A. General Description
1. Packaged rooftop unit shall include compressors, evaporator coils, filters, supply
fans, dampers, air-cooled condenser coils, condenser fans, reheat coil, gas heaters,
exhaust fans and unit controls.
2. Unit shall be factory assembled and tested including leak testing of the DX coils,
pressure testing of the refrigeration circuit,and run testing of the completed unit. Run
test report shall be supplied with the unit in the service compartment’s literature
pocket.
3. Unit shall have decals and tags to indicate lifting and rigging, service areas and
caution areas for safety and to assist service personnel.
4. Unit components shall be labeled, including refrigeration system components and
electrical and controls components.
5. Estimated sound power levels (dB) shall be shown on the unit ratings sheet.
6. Installation, Operation, and Maintenance manual shall be supplied within the unit.
Marion Technical College BHDP-MRN01.01 February 7, 2018
Cadaver Lab and HTC Renovation Addendum 2
Marion, Ohio
SINGLE ZONE ROOFTOP UNIT 23 75 00-4
7. Laminated color-coded wiring diagram shall match factory installed wiring and shall
be affixed to the interior of the control compartment’s hinged access door.
8. Unit nameplate shall be provided in two locations on the unit, affixed to the exterior
of the unit and affixed to the interior of the control compartment’s hinged access
door.
B. Construction
1. All cabinet walls, access doors, and roof shall be fabricated of double wall, impact
resistant, rigid polyurethane foam panels.
2. Unit insulation shall have a minimum thermal resistance R-value of 13. Foam
insulation shall have a minimum density of 2 pounds/cubic foot and shall be tested in
accordance with ASTM D1929-11 for a minimum flash ignition temperature of
610°F.
3. Unit construction shall be double wall with G90 galvanized steel on both sides and a
thermal break. Double wall construction with a thermal break prevents moisture
accumulation on the insulation, provides a cleanable interior, prevents heat transfer
through the panel, and prevents exterior condensation on the panel.
4. Unit shall be designed to reduce air leakage and infiltration through the cabinet.
Cabinet leakage shall not exceed 1% of total airflow when tested at 3 times the
minimum external static pressure provided in AHRI Standard 340/360. Panel
deflection shall not exceed L/240 ratio at 125% of design static pressure, at a
maximum 8 inches of positive or negative static pressure, to reduce air leakage.
Deflection shall be measured at the midpoint of the panel height and width.
Continuous sealing shall be included between panels and between access doors and
openings to reduce air leakage. Piping and electrical conduit through cabinet panels
shall include sealing to reduce air leakage.
5. Roof of the air tunnel shall be sloped to provide complete drainage. Cabinet shall
have rain break overhangs above access doors.
6. Access to filters, dampers, cooling coils, heaters, exhaust fans, energy recovery
wheels, compressors, and electrical and controls components shall be through hinged
access doors with quarter turn, zinc cast, lockable handles. Full length stainless steel
piano hinges shall be included on the doors.
7. Exterior paint finish shall be capable of withstanding at least 2,500 hours, with no
visible corrosive effects, when tested in a salt spray and fog atmosphere in
accordance with ASTM B 117-95 test procedure.
8. Units with cooling coils shall include double sloped 304 stainless steel drain pans.
Marion Technical College BHDP-MRN01.01 February 7, 2018
Cadaver Lab and HTC Renovation Addendum 2
Marion, Ohio
SINGLE ZONE ROOFTOP UNIT 23 75 00-5
9. Unit shall be provided with base discharge and return air openings. All openings
through the base pan of the unit shall have upturned flanges of at least 1/2 inch in
height around the opening.
10. Unit shall include lifting lugs on the top of the unit.
11. Unit shall include factory installed, painted galvanized steel condenser coil guards
on the face of the condenser coil.
C. Electrical
1. Unit shall be provided with factory installed and factory wired, non-fused disconnect
switch.
2. Unit shall be provided with a factory installed and factory wired 115V, 12 amp GFI
outlet disconnect switch in the unit control panel.
3. Unit shall be provided with phase and brown out protection which shuts down all
motors in the unit if the electrical phases are more than 10% out of balance on
voltage, the voltage is more than 10% under design voltage or on phase reversal.
D. Supply Fans
1. Unit shall include direct drive, unhoused, backward curved, plenum supply fans.
2. Blowers and motors shall be dynamically balanced and mounted on rubber isolators.
3. Motors shall be premium efficiency inverter rated ODP with ball bearings rated for
200,000 hours service with external lubrication points.
4. Variable frequency drives shall be factory wired and mounted in the unit. Fan motors
shall be premium efficiency.
E. Cooling Coils
1. Coils shall be designed for use with R-410A refrigerant and constructed of copper
tubes with aluminum fins mechanically bonded to the tubes and galvanized steel end
casings. Fin design shall be sine wave rippled.
2. Coils shall be 6 row high capacity.
3. Coils shall be hydrogen or helium leak tested.
4. Coils shall be furnished with factory installed expansion valves.
Marion Technical College BHDP-MRN01.01 February 7, 2018
Cadaver Lab and HTC Renovation Addendum 2
Marion, Ohio
SINGLE ZONE ROOFTOP UNIT 23 75 00-6
F. Refrigeration System
1. Unit shall be factory charged with R-410A refrigerant.
2. Compressors shall be scroll type with thermal overload protection and carry a 5 year
non-prorated warranty, from the date of original equipment shipment from the
factory.
3. Compressors shall be mounted in an isolated service compartment which can be
accessed without affecting unit operation. Lockable hinged compressoraccess doors
shall be fabricated of double wall, rigid polyurethane foam injected panels to prevent
the transmission of noise outside the cabinet.
4. Compressors shall be isolated from the base pan with the compressor manufacturer’s
recommended rubber vibration isolators, to reduce any transmission of noise from
the compressors into the building area.
5. Each refrigeration circuit shall be equipped with expansion valve type refrigerant
flow control.
6. Each refrigeration circuit shall be equipped with automatic reset low pressure and
manual reset high pressure refrigerant safety controls, Schrader type service fittings
on both the high pressure and low pressure sides and a factory installed replaceable
core liquid line filter driers.
7. Unit shall include a variable capacity scroll compressor on the lead refrigeration
circuit which shall be capable of modulation from 10-100% of its capacity.
8. Unit shall include factory provided and installed compressor sound jackets on all
compressors.
9. Refrigeration circuit shall be provided with hot gas reheat coil, modulating valves,
electronic controller, supply air temperature sensor and a control signal terminal
which allowthe unit to have a dehumidification mode of operation, which includes
supply air temperature control to prevent supply air temperature swings and
overcooling of the space.
10. Refrigeration circuit shall be equipped with a liquid line sight glass.
G. Air-Cooled Condenser
1. Condenser fans shall be a vertical discharge, axial flow, direct drive fans.
2. Coils shall be designed for use with R-410A refrigerant. Coils shall be multi-pass
and fabricated from aluminum microchannel tubes.
Marion Technical College BHDP-MRN01.01 February 7, 2018
Cadaver Lab and HTC Renovation Addendum 2
Marion, Ohio
SINGLE ZONE ROOFTOP UNIT 23 75 00-7
3. Coils shall be designed for a minimum of 10°F of refrigerant sub-cooling.
4. Coils shall be hydrogen or helium leak tested.
5. Condenser fans shall be high efficiency electrically commutated motor driven with
factory installed head pressure control module. Condenser airflow shall continuously
modulate based on head pressure and cooling operation shall be allowed down to
35°F with adjustable compressor lockout.
H. Gas Heating
1. Stainless steel heat exchanger furnace shall carry a 25 year non-prorated warranty,
from the date of original equipment shipment from the factory.
2. Gas furnace shall consist of stainless steel heat exchangers with multiple concavities,
an induced draft blower and an electronic pressure switch to lockout the gas valve
until the combustion chamber is purged and combustion airflow is established.
3. Furnace shall include a gas ignition system consisting of an electronic igniter to a
pilot system, which will be continuous when the heater is operating, but will shut off
the pilot when heating is not required.
4. Unit shall include a single gas connection and have gas supply piping entrances in
the unit base for through-the-curb gas piping and in the outside cabinet wall for
across the roof gas piping.
5. High Turndown Modulating Natural Gas Furnace shall be equipped with modulating
gas valves, adjustable speed combustion blowers, stainless steel tubular heat
exchangers, and electronic controller. Combustion blowers and gas valves shall be
capable of modulation. Electronic controller includes a factory wired, field installed
supply air temperature sensor. Sensor shall be field installed in the supply air
ductwork. Supply air temperature set point shall be adjustable on the electronic
controller within the controls compartment. Gas heater shall be capable of capacity
turndown ratio as shown on the unit rating sheet. Heat trace shall be included on the
condensate drain.
I. Filters
1. Unit shall include 4 inch thick, pleated panel filters with an ASHRAE efficiency of
95% and MERV rating of 14, upstream of the cooling coil.
2. Unit shall include a clogged filter switch.
3. Units shall include a Magnehelic gauge mounted in the controls compartment.
J. Unit shall include 0-100% economizer consisting of a motor operated outside air damper
and return air damper assembly constructed of extruded aluminum, hollow core, airfoil
blades with rubber edge seals and aluminum end seals. Damper blades shall be gear
Marion Technical College BHDP-MRN01.01 February 7, 2018
Cadaver Lab and HTC Renovation Addendum 2
Marion, Ohio
SINGLE ZONE ROOFTOP UNIT 23 75 00-8
driven and designed to have no more than 20 cfm of leakage per sq ft. at 4 in. w.g. air
pressure differential across the damper. Low leakage dampers shall be Class 2 AMCA
certified, in accordance with AMCA Standard 511. Damper assembly shall be controlled
by spring return DDC actuator. Unit shall include outside air opening bird screen,
outside air hood, and barometric relief dampers.
K. Controls: The Temperature Control Subcontractor shall ship the DDC controllers for
each unit to the rooftop unit manufacturer. The rooftop unit manufacturer shall factory
mount and wire the controllers. Only communication control connections shall be made
in the field.
1. Isolation relays shall be factory installed.
2. Unit shall be provided with a safety shutdown terminal block for field installation of
a smoke detector which shuts off the unit's control circuit.
2.03 Curbs
A. Refer to the equipment schedule on the drawings for the roof curb style and height that is
required for each unit.
B. Curbs shall be fully gasketed between the curb top and unit bottom with the curb
providing full perimeter support, cross structure support and air seal for the unit. Curb
gasket shall be furnished within the control compartment of the rooftop unit to be
mounted on the curb immediately before mounting of the rooftop unit.
C. Knockdown curbs (with duct support rails) shall be factory furnished for field assembly.
D. Solid bottom curbs shall be factory assembled and fully lined with 1 inch neoprene
coated fiberglass insulation and include a wood nailer strip. Curb shall be adjustable up
to 3/4 inch per foot to allow for sloped roof applications.
PART 3 – EXECUTION
3.01 Power wiring external to the unit by the Electrical Contractor. Control wiring external to unit not
shown on Electrical Drawings to be by the HVAC Contractor.
3.02 Extend condensation drain piping from the drain pan of each unit to a splash block on roof or
grade provided by this Contractor.
3.03 Provide flexible connections for all ducts at units or plenum roof curbs.
3.04 Follow manufacturer’s instructions regarding proper assembly of the insulated curb.
END OF SECTION
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 1
SECTION 25 00 00 - BUILDING MANAGEMENT SYSTEM
PART 1 GENERAL
1.01 REFERENCES
A. Section 23 0105, Paragraph 1.04 - OHIO ENERGY CODE
B. Section 23 05 13 - ELECTRICAL WORK
C. Section 23 34 13 – LABORATORY EXHAUST FANS
C. Section 23 75 00 – SINGLE ZONE ROOFTOP UNIT
1.02 Related Documents
A. All work of this Division shall be coordinated and provided by the single Building
Management System (BMS) Contractor.
B. The work of this Division shall be scheduled, coordinated, and interfaced with the
associated work of other trades. Reference the Division 23 Sections for details.
C. The work of this Division shall be as required by the Specifications, Point Schedules and
Drawings.
D. If the BMS Contractor believes there are conflicts or missing information in the project
documents, the Contractor shall promptly request clarification and instruction from the
design team.
1.03 SCOPE
A. Furnish and install a complete Direct Digital Control (DDC) Temperature Control
System to automatically control the operation of the entire Heating, Ventilating, and Air
Conditioning System. Failure to mention any specific item or device does not relieve the
Contractor of the responsibility for installing such device or item in order to comply with
the intent of the Drawings or this Specification.
1. The BAS shall be a complete BACnet system designed for use on Intranets and
the Internet. Supervisory controllers shall be fully IT compatible devices that
mount and communicate directly on the Local Area Network (LAN). Contractor
shall be responsible for coordination with the owner’s IT staff to ensure that the
FMS will perform in the owner’s environment without disruption to any of the
other activities taking place on that LAN. All points of user interface shall be on
standard PCs that do not require the purchase of any special software from the
BAS manufacturer for use as a building operations terminal. The primary point
of interface on these PCs will be a standard Web Browser such as Internet
Explorer.
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 2
2. The temperature controls contractor shall supply a dedicated server for the
building automation system unless the supervisory building controller has an
integral server.
B. Building Automation System (BAS) installer shall provide:
1. A fully integrated Building Automation System (BAS) as manufactured by
Siemens, BACnet compliant from top to bottom, incorporating direct digital
control (DDC) for energy management, equipment monitoring and control.
2. Control system to be DDC as specified herein.
3. All wiring, conduit, panels, for all DDC temperature controls.
4. All final electrical connections to each stand-alone DDC Controller. Pick up
power immediately inside of panel.
5. BAS installer shall be responsible for all electrical work associated with the BAS
control system and as called for on the Drawings.
a) Perform all wiring in accordance with all local and national codes.
b) Install all line voltage wiring, concealed or exposed, in accordance with
Division 16.
c) Electrical Contractor shall provide 120 volt, 20 amp circuits and circuit
breakers from normal and/or emergency power panel for direct digital
control systems.
d) Surge transient protection shall be incorporated in design of system to
protect electrical components in all DDC Controllers.
e) All 120V and low voltage electrical control wiring throughout the
building whether exposed shall be run in conduit. in accordance with
Division 16. All low voltage electrical control wiring located above
ceiling can be run open in the plenum. Space above the ceiling is being
used as a return air plenum.
f) All 24V power shall be by the BAS installer and the HVAC Contractor.
g) Control wiring for unit heaters and ventilation fan thermostats.
C. HVAC Contractor provides:
1. All wells and openings for water monitoring devices, flow switches, and alarms
furnished by the BAS Contractor.
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 3
2. Installation of control devices, alarms, monitoring devices, and control valves.
3. All package unit control panels.
4. Installation of airflow monitoring devices, openings for flow switches, and
alarms furnished by the BAS Contractor.
5. Installation of smoke dampers; outdoor air, return air, exhaust air and vent
dampers; with adjacent access doors.
D. Electrical Contractor provides:
1. Power circuit to junction box within 5 feet of equipment for stand-alone control
panels indicated on the Drawings; installed and connected by BAS Contractor.
2. 120 volt, 20 amp breaker for each DDC Controller.
E. BAS Installer shall provide programming modifications necessary to fine tune sequences
during commissioning of systems at no additional cost to the Owner.
F. BAS Contractor to furnish to HVAC Contractor for installation:
1. Control valves.
2. Controllers for VAV Boxes to be factory mounted with mounting cost covered
by HVAC contractor.
3. Location of all wells and openings for water monitoring.
4. Automatic control dampers not provided with air handling equipment.
1.04 MANUFACTURERS:
A. Basis of Design: Siemens Building Technologies (Installed by the Columbus
Branch Office)
1.05 QUALITY ASSURANCE
A. Materials and equipment shall be the catalogued products of manufacturers regularly
engaged in production and installation of automatic temperature control systems and
shall be manufacturer's latest standard design that complies with the specification
requirements.
B. Install system using competent workmen who are fully trained in the installation of
temperature control equipment.
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 4
C. Single-source responsibility of the BAS supplier shall be to supply all Siemens
equipment, engineering, project management and coordination with the HVAC
contractor for the complete installation and proper operation of the BAS. Siemens shall
include as part of their scope of work, in coordination with the HVAC contractor,
debugging and proper calibration of each component in the entire system.
D. Supplier shall have an in-place support facility within 100 miles of the site with technical
staff, spare parts inventory and all necessary test and diagnostic equipment.
E. All electronic equipment shall conform to the requirements of FCC Regulation, Part 15,
Section 15, Governing Radio Frequency Electromagnetic Interference and be so labeled.
F. Design and build all system components to be fault-tolerant.
1. Satisfactory operation without damage at 110% and 85% of rated voltage and at
plus 3 Hertz variation in line frequency.
2. Static, transient and short-circuit protection on all inputs and outputs.
3. Protect communication lines against incorrect wiring, static transients and
induced magnetic interference.
4. Network-connected devices to be A.C. coupled or equivalent so that any single
device failure will not disrupt or halt network communication.
5. All real time clocks and data file RAM to be battery-backed for a minimum 72
hours and include local and system low battery indication.
6. All programs shall retain their memory for a minimum of 7 days upon loss of
power.
G. The BAS Installer shall have a competent Project Manager who is able to answer field
questions, is aware of all schedules and schedule changes, and is responsible for the BAS
Installer’s work and the coordination of their work with all other trades. This Project
Manager shall be available for on site and shall respond to design, programming, and
equipment related questions. Failure to provide the above services shall be considered a
substantial breech of Contract Documents.
1.06 SUBMITTALS
A. Submit ten (10) complete sets of documentation. Submit two (2) sets of drawings for
preliminary review before making a formal submittal.
1. Manufacturer's Product Data:
a. All equipment components
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 5
2. Shop Drawings:
a. System wiring diagrams with sequence of operation for each system as
specified.
b. Submit manufacturer's product information on all hardware items along
with descriptive literature for all software programs to show compliance
with specifications.
c. System configuration diagram showing all panel types and locations as
well as communications network and workstations.
d. Provide BACnet Protocol Implementation Conformance Statements
(PICS) for all controllers as per ANSI/ASHRAE Standard 135-2001.
B. Where installation procedures, or any part thereof, are required to be in accord with the
recommendations of the manufacturer of the material being installed, printed copies of
these recommendations shall be furnished to the Engineer prior to installation.
Installation of the item will not be allowed to proceed until the recommendations are
received.
1.07 JOB CONDITIONS
A. Coordinate the exact location of this work with the work of other trades prior to
fabrication or installation of same and verify all dimensions and elevations. Provide
additional offsets and sections of wiring, conduit, etc., as may be required to meet the
applicable job condition requirements. Coordinate with and review all related Drawings
of all trades prior to start of work.
B. Before any specified work is considered acceptable and approved for payment, a walk-
through with the controls manufacturer's agent and an authorized representative of the
Owner shall be scheduled with the A/E. Work not meeting the sequence of controls and
job specifications shall be subjected to rework at no charge to the University or A/E until
acceptable by the A/E. No job will be considered complete for payment until all
corrections are complete and "closeout information" has been submitted by the
Contractor.
C. All low-voltage (120 volt and less) control and interlock wiring shall be provided by the
BAS contractor. In addition, it is the responsibility of the BAS contractor to review the
scope of work and extent of HVAC system items that are presently included to be wired
by the Electrical Contractor within the electrical part of the Specification and Drawing
Documents.
D. Any additional safety, pressure, or other related devices and switches that are not
presently within the Electrical Contractor's scope of work shall be properly wired, per
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 6
required codes, etc., by the BAS contractor, and shall also include wiring of same to
electric and/or control panels along with providing any and all required temperature
control and interlock system monitoring, final connectors, etc. for a completely operable
system.
E. Wiring systems for the control, interlock, and supervisory systems are to be selected by
the controls subcontractor to match and be compatible with the equipment being
furnished and served. Wire, conduit, and fittings are to meet the National Electrical
Code and all applicable state and local codes. Run conduits straight and parallel with
building lines. Support conduit at least every four feet on centers. The entire installation
is to meet the requirements of the electrical codes and Division 16.
1.08 SYSTEM CHECK-OUT
A. Provide necessary personnel as required to assist the A/E in providing complete system
operational testing.
PART 2 PRODUCTS
2.01 CONTROL SYSTEM - GENERAL
A. Manufacturer Requirements
1. The system shall be provided by Siemens, Inc (Columbus Branch Office).
Systems provided by authorized distributors are not acceptable.
2. Control devices may not be of varied manufacturers whose products are capable
of meeting performance requirements. All control devices of the same type shall
be by the same manufacturer.
3. System Contractor is responsible for quality and satisfactory operation of
devices and for overall performance of system.
4. Supplier shall have an in-place support facility within 50 miles of the site with
technical staff, spare parts inventory, and all necessary testing and diagnostic
equipment.
B. Temperature Control System: Automatic electronic, microprocessor-based DDC system
with electric actuators to include computer hardware, software, wiring, conduit,
switches, relays, sensors, thermostats, control valves, dampers, and other control
components required to maintain conditions described in detail on the Drawings and
within this section, as well as other accessories.
1. Siemens shall provide any additional controls equipment and control wiring
required to meet intent of these specifications and make a complete system.
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 7
C. Where electronic sensing is used, furnish amplifier relays and transformer complete with
overload protection as required to maintain signal.
D. General Product Description
1. The building automation system (BAS) shall integrate multiple building
functions including equipment supervision and control, alarm management,
energy management, and historical data collection.
2. The building automation system shall consist of the following:
a. Stand-alone DDC Controllers
b. Web Based Supervisory DDC Controllers
3. The system shall be modular in nature and shall permit expansion of both
capacity and functionality through the addition of sensors, actuators, DDC
Controllers, Applications Specific Controllers, and operator devices.
4. DDC Controllers shall be able to access any data from, or send control
commands and alarm reports directly to, any other DDC Controller or
combination of controllers on the network without dependence upon a central
processing device. DDC Controllers shall also be able to send alarm reports to
multiple operator workstations without dependence upon a central processing
device.
2.02 NETWORKING COMMUNICATIONS
A. The design of the BAS shall network operator workstations and stand-alone DDC
Controllers. The network Architecture shall consist of two levels, a high-performance
peer-to-peer network, and DDC Controller-specific local area networks.
B. Access to system data shall not be restricted by the hardware configuration of the
building automation system. The hardware configuration of the BAS network shall be
totally transparent to the user when accessing data or developing control programs.
2.03 DDC CONTROLLER
A. Field Equipment Controller (FEC)
1. The Field Equipment Controller (FEC) shall be a fully user-programmable,
digital controller that communicates via BACnet MS/TP protocol.
2. The FEC shall employ a finite state control engine to eliminate unnecessary
conflicts between control functions at crossover points in their operational
sequences. Suppliers using non-state based DDC shall provide separate control
strategy diagrams for all controlled functions in their submittals.
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 8
3. Controllers shall be factory programmed with a continuous adaptive tuning
algorithm that senses changes in the physical environment and continually
adjusts loop tuning parameters appropriately. Controllers that require manual
tuning of loops or perform automatic tuning on command only shall not be
acceptable.
4. The FEC shall be assembled in a plenum-rated plastic housing with flammability
rated to UL94-5VB.
5. The FEC shall include a removable base to allow pre-wiring without the
controller.
6. The FEC shall include troubleshooting LED indicators to identify the following
conditions:
Power On
Power Off
Download or Startup in progress, not ready for normal operation
No Faults
Device Fault
Field Controller Bus - Normal Data Transmission
Field Controller Bus - No Data Transmission
Field Controller Bus - No Communication
Sensor-Actuator Bus - Normal Data Transmission
Sensor-Actuator Bus - No Data Transmission
Sensor-Actuator Bus - No Communication
7. The FEC shall accommodate the direct wiring of analog and binary I/O field
points.
8. The FEC shall support the following types of inputs and outputs:
a) Universal Inputs - shall be configured to monitor any of the following:
Analog Input, Voltage Mode
Analog Input, Current Mode
Analog Input, Resistive Mode
Binary Input, Dry Contact Maintained Mode
Binary Input, Pulse Counter Mode
b) Binary Inputs - shall be configured to monitor either of the following:
Dry Contact Maintained Mode
Pulse Counter Mode
c) Analog Outputs - shall be configured to output either of the following
Analog Output, Voltage Mode
Analog Output, current Mode
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 9
d) Binary Outputs - shall output the following:
24 VAC Triac
e) Configurable Outputs - shall be capable of the following:
Analog Output, Voltage Mode
Binary Output Mode
9. The FEC shall have the ability to reside on a Field Controller Bus (FC Bus).
a) The FC Bus shall be a Master-Slave/Token-Passing (MS/TP) Bus
supporting BACnet Standard protocol SSPC-135, Clause 9.
b) The FC Bus shall support communications between the FECs and the
NAE.
c) The FC Bus shall also support Input/Output Module (IOM)
communications with the FEC and with the NAE.
d) The FC Bus shall support a minimum of 100 IOMs and FEC in any
combination.
e) The FC Bus shall operate at a maximum distance of 15,000 Ft. between
the FEC and the furthest connected device.
10. The FEC shall have the ability to monitor and control a network of sensors and
actuators over a Sensor-Actuator Bus (SA Bus).
a) The SA Bus shall be a Master-Slave/Token-Passing (MS/TP) Bus
supporting BACnet Standard protocol SSPC-135, Clause 9.
b) The SA Bus shall support a minimum of 10 devices per trunk.
c) The SA Bus shall operate at a maximum distance of 1,200 Ft. between
the FEC and the furthest connected device.
11. The FEC shall have the capability to execute complex control sequences
involving direct wired I/O points as well as input and output devices
communicating over the FC Bus or the SA Bus.
12. The FEC shall support, but not be limited to, the following:
a) Hot water, chilled water/central plant applications
b) Built-up air handling units for special applications
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 10
c) Terminal units
d) Special programs as required for systems control
2.04 Field Devices
A. Input/Output Module (IOM)
1. The Input/Output Module (IOM) provides additional inputs and outputs for use
in the FEC.
2. The IOM shall communicate with the FEC over either the FC Bus or the SA Bus
using BACnet Standard protocol SSPC-135, Clause 9.
3. The IOM shall be assembled in a plenum-rated plastic housing with flammability
rated to UL94-5VB.
4. The IOM shall have a minimum of 4 points to a maximum of 17 points.
5. The IOM shall support the following types of inputs and outputs:
a) Universal Inputs - shall be configured to monitor any of the following:
Analog Input, Voltage Mode
Analog Input, Current Mode
Analog Input, Resistive Mode
Binary Input, Dry Contact Maintained Mode
Binary Input, Pulse Counter Mode
b) Binary Inputs - shall be configured to monitor either of the following:
Dry Contact Maintained Mode
Pulse Counter Mode
c) Analog Outputs - shall be configured to output either of the following
Analog Output, Voltage Mode
Analog Output, current Mode
d) Binary Outputs - shall output the following:
24 VAC Triac
e) Configurable Outputs - shall be capable of the following:
Analog Output, Voltage Mode
Binary Output Mode
6. The IOM shall include troubleshooting LED indicators to identify the following
conditions:
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 11
a) Power On
b) Power Off
c) Download or Startup in progress, not ready for normal operation
d) No Faults
e) Device Fault
f) Normal Data Transmission
g) No Data Transmission
h) No Communication
B. Networked Thermostat (TEC)
1. The Networked Thermostats shall be capable of controlling the following:
a) A four pipe fan coil system with multi-speed fan control.
b) A pressure dependant Variable Air Volume System or similar zoning
type system using reheat.
c) A two pipe fan coil with a single speed fan.
2. The Networked Thermostat shall communicate over the Field Controller Bus
using BACnet Standard protocol SSPC-135, Clause 9.
a) The Networked Thermostat shall support remote read/write and
parameter adjustment from the web based User Interfaceable through a
Network Automation Engine.
3. The Networked Thermostat shall include an intuitive User Interface providing
plain text messages.
a) Two line, 8 character backlit display
b) LED indicators for Fan, Heat, and Cool status
c) Five (5) User Interface Keys
Mode
Fan
Override
Degrees C/F
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 12
Up/Down
d) The display shall continuously scroll through the following parameters:
Room Temperature
System Mode
Schedule Status – Occupied/Unoccupied/Override
Applicable Alarms
4. The Networked Thermostats shall provide the flexibility to support the following
inputs:
a) Integral Indoor Air Temperature Sensor
b) Duct Mount Air Temperature Sensor
c) Remote Indoor Air Temperature Sensor with Occupancy Override and
LED Indicator.
d) Two configurable binary inputs
5. The Networked Thermostats shall provide the flexibility to support the following
outputs:
a) Three Speed Fan Control
b) On/Off Control
c) Floating Control
d) Proportional (0 to 10V) Control
6. The Networked Thermostat shall provide a minimum of six (6) levels of keypad
lockout.
7. The Networked Thermostat shall provide the flexibility to adjust the following
parameters:
a) Adjustable Temporary Occupancy from 0 to 24 hours
b) Adjustable heating/cooling deadband from 2º F to 5º F
c) Adjustable heating/cooling cycles per hour from 4 to 8
8. The Networked Thermostat shall employ nonvolatile electrically erasable
programmable read-only memory (EEPROM) for all adjustable parameters.
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 13
C. VAV Modular Assembly (VMA)
1. The VAV Modular Assembly shall provide both standalone and networked
direct digital control of pressure-independent, variable air volume terminal units.
It shall address both single and dual duct applications.
2. The VAV Modular Assembly shall communicate over the FC Bus using BACnet
Standard protocol SSPC-135, Clause 9.
3. The VAV Modular Assembly shall have internal electrical isolation for AC
power, DC inputs, and MS/TP communications. An externally mounted
isolation transformer shall not be acceptable.
4. The VAV Modular Assembly shall be a configurable digital controller with
integral differential pressure transducer and damper actuator. All components
shall be connected and mounted as a single assembly that can be removed as one
piece.
5. The VAV Modular Assembly shall be assembled in a plenum-rated plastic
housing with flammability rated to UL94-5VB.
6. The integral damper actuator shall be a fast response stepper motor capable of
stroking 90 degrees in 30 seconds for quick damper positioning to speed
commissioning and troubleshooting tasks.
7. The controller shall determine airflow by dynamic pressure measurement using
an integral dead-ended differential pressure transducer. The transducer shall be
maintenance-free and shall not require air filters.
8. Each controller shall have the ability to automatically calibrate the flow sensor to
eliminate pressure transducer offset error due to ambient temperature / humidity
effects.
9. The controller shall utilize a proportional plus integration (PI) algorithm for the
space temperature control loops.
10. Each controller shall continuously, adaptively tune the control algorithms to
improve control and controller reliability through reduced actuator duty cycle. In
addition, this tuning reduces commissioning costs, and eliminates the
maintenance costs of manually re-tuning loops to compensate for seasonal or
other load changes.
11. The controller shall provide the ability to download and upload VMA
configuration files, both locally and via the communications network.
Controllers shall be able to be loaded individually or as a group using a zone
schedule generated spreadsheet of controller parameters.
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 14
12. Control setpoint changes initiated over the network shall be written to VMA
non-volatile memory to prevent loss of setpoint changes and to provide
consistent operation in the event of communication failure.
13. The controller firmware shall be flash-upgradeable remotely via the
communications bus to minimize costs of feature enhancements.
14. The controller shall provide fail-soft operation if the airflow signal becomes
unreliable, by automatically reverting to a pressure-dependent control mode.
15. The controller shall interface with balancer tools that allow automatic
recalculation of box flow pickup gain (“K” factor), and the ability to directly
command the airflow control loop to the box minimum and maximum airflow
setpoints.
16. Controller performance shall be self-documenting via on-board diagnostics.
These diagnostics shall consist of control loop performance measurements
executing at each control loop’s sample interval, which may be used to
continuously monitor and document system performance. The VMA shall
calculate exponentially weighted moving averages (EWMA) for each of the
following. These metrics shall be available to the end user for efficient
management of the VAV terminals.
a) Absolute temperature loop error.
b) Signed temperature loop error.
c) Absolute airflow loop error.
d) Signed airflow loop error.
e) Average damper actuator duty cycle.
17. The controller shall detect system error conditions to assist in managing the
VAV zones. The error conditions shall consist of:
a) Unreliable space temperature sensor.
b) Unreliable differential pressure sensor.
c) Starved box.
d) Actuator stall
e) Insufficient cooling.
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 15
f) Insufficient heating.
The controller shall provide a flow test function to view damper position vs.
flow in a graphical format. The information would alert the user to check
damper position. The VMA would also provide a method to calculate actuator
duty cycle as an indicator of damper actuator runtime.
18. The controller shall provide a compliant interface for ASHRAE Standard 62-
1989 (indoor air quality), and shall be capable of resetting the box minimum
airflow Based on the percent of outdoor air in the primary air stream.
19. The controller shall comply with ASHRAE Standard 90.1 (energy efficiency) by
preventing simultaneous heating and cooling, and where the control strategy
requires reset of airflow while in reheat, by modulating the box reheat device
fully open prior to increasing the airflow in the heating sequence.
20. Inputs:
a) Analog inputs with user defined ranges shall monitor the following
analog signals, without the addition of equipment outside the terminal
controller cabinet:
0-10 VDC Sensors
1000ohm RTDs
NTC Thermistors
b) Binary inputs shall monitor dry contact closures. Input shall provide
filtering to eliminate false signals resulting from input “bouncing.”
c) For noise immunity, the inputs shall be internally isolated from power,
communications, and output circuits.
d) Provide side loop application for humidity control.
21. Outputs
a) Analog outputs shall provide the following control outputs:
0-10 VDC
b) Binary outputs shall provide a SPST Triac output rated for 500mA at 24
VAC.
c) For noise immunity, the outputs shall be internally isolated from power,
communications, and other output circuits.
22. Application Configuration
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 16
a) The VAV Modular Assembly shall be configured with a software tool
that provides a simple Question/Answer format for developing
applications and downloading.
23. Sensor Support
a) The VAV Modular Assembly shall communicate over the Sensor-
Actuator Bus (SA Bus) with a Network Sensor.
b) The VMA shall support an LCD display room sensor.
c) The VMA shall also support standard room sensors as defined by analog
input requirements.
d) The VMA shall support humidity sensors defined by the AI side loop.
D. Network Sensors (NS)
1. The Network Sensors (NS) shall have the ability to monitor the following
variables as required by the systems sequence of operations:
a) Zone Temperature
b) Zone humidity
c) Zone setpoint
2. The NS shall transmit the zone information back to the controller on the Sensor-
Actuator Bus (SA Bus) using BACnet Standard protocol SSPC-135, Clause 9.
3. The Network Sensors shall include the following items:
a) An LED to indicate the status of the Override feature.
b) A button to toggle the temperature display between Fahrenheit and
Celsius.
c) A turning knob to adjust temperature setpoint.
4. The NS shall be available with either screw terminals or phone jack.
5. The NS shall be available in either surface mount or wall mount styles.
E. Wireless Devices
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 17
1. Wireless Zone Sensors shall be available with: Warmer/Cooler Setpoint Adjustment,
No Setpoint Adjustement, and Setoint Adjustment Scale – 55 to 85 degrees. Type of
sensor shall be coordinated with the owner.
a. Sensors shall operate on standard, off the shelf, size AA or AAA alkaline
batteries.
b. Wireless sensors shall provide the capability to be addressed with up to four
unique addresses per controller.
c. Sensors shall have LED indication of diagnostic information for use in
commissioning and troubleshooting.
2. Coordinators, Routers and Repeaters
a. Wireless field bus routers, repeaters, and coordinators shall be used with
FEC, VMA and TEC controllers to provide a wireless interface to NAEs.
b. Coordinators, routers and repeaters shall have LED indication of diagnostic
information for use in commissioning and troubleshooting.
2.05 WORKSTATION OPERATOR INTERFACE
A. Basic Interface Description
1. Operator workstation interface software shall minimize operator training through
the use of English language prompting, English language point identification,
and industry standard PC application software. The software shall provide, as a
minimum, the following functionality:
a. Graphical viewing and control of environment
b. Scheduling and override of building operations
c. Collection and analysis of historical data
d. Definition and construction of dynamic color graphic displays
e. Editing, programming, storage, and downloading of controller databases
f. Alarm management, including paging and emailing of critical alarms as
requested by the owner.
B. Dynamic Color Graphic Displays
1. Color graphic floor plan displays and system schematics for each piece of
HVAC equipment, including air handling units, chilled water systems, and VAV
boxes, shall be provided by the BAS Contractor as indicated in the point I/O
summary of this specification to optimize system performance analysis and
speed alarm recognition.
2. The operator interface shall allow users to access the various system schematics
and floor plans via a graphical penetration scheme, menu selection, or text-based
commands.
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 18
3. Dynamic temperature values, humidity values, flow values, and status indication
shall be shown in their actual respective locations and shall automatically update
to represent current conditions without operator intervention.
2.06 INPUT DEVICES
A. Temperature Sensors
1. General Requirements:
a. The temperature sensor shall be of the resistance type, and shall be either
two-wire 1000 ohm nickel RTD, or two-wire 1000 ohm platinum RTD.
b. The following point types (and the accuracy of each) are required, and
their associated accuracy values include errors associated with the
sensor, lead wire, and A to D conversion:
Point Type Accuracy
Chilled Water + .5F.
Room Temp + .5F.
Duct Temperature + .5F.
All Others + .75F.
2. Room Temperature Sensors
a. Room sensors shall be constructed for either surface or wallbox-
mounting.
b. Room sensors shall have the following options when specified:
1) Setpoint reset slide switch providing a +3 degree (adjustable)
range.
2) Individual heating/cooling setpoint slide switches.
3) A momentary override request push button for activation of
after-hours operation.
4) Analog thermometer.
3. Thermowells
a. When thermowells are required, the sensor and well shall be supplied as
a complete assembly, including well head and Greenfield fitting.
b. Thermowells shall be pressure-rated and constructed in accordance with
the system working pressure.
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 19
c. Thermowells and sensors shall be mounted in a threadolet or 1/2” NPT
saddle and allow easy access to the sensor for repair or replacement.
d. Thermowells shall be constructed of 316 stainless steel.
4. Outside Air Sensors
a. Outside air sensors shall be designed to withstand the environmental
conditions to which they will be exposed. They shall also be provided
with a solar shield.
b. Sensors exposed to wind velocity pressures shall be shielded by a
perforated plate that surrounds the sensor element.
c. Temperature transmitters shall be of NEMA 3R construction and rated
for ambient temperatures.
5. Duct Mount Sensors
a. Duct mount sensors shall mount in an electrical box through a hole in
the duct, and be positioned so as to be easily accessible for repair or
replacement.
b. Duct sensors shall be insertion-type and shall be constructed as a
complete assembly, including lock nut and mounting plate.
c. For outdoor air duct applications, a weatherproof mounting box with
weatherproof cover and gasket shall be used.
6. Averaging Sensors
a. For ductwork greater in any dimension than 48 inches and/or where air
temperature stratification exists, an averaging sensor with multiple
sensing points shall be used.
b. For plenum applications, such as mixed air temperature measurements, a
string of sensors mounted across the plenum shall be used to account for
stratification and/or air turbulence. The averaging string shall have a
minimum of 4 sensing points per 12-foot-long segment.
c. Capillary supports at the sides of the duct shall be provided to support
the sensing string.
B. Humidity Sensors
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 20
1. The sensor shall be a solid-state-type, relative humidity sensor of the Bulk
Polymer Design. The sensor element shall resist service contamination.
2. The humidity transmitter shall be equipped with non-interactive span and zero
adjustments, a 2-wire isolated loop powered, 4-20 mA, 0-100% linear
proportional output.
3. Outside air relative humidity sensors shall be installed with a rainproof
perforated cover. The transmitter shall be installed in a NEMA 3R enclosure
with sealtite fittings and stainless steel bushings.
4. A single-point humidity calibrator shall be provided, if required, for field
calibration. Transmitters shall be shipped factory precalibrated.
5. Duct-type sensing probes shall be constructed of 304 stainless steel, and shall be
equipped with a neoprene grommet, bushings, and a mounting bracket.
C. Differential Pressure Transmitters
1. General Air and Water Pressure Transmitter Requirements:
a. Pressure transmitters shall be constructed to withstand 100% pressure
over-range without damage, and to hold calibrated accuracy when
subject to a momentary 40% over-range input.
b. Pressure transmitters shall transmit a 0 to 5 VDC, 0 to 10 VDC, or 4 to
20 mA output signal.
c. Differential pressure transmitters used for flow measurement shall be
sized to the flow-sensing device, and shall be supplied with Tee fittings
and shut-off valves in the high and low sensing pick-up lines to allow the
balancing Contractor and Owner permanent, easy-to-use connection.
d. A minimum of a NEMA 1 housing shall be provided for the transmitter.
Transmitters shall be located in accessible local control panels wherever
possible.
2. Low Differential Water Pressure Applications (0” - 20” w.c.)
a. The differential pressure transmitter shall be of industrial quality and
transmit a linear 4 to 20 mA output in response to variation of flow
meter differential pressure or water pressure-sensing points.
b. The differential pressure transmitter shall have non-interactive zero and
span adjustments that are adjustable from the outside cover and meet the
following performance specifications:
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 21
.01-20” w.c. input differential pressure range.
4-20 mA output.
Maintain accuracy up to 20 to 1 ratio turn-down.
Reference Accuracy: +0.2% of full span.
3. Medium to High Differential Water Pressure Applications (Over 21” w.c.)
a. The differential pressure transmitter shall meet the low-pressure
transmitter specifications with the following exceptions:
1) Differential pressure range 10” w.c. to 300 PSI.
2) Reference Accuracy: +1% of full span (includes non-linearity,
hysteresis, and repeatability).
b. Stand-alone pressure transmitters shall be mounted in a bypass valve
assembly panel. The panel shall be constructed to NEMA 1 standards.
The transmitter shall be installed in the panel with high and low
connections piped and valved. Air bleed units, bypass valves, and
compression fittings shall be provided.
4. Building Differential Air Pressure Applications (-1” to +1” w.c.)
a. The differential pressure transmitter shall be of industrial quality and
transmit a linear, 4 to 20 mA output in response to variation of
differential pressure or air pressure-sensing points.
b. The differential pressure transmitter shall have non-interactive zero and
span adjustments that are adjustable from the outside cover and meet the
following performance specifications:
1) -1.00 to +1.00 w.c. input differential pressure ranges.
2) 4-20 mA output.
3) Maintain accuracy up to 20 to 1 ratio turn-down.
4) Reference Accuracy: +0.2% of full span.
5. Low Differential Air Pressure Applications (0” to 5” w.c.)
a. The differential pressure transmitter shall be of industrial quality and
transmit a linear 4 to 20 mA output in response to variation of
differential pressure or air pressure-sensing points.
b. The differential pressure transmitter shall have non-interactive zero and
span adjustments that are adjustable from the outside cover and meet the
following performance specifications:
1) (0.00 - 1.00” to 5.00”) w.c. input differential pressure ranges.
2) 4-20 mA output.
3) Maintain accuracy up to 20 to 1 ratio turn-down.
4) Reference Accuracy: +0.2% of full span.
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 22
D. Smoke Detectors: Ionization-type air duct detectors shall be furnished as specified
elsewhere in Division 16 for installation under Division 15. All wiring for air duct
detectors shall be provided under Division 16, Fire Alarm System.
E. Status and Safety Switches
1. General Requirements
a. Switches shall be provided to monitor equipment status, safety
conditions, and generate alarms at the BAS when a failure or abnormal
condition occurs. Safety switches shall be provided with two sets of
contacts and shall be interlock-wired to shut down respective equipment.
2. Current Sensing Switches
a. The current sensing switch shall be self-powered with solid-state
circuitry and a dry contact output. It shall consist of a current
transformer, a solid-state current sensing circuit, adjustable trip point,
solid state switch, SPDT relay, and an LED indicating the on or off
status. A conductor of the load shall be passed through the window of
the device. It shall accept over-current up to twice its trip point range.
b. Current sensing switches shall be used for run status for fans, pumps,
and other miscellaneous motor loads.
c. Current sensing switches shall be calibrated to show a positive run status
only when the motor is operating under load. A motor running with a
broken belt or coupling shall indicate a negative run status.
d. Acceptable manufacturers: Veris Industries.
3. Air Filter Status Switches
a. Differential pressure switches used to monitor air filter status shall be of
the automatic reset type with SPDT contacts rated for 2 amps at
120VAC.
b. A complete installation kit shall be provided, including: static pressure
tops, tubing, fittings, and air filters.
c. Provide appropriate scale range and differential adjustment for intended
service.
4. Air Flow Switches
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 23
a. Differential pressure flow switches shall be bellows-actuated mercury
switches or snap acting micro-switches with appropriate scale range and
differential adjustment for intended service.
5. Air Pressure Safety Switches
a. Air pressure safety switches shall be of the manual reset type with SPDT
contacts rated for 2 amps at 120VAC.
b. Pressure range shall be adjustable with appropriate scale range and
differential adjustment for intended service.
6. Water Flow Switches
a. Basis of Design: Siemens.
7. Low Temperature Limit Switches
a. The low temperature limit switch shall be of the manual reset type with
Double-Pole/Single-Throw snap-acting contacts rated for 16 amps at 120
VAC.
b. The sensing element shall be a minimum of 15 feet in length and shall
react to the coldest 18-inch section. Element shall be mounted
horizontally across duct in accordance with manufacturer’s
recommended installation procedures.
c. For large duct areas where the sensing element does not provide full
coverage of the air stream, additional switches shall be provided as
required to provide full protection of the air stream.
2.07 OUTPUT DEVICES
A. Actuators
1. General Requirements
a. Damper and valve actuators shall be electronic and/or pneumatic, as
specified in the System Description section.
2. Electronic Damper Actuators
a. Electronic damper actuators shall be direct shaft-mount.
b. Modulating and two-position actuators shall be provided as required by
the sequence of operations. Damper sections shall be sized based on
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 24
actuator manufacturer’s recommendations for face velocity, differential
pressure, and damper type. The actuator mounting arrangement and
spring return feature shall permit normally open or normally closed
positions of the dampers, as required. All actuators (except terminal
units) shall be furnished with mechanical spring return unless otherwise
specified in the sequence of operations. All actuators shall have external
adjustable stops to limit the travel in either direction and a gear release
to allow manual positioning.
c. Modulating actuators shall accept 24 VAC or VDC power supply, shall
consume no more than 15 VA, and shall be UL-listed. The control signal
shall be 2-10 VDC or 4-20 mA, and the actuator shall provide a clamp
position feedback signal of 2-10 VDC. The feedback signal shall be
independent of the input signal and may be used to parallel other
actuators and provide true position indication. The feedback signal of
one damper actuator for each separately controlled damper shall be
wired back to a terminal strip in the control panel for trouble-shooting
purposes.
d. Two-position or open/closed actuators shall accept 24 or 120 VAC
power supply and be UL-listed. Isolation, smoke, exhaust fan, and other
dampers, as specified in the sequence of operations, shall be furnished
with adjustable end switches to indicate open/closed position, or be
hard-wired to start/stop associated fan. Two-position actuators, as
specified in sequence of operations as “quick-acting,” shall move full
stroke within 20 seconds. All smoke damper actuators shall be quick-
acting.
3. Electronic Valve Actuators
a. Electronic valve actuators shall be manufactured by the valve
manufacturer.
b. Each actuator shall have current limiting circuitry incorporated in its
design to prevent damage to the actuator.
c. Modulating and two-position actuators shall be provided as required by
the sequence of operations. Actuators shall provide the minimum torque
required for proper valve close-off against the system pressure for the
required application. The valve actuator shall be sized based on valve
manufacturer’s recommendations for flow and pressure differential. All
actuators shall fail in the last position unless specified with mechanical
spring return in the sequence of operations. The spring return feature
shall permit normally open or normally closed positions of the valves, as
required. All direct shaft-mount rotational actuators shall have external
adjustable stops to limit the travel in either direction.
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 25
d. Modulating Actuators shall accept 24 VAC or VDC and 120 VAC
power supply and shall be UL-listed. The control signal shall be 2-10
VDC or 4-20 mA, and the actuator shall provide a clamp position
feedback signal of 2-10 VDC. The feedback signal shall be independent
of the input signal and may be used to parallel other actuators and
provide true position indication. The feedback signal of each valve
actuator (except terminal valves) shall be wired back to a terminal strip
in the control panel for troubleshooting purposes.
e. Two-position or open/closed actuators shall accept 24 or 120 VAC
power supply and shall be UL-listed. Butterfly isolation and other
valves, as specified in the sequence of operations, shall be furnished
with adjustable end switches to indicate open/closed position or shall be
hard-wired to start/stop the associated pump or chiller.
B. Control Dampers
1. The BAS Contractor shall furnish all automatic dampers not specified with air
handling equipment. All automatic dampers shall be sized for the application by
the BAS Contractor or as specifically indicated on the Drawings.
2. All dampers used for throttling air flow shall be of the opposed-blade type
arranged for normally open or normally closed operation, as required. The
damper is to be sized so that, when wide open, the pressure drop is a sufficient
amount of its close-off pressure drop to shift the characteristic curve to near
linear.
3. All dampers used for two-position, open/close control shall be parallel-blade
type arranged for normally open or closed operation, as required.
4. Damper frames and blades shall be constructed of either galvanized steel or
aluminum. Maximum blade length in any section shall be 48”. Damper blades
shall be 16-gauge minimum and shall not exceed six (6) inches in width. Damper
frames shall be 16-gauge minimum hat channel-type with corner bracing.
Additional stiffening or bracing shall be provided for any section exceeding 48”
in height. All damper bearings shall be made of stainless steel or oil-impregnated
bronze. Dampers shall be tight-closing, low-leakage-type, with synthetic
elastomer seals on the blade edges and flexible stainless steel side seals.
Dampers of 48”x48” size shall not leak in excess of 8.5 cfm per square foot
when closed against 4” w.g. static pressure when tested in accordance with
AMCA Std. 500.
5. Air foil blade dampers of double-skin construction with linkage out of the air
stream shall be used whenever the damper face velocity exceeds 800 FPM or
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 26
system pressure exceeds 2.5” w.g., but no more than 4000 FPM or 6” w.g.
Acceptable manufacturers: Ruskin CD60.
6. One-piece rolled-blade dampers with exposed or concealed linkage may be used
with face velocities of 800 FPM or below.
7. Acceptable manufacturers: Ruskin CD50.
8. Multiple-section dampers may be jack-shafted to allow mounting of piston
pneumatic actuators and direct connect electronic actuators. Each end of the jack
shaft shall receive at least one actuator to reduce jack shaft twist.
C. Control Relays
1. Control Pilot Relays
a. Control pilot relays shall be of a modular plug-in design with retaining
springs or clips.
b. Mounting bases shall be snap-mount.
c. DPDT, 3PDT, or 4PDT relays shall be provided, as appropriate for
application.
d. Contacts shall be rated for 10 amps at 120 VAC.
e. Relays shall have an integral indicator light and check button.
f. Acceptable manufacturers: Siemens, Lectro.
D. Control Valves
1. All automatic control valves shall be fully proportioning and provide near linear
heat transfer control. The valves shall be quiet in operation and fail-safe open,
closed, or in their last position. All valves shall operate in sequence with another
valve when required by the sequence of operations. All control valves shall be
sized by the control manufacturer, and shall be guaranteed to meet the heating
and cooling loads, as specified. All control valves shall be suitable for the system
flow conditions and close against the differential pressures involved. Body
pressure rating and connection type (sweat, screwed, or flanged) shall conform
to the pipe schedule elsewhere in this specification.
2. Modulating plug water valves of the single-seat type with equal percentage flow
characteristics shall be used for all hot and chilled water applications, except
those described hereinafter. The valve discs shall be composition-type. Valve
stems shall be stainless steel.
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 27
3. Ball valves shall be acceptable for water terminal reheat coils, radiant panels,
unit heaters, package air conditioning units, and fan coil units.
4. Butterfly valves shall be acceptable for modulating large flow applications
greater than modulating plug valves, and for all two-position, open/close
applications. In-line and/or three-way butterfly valves shall be heavy-duty
pattern with a body rating comparable to the pipe rating, replaceable lining
suitable for temperature of system, and a stainless steel vane. Valves for
modulating service shall be sized and travel limited to 50 degrees of full open.
Valves for isolation service shall be the same as the pipe. Valves in the closed
position shall be bubble-tight.
E. Electronic Signal Isolation Transducers
1. A signal isolation transducer shall be provided whenever an analog output signal
from the building automation system is to be connected to an external control
system as an input (such as a chiller control panel), or is to receive as an input
signal from a remote system.
2. The signal isolation transducer shall provide ground plane isolation between
systems.
3. Signals shall provide optical isolation between systems.
4. Acceptable manufacturers: Advanced Control Technologies.
2.08 MISCELLANEOUS DEVICES
A. Local Control Panels
1. All control panels shall be factory-constructed, incorporating the BAS
manufacturer’s standard designs and layouts. All control panels shall be UL-
inspected and listed as an assembly and carry a UL 508 label listing compliance.
Control panels shall be fully enclosed, with sub-panel, hinged door, and key-
locking latch.
2. In general, the control panels shall consist of the DDC Controller(s), display
module, and I/O devices—such as relays, transducers, and so forth—that are not
required to be located external to the control panel due to function. The display
module shall be flush mounted in the panel face unless otherwise noted.
3. All I/O connections on the DDC Controller shall be extended to a numbered,
color-coded, and labeled terminal strip for ease of maintenance and expansion.
Wiring to I/O devices shall be made from this terminal strip.
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 28
4. All other wiring in the panel, internal and external, shall be made to additional
line or low voltage color-coded and labeled terminal strips. Low and line voltage
wiring shall be segregated. All terminal strips and wiring shall be UL-listed, 300-
volt service, and shall provide adequate clearance for field wiring.
5. All wiring for every control panel shall follow a common color-coded format.
All terminal strip color coding and numbering shall follow a common format. All
wiring shall be neatly installed in plastic trays or tie-wrapped.
6. A convenience 120 VAC duplex receptacle shall be provided in each enclosure,
fused on/off power switch, and required transformers.
B. Power Supplies
1. DC power supplies shall be sized for the connected device load. Total rated load
shall not exceed 75% of the rated capacity of the power supply.
2. Input: 120 VAC +10%, 60 Hz.
3. Output: 24 VDC.
4. Line Regulation: +0.05% for 10% line change.
5. Load Regulation: +0.05% for 50% load change.
6. Ripple and Noise: 1 mV rms, 5 mV peak-to-peak.
7. An appropriately sized fuse and fuse block shall be provided and located next to
the power supply.
8. A power disconnect switch shall be provided next to the power supply.
C. Thermostats: Electric room thermostats of the heavy-duty type shall be provided for unit
heaters, cabinet unit heaters, and ventilation fans, where required. All these items shall
be provided with concealed adjustment. Finish of covers for all room-type instruments
shall match and, unless otherwise indicated or specified, covers shall be manufacturer’s
standard finish.
PART 3 EXECUTION
3.01 WIRING AND CONDUIT
A. All control wiring incidental to the Building Automation System shall be by the Building
Automation Manufacturer except as follows:
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 29
1. Line voltage thermostats shall be turned over to the Electrical Contractor for
installation and wiring.
2. Wiring shown on the Electrical Contract Drawings shall be wired by the
Electrical Contractor.
B. All temperature control panels shall be completely prewired by the Temperature Control
Manufacturer to terminal strips within the control cabinet. Provide 20 amp toggle switch
to disconnect power at each panel. All internal interlock wiring within the control panel
shall be complete to the terminal strips.
C. All wiring, including low voltage, shall be installed in conduit. All wiring, conduit and
installation shall be in accordance with the latest edition of the National Electrical Code
and the requirements of Division 26 Electrical Specification, except low voltage wiring
may be of the type and size recommended by the Building Automation Manufacturer.
D. All conduit and conduit installation, including conduit utilized for plastic pneumatic
tubing, shall be in accordance with the requirements of Division 26, Electrical
Specification.
3.02 BUILDING AUTOMATION SYSTEM DIAGRAMS
A. Complete Building Automation System diagrams including motor control schematics,
wiring diagrams and a written description of the system operation shall be provided by
the Building Automation System Installer. Diagrams shall include face elevations of the
temperature control panels.
B. Prepare, as a part of Building Automation System shop drawings, complete terminal-to-
terminal wiring diagrams. These will show terminal designations on control items and
equipment. Wiring diagrams to be compatible with Electrical Drawings.
C. The Control diagrams, along with product literature on all system components shall be
submitted as "Shop Drawings" for review by the Associate prior to starting work.
Submit two sets of drawings for "preliminary" review before making a formal submittal.
D. Control diagrams, laminated in plastic or in full size heavy plastic binders with mounting
rings, shall be hung adjacent to each control panel showing all schematic diagrams and
descriptions related to the systems served by that panel.
E. Furnish four (4) complete sets of Operating and Maintenance Instructions for
Temperature Controls, including control diagrams, to the HVAC Contractor for inclusion
in the "Operating and Maintenance Manuals". Record control drawings must show set
points and spring ranges.
3.03 CALIBRATION
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 30
A. Inasmuch as controllers are factory calibrated and controlled devices have nominal
operating ranges, different from actual field conditions, all controllers shall be calibrated
and set for the actual field conditions. A listing of actual spring ranges on controlled
devices such as for valves, etc., shall be submitted to the University's Operating Engineer
in the Operating and Maintenance Manual, for future recalibration/maintenance.
3.04 SUPERVISION
A. All temperature controls shall be installed, and calibrated under the supervision of a
qualified representative of the Building Automation System Manufacturer. The Building
Automation System Manufacturer shall certify in writing the qualification of the
installing company.
3.05 ON-SITE TESTING
A. Provide Owner-approved operation and acceptance testing of the complete system. The
Owner will witness all tests.
B. Field Test: When installation of the system is complete, calibrate equipment and verify
transmission media operation before the system is placed on-line. All testing,
calibrating, adjusting and final field tests shall be completed by the installer. Provide a
detailed cross-check of each sensor within the system by making a comparison between
the reading at the sensor and a standard traceable to the National Bureau of Standards.
Provide a cross-check of each control point within the system by making a comparison
between the control command and the field-controlled device. Verify that all systems are
operable from local controls in the specified failure mode upon panel failure or loss of
power. Submit the results of functional and diagnostic tests and calibrations to the
Engineer for final system acceptance.
3.06 SERVICE AND GUARANTEE
A. General Requirements: Provide all services, materials and equipment necessary for the
successful operation of the entire BAS system for a period of one year after completion
of successful performance test. Provide necessary material required for the work.
Minimize impacts on facility operations when performing scheduled adjustments and
non-scheduled work.
B. Systems Modifications: Provide any recommendations for system modification in
writing to Owner. Do not make any system modifications, including operating
parameters and control settings, without prior approval of Owner. Any modifications
made to the system shall be incorporated into the operations and maintenance manuals,
and other documentation affected.
C. Software: Provide all software updates and verify operation in the system. These
updates shall be accomplished in a timely manner, fully coordinated with the system
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
BUILDING MANAGEMENT SYSTEM 25 00 00 - 31
operators, and shall be incorporated into the operations and maintenance manuals, and
software documentation.
3.07 TRAINING
A. The Contractor shall provide competent instructors to give full instruction to designated
personnel in the adjustment, operation and maintenance of the system installed rather
than a general training course. Instructors shall be thoroughly familiar with all aspects of
the subject matter they are to teach.
B. Johnson Controls shall provide 8 hours of training for University's operating personnel.
Training shall include:
1. Explanation of drawings, operations and maintenance manuals
2. DDC Controller operation/function
3. Operator control functions including graphic generation and field panel
programming
4. Explanation of adjustment, calibration and replacement procedures
END OF SECTION 25 00 00
Marion Technical College BHDP-MRN01.01 February 7, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
SEQUENCES OF OPERATION 25 90 00- 1
SECTION 25 90 00 - SEQUENCES OF OPERATION
PART 1 GENERAL
1.01 REFERENCES
A. Section 23 0105, Paragraph 1.04 - OHIO ENERGY CODE
B. Section 23 0513 - ELECTRICAL WORK
C. Section 23 3413 – LABORATORY EXHAUST FANS
1.02 System Description
A. The systems to be controlled under work of this section basically comprise (describe the
scope of the project). The systems being controlled are (describe the configuration of and
the type of systems included in the project).
B. This Section defines the manner and method by which controls function.
1.03 Sequences specified herein indicate the functional intent of the systems operation and may not
fully detail every aspect of the programming that may be required to obtain the indicated
operation. Contractor shall provide all programming necessary to obtain the sequences/system
operation indicated.
1.04 System Check-Out
A. Provide necessary personnel as required to assist the University and A/E in providing
complete system operational testing.
PART 2 PRODUCTS
Not Applicable
PART 3 EXECUTION
3.01 Sequences of Operation
A. Rooftop Unit Controls
1. Rooftop unit controls are provided as a factory installed package within the
rooftop unit, capable of executing the following sequence of operation. Unit
shall be packaged direct expansion cooling rooftop units with power exhaust as
shown on the Drawings and as specified in Section 23 75 00, “Single Zone
Rooftop Units.”
2. The unit manufacturer shall provide the control components. If required, a DDC
system interface shall be provided with the unit to permit communication with
the base building DDC system.
Marion Technical College BHDP-MRN01.01 February 7, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
SEQUENCES OF OPERATION 25 90 00- 2
4. Occupied Mode: The main supply fan operates continuously and provides the
required air flow.
a. Upon a unit failure during occupied hours, the auto-control damper
located at the Unit’s supply air discharge opening shall close to isolate
the unit from the common duct system.
5. The RTU DDC controller shall maintain cooling supply air temperature by
sequencing the compressors and/or compressor unloading valves of the RTU in
the mechanical cooling mode. The supply air set point shall be 52 to 60 degrees
(adjustable) during this mode. The supply air temperature set point shall initially
be based on the ambient outdoor temperature as follows:
Outside Air
Temperature
(°F)
Supply Air
Temperature
(°F)
0°F 65°F
55°F 55°F
Supply air temperature shall scale linearly between these two set points when
outdoor air temperatures are between 0°F and 55°F.
6. Unoccupied Mode: a DDC automatic temperature controller shall initiate the
unoccupied mode during which the RTU shall be shutdown. The DDC system
shall provide occupancy override capability.
7. Unit Status Report: For the rooftop unit, a remote interface to the Tracer System
shall provide an operating status summary of the following information to
provide the operator with critical rooftop operating data.
a. Unit type and size
b. Operating mode
c. Active rooftop diagnostics
d. Active cooling mode
e. Active cooling/supply air setpoint
f. Supply air temperature
g. Supply fan status
h. Supply fan percent modulation
i. Compressor on/off status
j. Condenser on/off status
k. Return air temperature
l. Return air relative humidity
m. Economizer status
n. Economizer position – percent
o. Not in Auto status.
Marion Technical College BHDP-MRN01.01 February 7, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
SEQUENCES OF OPERATION 25 90 00- 3
8. Diagnostics: The Remote Interface Panel system shall be able to alarm from all
sensed points from the rooftop units and diagnostics alarms sensed by the unit
controller. Alarm limits shall be designated for all sensed points. Individual
rooftop diagnostic and alarm status’ shall include the following latching items
for each rooftop unit:
a. Emergency stop
b. Supply fan failure
c. Exhaust fan failure
d. Compressor trip (each circuit)
e. Manual supply air static pressure limit
f. Compressor contactor fail (each circuit)
Individual rooftop diagnostic and alarm status’ shall include the following non-
latching item for each rooftop unit:
a. Zone temperature sensor failure
b. Supply air temperature sensor failure
c. Auxiliary temperature sensor failure
d. Outdoor air temperature sensor failure
e. Supply air pressure sensor failure
f. Outside air humidity sensor failure
g. Evaporator temperature sensor failure (each circuit)
h. Condenser temperature sensor failure (each circuit)
i. Supply air pressure setpoint failure
j. Space static pressure setpoint failure
k. Space pressure sensor failure
l. Return air temperature sensor failure
m. Return air humidity sensor failure
n. Auto supply air static pressure limit
o. Unit communications loss
p. Supply air temperature cool setpoint fail
q. Dirty filter
B. Laboratory Exhaust Fans:
1. The BAS shall provide start/stop control and status monitoring of the new
Laboratory exhaust fans. The new fan shall be controlled in an operating/standby
sequence. Each fan is provided with a variable frequency drive (VFD). A BAS
analog output shall be provided and wired to the VFD to control the fan speed.
The VFD alarm output shall also be monitored by the BAS.
4. The Air Balance contractor shall field measure the fan discharge velocities to
establish minimum fan speed and bypass damper position. All control points
shall be adjustable to permit fine tuning to minimize energy usage.
5. Current sensing relays shall provide input for proof of operation.
Marion Technical College BHDP-MRN01.01 February 7, 2018
Cadaver Lab and HTC Renovation Addendum no. 2
Marion, Ohio
SEQUENCES OF OPERATION 25 90 00- 4
C. Alarms
1. All “alarms” shall be both audible and visual at the central monitoring stations.
Visual alarms shall be shown on hard copy printouts and graphics. All audible
alarms shall be signaled through the central monitoring stations.
3.02 ON-SITE TESTING
A. Provide Owner-approved operation and acceptance testing of the complete system. The
Owner will witness all tests.
B. Field Test: When installation of the system is complete, calibrate equipment and verify
transmission media operation before the system is placed on-line. All testing,
calibrating, adjusting and final field tests shall be completed by the installer. Provide a
detailed cross-check of each sensor within the system by making a comparison between
the reading at the sensor and a standard traceable to the National Bureau of Standards.
Provide a cross-check of each control point within the system by making a comparison
between the control command and the field-controlled device. Verify that all systems are
operable from local controls in the specified failure mode upon panel failure or loss of
power. Submit the results of functional and diagnostic tests and calibrations to the
Engineer for final system acceptance.
END OF SECTION 25 90 00
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Contract Documents
Marion, Ohio
RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS 26 05 33 - 1
SECTION 26 05 33 - RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
PART 1 - GENERAL
1.01 SCOPE
A. Furnish and install all conduits, boxes, fittings, etc. for a complete raceway system.
Except where noted on drawings conduits shall not be permitted to be installed within
concrete slabs.
B. See Section 26 05 34, "Boxes and Plates".
C. The Electrical Contractor is responsible to furnish and install all conduits, boxes, fittings,
j-hooks, bridal rings, etc. required for the Electrical work (indicated on the “E”
drawings), and the; intercom, card reader, CCTV camera, voice, and/or data conduits –
as indicated in the contract documents.
1.02 CONDUIT SYSTEMS
A. Use electrical metallic tubing (“EMT”), intermediate metal conduit (“IMC”), rigid
metallic conduit (“RMC”), or PVC conduit, as specified below:
B. Electrical metallic tubing (“EMT”) may be used above ceilings, inside walls, where the
conduit is 2.0-inch, and smaller.
C. Intermediate metal conduit or rigid metal conduit is required under any of the following
conditions: Where conduit is either larger than 2.0-inch, or exposed and within 8 ft. of
finished floor.
D. Rigid polyvinyl chloride conduit may be used below the floor, or in the floor with a
minimum of 3-inches of concrete cover.
E. All conduit sizes stated in Specifications or marked on the Drawings are minimum size
and shall be no less than 0.75-inch, unless otherwise noted herein or on the drawings.
F. All conduit for data shall be no less than 1.0-inch.
PART 2 - PRODUCTS
2.01 CONDUIT – Intermediate Metal Conduit (IMC) or Rigid Metallic Conduit (RMC)
A. All wiring in building interior including feeders, branch circuits and auxiliary wiring
shall be run in Intermediate Metal Conduit (IMC) or Electrical Metallic Tubing (EMT).
All conduit 2.5-inch and above shall be Intermediate Metal Conduit (IMC) or Rigid
Metallic Conduit (RMC).
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Contract Documents
Marion, Ohio
RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS 26 05 33 - 2
B. All steel conduits shall be galvanized and have the manufacturer's name and U.L. label
attached to or stamped on each piece.
C. Each section of conduit shall be straight, free from blisters and other defects and in 10'-
0" lengths. Galvanizing shall be of such nature and so applied that it will not crack or
flake when conduit is bent.
2.02 CONDUIT - Electrical Metallic Tubing (EMT)
A. Branch circuits shall be installed in thin-wall (EMT) conduit. Minimum size shall be no
less than 0.75-inch, maximum size shall be no more than 2.0-inch.
B. All steel conduits shall be galvanized and have the manufacturer's name and U.L. label
attached to or stamped on each piece.
C. Each section of conduit shall be straight, free from blisters and other defects and in 10'-
0" lengths. Galvanizing shall be of such nature and so applied that it will not crack or
flake when conduit is bent.
D. EMT conduit is acceptable for all applications/sizes that are not exposed to moisture or
high potential for damage.
2.03 CONDUIT - Flexible Metallic (FMC & LFMC)
A. Flexible neoprene-clad galvanized steel conduit shall be used for "make-up" connections
to rotating machinery and heating elements.
B. Recessed ceiling lighting fixtures may be supplied with short lengths of flexible metallic
conduit with green ground wire.
C. New devices or equipment installed in existing walls may be served via concealed
flexible metallic conduit. Flexible conduit shall transition to conduit within 6 feet of
the entering/existing the wall.
B.D.
C. Minimum size shall be 0.75-inch trade size.
2.04 CONDUIT - Rigid Non-Metallic (RNC) or PVC
A. Non-metallic conduit and fittings for concrete encasement shall be rigid PVC, power and
communication type EB and UL Listed.
B. Non-metallic conduit and fittings for direct burial shall be rigid Schedule 40 PVC.
C. Non-metallic conduit and fittings specified or shown on the drawings for interior
applications shall be rigid Schedule 40 PVC.
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Contract Documents
Marion, Ohio
RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS 26 05 33 - 3
D. Non-metallic supports for grounding electrode conductor conduits shall be; “Burndy”,
“Nyloclip”, or “Clic”.
E. Minimum size shall be 1.0-inch in size.
2.05 CONDUIT FITTINGS - Metallic
A. All Intermediate Metal Conduit (IMC) conduits shall have threaded connections.
B. All Electrical Metallic Tubing (EMT) conduits shall compression Set Screw fittings.
C. Liquid-tight flexible metallic fittings shall be; “Midwest”, “Allied”, “American Fittings”
or an approved equal. Flexible metallic fittings shall be; “Steel City”, “AFC”, “Cable
Organizer”, Raco”, or an approved equal.
D. "Mineralac" type supports and "Unistrut" type one bolt supports with square ends shall
not be used at any location.
PART 3 - EXECUTION
3.01 CONDUIT APPLICATION
A. All conduit shall be run/routed to be concealed, behind walls, above ceilings, or under
floors. Notify the Architect right away where any conduit cannot be concealed, so any
installation issue, can be reviewed and resolved.
B. Concealed or exposed conduit 0.75-inch up to 1.75-inch, shall be EMT with set screw
fittings.
C. Concealed or exposed conduit 2.0-inch and above shall RMC or IMC.
D. All RMC, IMC, and EMT conduit terminations shall be bushed.
3.02 INSTALLATION
A. All intermediate (IMC) conduit entering cabinets, pull boxes, junction boxes or outlet
boxes shall be secured with double lock nuts and bushed ends.
B. No more than four (4) 90° bends will be allowed in any one conduit run. Where more
bends are necessary in any single run, a pull box shall be installed. Pull boxes shall also
be installed in long runs at a maximum separation of 100'-0". All conduits, except in
concrete slab or earth, shall be routed parallel or perpendicular to the lines of the
building. No out of plumb or diagonal conduit lines will be accepted.
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Contract Documents
Marion, Ohio
RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS 26 05 33 - 4
C. All conduits shall be supported within 3-feet of any box, or any turn of 90-degrees. All
conduits shall be substantially supported by threaded rods, suitable clamps or hangers
that are attached to the elements of the building structure to provide rigid installation. In
no case shall conduit be attached to or supported from adjoining pipe, or installed in such
a manner as to prevent the ready removal of other pipe for repairs.
D. Self-locking ties may be used to support conduits up to 1-inch in size which are running
horizontally on top of small structural members or through bar joist by; “Thomas and
Betts”, “New Tech”, “Panduit”, “Label Master”, or an approved equal.
E. Strap iron hangers and wire will not be approved as means of conduit support.
F. No conduit shall rest on or be supported from acoustical tile ceilings or the ceiling tile
suspension system.
G. RNC conduit in poured concrete or buried beneath concrete slabs shall have a 1-inch
minimum concrete cover.
H. Where conduit runs across building expansion joints or where necessary to compensate
for thermal expansion or contraction, expansion unions shall be provided.
I. Exercise necessary precautions to prevent accumulation of water, dirt or concrete in
conduits during execution of electrical work. Conduit in which water or foreign material
has been permitted to accumulate shall be thoroughly cleaned or replaced where such
accumulations cannot be removed.
J. All conduits must be kept dry and free of water or debris with approved pipe plugs or
caps. Care shall be given that plugs or caps are installed before pouring concrete.
K. Flexible conduit may only be used as follows:
1. Lighting fixtures may be supplied with short lengths not longer than 6'-0".
2. All expansion joints, flexible connections and vibration isolators shall be bridged
with short lengths not longer than 2'-0".
L. All connections to rotating machinery and heating elements shall be made with short
lengths, minimum 12", of liquid-tite conduit. Where motors are mounted on sliding
bases, the flexible connection shall be long enough to allow full travel of the motor on
the base, maximum 36".
M. Pull Wires
1. A pull wire shall be installed in all empty conduits. In dry locations, pull wire
shall be #14 gauge galvanized steel or nylon pull cord.
Marion Technical College BHDP-MRN01.01 January 15, 2018
Cadaver Lab and HTC Renovation Contract Documents
Marion, Ohio
RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS 26 05 33 - 5
2. Both ends of all pull wires shall be identified by means of labels or tags, reading
"PULL WIRE" and shall be numbered to refer to the same pull wire.
N. Seal all conduits entering from outside the building water and moisture tight.
O. Seal all conduits penetrating rated assemblies (wall or floor) with firestopping. Refer to
specification section 26 00 16, FIRESTOPPING.
P. Conduit sleeves thru the floor shall terminate at a minimum of 6-inches AFF, unless a
higher elevation is indicated in the documents.
Q. Any exposed conduit installed shall be painted to match the adjacent finished surface.
END OF SECTION
1. CONTRACTOR TO PROVIDE BLOCKING IN PARTITIONS FOR PARTITION MOUNTED ITEMS AS INDICATED. CONTRACTOR ALSO TO COORDINATE QUANTITY AND LOCATIONS WITH THE OWNER FOR OWNER FURNISHED / CONTRACTOR INSTALLED ITEMS.
2. PARTITIONS ARE EXISTING TO REMAIN UNLESS NOTED ON PLAN.
5
M N
9' -
7 1
/8"
5' - 1 3/4"
5' - 0"5' - 0" 3' - 0 3/4"
5' -
0"
3' -
0"
3' -
0"
PREP
112B
ENTRY
112A
CADAVER LAB
112
CORRIDOR
111
C-A600
1
C-A600
3
C-A6006
C-A6004
5
2
118
112A
118
112B
112
G10:S0--G3:S0--
G3:S0--
C-A600
15
101
102
103 103
13' - 0" 3' - 0"
104
TYP.105
TYP.105
F4:S0--
F4:S0--
F4:S0--
F4:S0--
CLEAR
2' - 6"
CLE
AR
1' -
6"
107
107
107
108
108
109
17
16' - 4 1/2" 7' - 0 5/8"
4
101
18
C-A600
13
C-A700
TYP
+/-
40
' - 0
" V
.I.F
.
EQ
EQ
EQ
EQ
TYP.
4' - 0"
4"
TY
P.
6' -
8"
TYP.105
TYP.110
111
4" TYP.
4"
TY
P.
TY
P.
4' -
0"
TYP.
4' - 0"
104C-A700 14
5
M N
114
112
111
118
008
006006006
002
005
005
014014
014
003
003
001001
CEILING HEIGHT TAG
2'-0" X 2'-0" CEILING GRID & ACOUSTICAL PANELS. REFER TO FINISH SCHEDULE.
RECESSED 2'-0" X 4'-0" LIGHT FIXTURE
RECESSED 2'-0" X 2'-0" LIGHT FIXTURE
MECHANICAL SUPPLY DIFFUSER
MECHANICAL RETURN DIFFUSER
CEILING MOUNTED PROJECTION SCREEN
1'-0"
ACCESS PANEL
GYPSUM BOARD
2'-0" X 4'-0" CEILING GRID & ACOUSTICAL PANELS. REFER TO FINISH SCHEDULE.
1. REFER TO PLUMBING, MECHANICAL AND ELECTRICAL DRAWINGS FOR LOCATIONS OF SPRINKLER HEADS, EXIT SIGNS AND ADDITIONAL CEILING MOUNTED DEVICES. NOTE: NOT ALL CEILING MOUNTED DEVICES ARE SHOWN ON THIS PLAN.
2. REFER TO PLUMBING, MECHANICAL, AND ELECTRICAL DRAWINGS FOR DEVICE & FIXTURE SIZES AND SPECIFFIC TYPES.
3. THESE DRAWINGS SHALL BE USED FOR LAYOUT OF ALL CEILING DEVICES. CONSULT WITH ARCHITECT IF A CONFLICT ARISES WITH PLUMBING, MECHANICAL, AND ELECTRICAL DRAWINGS. ALL FIXTURES ARE DIMENSIONED TO CENTERLINE OF FIXTURE.
4. PROVIDE ACCESS PANELS IN GYPSUM BOARD CEILINGS WHERE NECESSARY FOR ACCESS TO EQUIPMENT AND CONTROLS. REVIEW LOCATION WITH ARCHITECT PRIOR TO INSTALLATION.
5. ALL LAY-IN CEILING GRID SHALL BE EQUAL FROM OPPOSING EDGES OF ROOM UNLESS NOTED OTHERWISE. AVOID CUT SIZES SMALLER THAN 3 INCHES.
6. REFER TO ROOM FINISH SCHEDULE FOR ACOUSTICAL CEILING PANEL TYPE AND SOFFIT PAINT COLORS.
7. CENTER ALL SPRINKLER HEADS WITHIN CEILING TILES. COORDINATE WITH LIGHTING, DIFFUSERS, EXHAUST VENTS, PROJECTORS, AND ALL OTHER CEILING MOUNTED ITEMS. SEE MEP DRAWINGS.
8. ALL VERTICAL FACES OF SOFFIT TO BE FINISHED TO MATCH ADJACENT SURFACE MATERIALS. THE HORIZONTAL SURFACE TO BE PAINTED CEILING WHITE.
9. WHERE SPECIFIC ACCENT PAINT FINISHES ARE NOTED THE VERTICAL AND HORIZONTAL SURFACES OF THE SOFFIT ARE TO BE PAINTED THE SPECIFIED COLOR. REFER TO THE ROOM FINISH SCHEDULE AND SELECTIONS IN THE SPECIFICATIONS MANUAL.
10. IN ALL ROOMS WITH EXPOSED CEILINGS (EXCEPT MECHANICAL ROOMS AND JANITOR CLOSETS), PAINT ALL EXPOSED PIPES, DUCTS, VALVES, FITTINGS, CONDUITS, INSULATION, AND PIPING TO MATCH ADJACENT SURFACES.
11. PATCH AND REPAIR TO MATCH EXISTING CONDITIONS WHERE REQUIRED TO REMOVE EXISTING CEILING ELEMENTS.
12. PROVIDE NEW CEILING PANELS TO MATCH EXISTING WHERE LIGHT FIXTURES REMOVED.
REFER TO INDEX SHEET FOR ADDITIONAL NOTES.
1. SOLID LINES ON FLOOR PLANS REPRESENT BUILDING ELEMENTS TO REMAIN. DASHED LINES REPRESENT BUILDING ELEMENTS TO BE DEMOLISHED OR RELOCATED. ALL AREAS DENOTED ON THE ROOM FINISH SCHEDULE TO RECEIVE NEW FINISHES WILL REQUIRE THE DEMOLITION OF EXISTING FLOOR FINISHES AND CEILING SYSTEMS.
2. REMOVE ALL PLUMBING, MECHANICAL AND ELECTRICAL WORK CONTAINED IN OR ATTACHED TO WALLS WHICH ARE TO BE REMOVED. REFER TO PLUMBING, MECHANICAL, AND ELECTRICAL DRAWINGS FOR FURTHER DEMOLITION REQUIREMENTS.
3. CUTTING OF EXISTING BEAMS AND STRUCTURAL ELEMENTS IS PROHIBITED, UNLESS NOTED IN STRUCTURAL DRAWINGS.
4. PROVIDE FLOOR SUBSTRATE SURFACES SMOOTH AND FLUSH WITH EXISTING FLOOR SURFACES, FREE OF RIDGES, RIPPLES, DEPRESSIONS, AND OTHER DEFECTS. CHECK FLOOR SURFACES WITH A TEN FOOT LONG METAL STRAIGHTEDGE AND USING APPROPRIATE MATERIALS, FILL TROUGHS AND DEFLECTIONS OF FLOOR SURFACES, CLEAN AND PREPARE SUBFLOOR SURFACES TO RECEIVE NEW FINISH FLOORING MATERIALS AFTER REMOVAL OF EXISTING FLOORING MATERIALS. REMOVE EXISTING ADHESIVES AND SURFACE IRREGULARITIES WHICH WOULD TELEGRAPH THROUGH THE NEW FLOOR SURFACE. GRIND RIDGES AND RAISED AREAS. FILL DEPRESSIONS AND REPAIR CRACKS. SUBFLOOR SURFACES SHALL BE CLEAN, SMOOTH, LEVEL WITH NO APPARENT VARIATION AND SUITABLE TO RECEIVE NEW FINISH FLOOR MATERIALS.
5. REMOVE EXISTING RESILIENT TILE AND BASE, CARPET BASE, FINISH CARPENTRY, CERAMIC FLOOR AND WALL TILE, VINYL WALL FABRIC AND OTHER EXISTING FINISH MATERIALS FROM SURFACES RECEIVING NEW FINISHES, PREPARE SURFACES TO RECEIVE NEW FINISHES IN ACCORDANCE WITH ROOM FINISH SCHEDULE.
6. GENERAL CONTRACTOR SHALL BRACE ALL EXISTING STRUCTURAL ELEMENTS AS NECESSARY DURING DEMOLITION.
7. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN THE INTEGRITY OF FIRE RATED ASSEMBLIES AT ALL EDGES AND PENETRATIONS. EXISTING FIREPROOFING OR FIRE ASSEMBLIES WHICH ARE DAMAGED DURING DEMOLITION SHALL BE REPAIRED TO CONFORM TO FIRE PROTECTION REQUIREMENTS.
8. PATCH WALLS AT OWNER-REMOVED EQUIPMENT AND PREPARE FOR NEW FINISHES.
9. THE OWNER SHALL REMOVE ALL NON-FIXED SALVAGE ITEMS PRIOR TO DEMOLITION. CONTRACTOR SHALL COORDINATE WITH OWNER PRIOR TO DEMOLITION REGARDING FIXED ITEMS TO BE TURNED OVER TO THE OWNER AS SALVAGED ITEMS.
10. ACCESS FOR HVAC, PLUMBING AND ELECTRICAL WORK SHALL BE COORDINATED WITH OWNER'S REPRESENTATIVE IN ADVANCE OF PLANNING WORK AT AREAS ABOVE AND BELOW PLANNED WORK.
CODED NOTE
EXISTING TO REMAIN
EXISTING TO BE REMOVED
AREA NOT IN CONTRACT
?001
5
M N
009
009
007
5
M N
9' - 4"
AC1
9' - 4"
AC19' - 4"
AC1
5
M N
PREP
112B ENTRY
112A
CADAVER LAB
112
CORRIDOR
111
118
TRAVEL DISTANCE = 111' FEET
USE GROUP: BUSINESS (UNCHANGED)
OCCUPANCY COUNT: 1,208 SF / 50 = 25 OCCUPANTS (REDUCED FROM ORIGINAL)
USE GROUP: BUSINESS
(UNCHANGED)
OCCUPANCY COUNT: 154 SF / 50 = 4 OCCUPANTS
(REDUCED FROM ORIGINAL)
USE GROUP: BUSINESS (UNCHANGED)
OCCUPANCY COUNT: 67 SF / 300 = 1 OCCUPANTS (REDUCED FROM ORIGINAL)
FINISH TAG
ROOM FINISHES TAGWall
Floor
Ceiling
Base
P1
FINISH & MATERIAL ABBREVIATIONS
* = INDICATES MORE THAN ONE FINISH. REFER TO GENERAL FINISH NOTES
- = NO FINISHAC = ACOUSTICAL CEILING TILEB = WALL BASEC = CARPETCN = CONCRETECT = CERMAIC/PORCELAIN TILEETR = EXISTING TO REMAINGB = GYPSUM WALLBOARD - PAINTEDGL = GLAZINGL = PLASTIC LAMINATENC = NO CEILING, PAINT EXPOSED
STRUCTURE P = PAINTRF = RESILIENT FLOORING (VCT, LINOLEUM,
CORK, RUBBER)SP = REFER TO SPECIFICATIONS FOR FINISHSS = SOLID SURFACETB = TACKBOARDTP = TOILET PARTITIONSWD = WOODWT = WINDOW TREATMENTS
A. CONTRACTOR TO PROVIDE ALL LEVELING MATERIAL AS REQUIRED TO ENSURE AN ADEQUATE LEVEL SUBSTRATE FOR FINISH MATERIAL INSTALLATION.
B. AT DOOR OPENINGS THE TRANSITION BETWEEN DISSIMILAR MATERIALS IS TO OCCUR DIRECTLY AT THE CENTERLINE OF THE DOOR IN THE CLOSED POSITION.
C. AT CASED OPENINGS THE TRANSITION BETWEEN DISSIMILAR MATERIALS IS TO OCCUR DIRECTLY AT THE CENTERLINE OF THE OPENING.
D. COLOR CHANGES ON WALLS ARE TO OCCUR AT INSIDE AND OUTSIDE CORNERS. ALL DEISCREPANCIES ARE TO BE REVIEWED WITH THE ARCHITECT.
E. CONTRACTOR TO PROVIDE ALL NECESSARY TRANSITION STRIPS BETWEEN DISSIMILAR MATERIALS. TRANSITION STRIP MATERIALS ARE TO BE SUBMITTED FOR APPROVAL.
F. REFER TO REFLECTED CEILING PLANS FOR CEILING TYPES AND FINISHES.G. ALL GYPSUM BOARD WALLS TO BE PAINTED P1 UNLESS NOTED OTHERWISE.
REVIEW ALL DISCREPANCIES WITH THE ARCHITECT.
P*
EF1
AC1
EF1
P1
EF1
AC1
EF1
P*
EF1
AC2
EF1
P5
P3
P3
7' -
6"
101
RF3
FINISH LEGEND
PAINT (P)
P1
FIELD
MFG:
COLOR:
SHERWIN WILLIAMS
ORIGAMI WHITE SW7636
P2
DOOR
FRAMES
MFG:
COLOR:
SHERWIN WILLIAMS
ACIER SW9170
P3
ACCENT
MFG:
COLOR:
SHERWIN WILLIAMS
WOOD VIOLET SW6557
P4
ACCENT
MFG:
COLOR:
SHERWIN WILLIAMS
FOREVER LILAC SW9067
P5 MFG:
COLOR:
SHERWIN WILLIAMS
TO MATCH EXISTING
EF1 FLECKS:
SW6557 WOOD VIOLET
SW9067 FOREVER LILAC
SW7004 SNOWBOUND
SW7066 GRAY MATTERS
PROVIDE 4" HIGH INTEGRAL BASE
EPOXY FLOORING (EF)
COLOR:
NOTE:
AC1 MFG:
STYLE:
SIZE:
COLOR:
GRID:
ACOUSTIC CEILING TILE (AC)
AC2 MFG:
STYLE:
SIZE:
COLOR:
GRID:
ARMSTRONG
OPTIMA SQUARE LAY IN, FINE TEXTURE
24" X 24"
WHTIE
SUPRAFINE 15/16" SUSPENSION SYSTEM
L1 MFG:
COLOR:
PLASTIC LAMINATE (L)
WILSONART
FIELD ELM 7999K-12 SOFT GRAIN FINISH
WC1 WALL TALKERS
JUST RITE
48" WIDE (WOVEN BACK)
WHITE
J-CAP @ TOP
WALL COVERING (WC)
MFG:
PRODUCT:
SIZE:
COLOR:
HARDWARE:
ARMSTRONG
CERAMAGUARD, UNPERFORATED, SQUARE LAY IN
24" X 24"
WHITE
15/16" PRELUDE
WF1 SOLYX
SXWF-WM
60" WIDE
WHITE MATTE
WINDOW FILM (WF)
MFG:
PRODUCT:
SIZE:
FINISH:
RF3AZROCK
VCT
TBD (SELECT FROM MFR. FULL COLOR RANGE)
12" X 12"
1/8" GAUGE
RESILIENT FLOORING (RF)
MFG:
STYLE:
COLOR:
SIZE:
THICKNESS:
2017 OHIO BUILDING CODE (OBC)
PH
ON
E
919.6
83.1
084
150 F
AYETTEV
ILLE S
TREET
RA
LEIG
H,
NC
27601
SU
ITE 8
20
RALEIG
H
PH
ON
E
614.4
86.1
960
274 M
ARC
ON
I BLV
D
CO
LU
MBU
S,
OH
43215
SU
ITE 2
00
CO
LU
MBU
S
PH
ON
E
513.2
71.1
634
302 W
EST 3
RD S
TREET
CIN
CIN
NA
TI,
OH
45202
SU
ITE 5
00
CIN
CIN
NATI
websi
te
ww
w.b
hdp.c
om
This
do
cu
men
t is
the
pro
du
ct a
nd
pro
pe
rty o
f B
axte
r H
od
ell
Don
ne
lly P
resto
n,
Inc.
N
eith
er
the
docum
ent
no
r th
e info
rma
tio
n it
co
nta
ins m
ay b
e c
opie
d o
r used
for
oth
er
than
th
e s
pecific
pro
ject
for
whic
h it w
as p
rep
are
d w
itho
ut
the w
ritte
n c
onsen
t o
f B
axte
r H
ode
ll D
onn
elly
Pre
sto
n, In
c.
1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 17
B
A
9
1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 179
Drawn
Project Manager
Checked
Contract Drawing Date
Project Number
Q
P
N
M
L
K
J
H
G
F
E
D
C
B
A
18 19
18 19
Q
P
N
M
L
K
J
H
G
F
E
D
C
B
PAUL D. ORBAN, LICENSE #13276EXPIRATION DATE: 12/31/2018
C:\Users\bhosfeld\Documents\Cadaver Lab_ARCH_17_MRN0101_Central_bhosfeld@bhdp.com.rvt 2/7/2018 9:38:58 AM
B.HOSFELD
P. ORBAN
L. BROCKWAY
01/15/18
MRN01.01
C-A101
FIR
ST
FLO
OR
PLA
N, D
EM
O P
LA
N, R
CP
'S, A
ND
LIF
E S
AF
ET
Y P
LA
N
CA
DA
VE
R L
AB
AN
D H
TC
RE
NO
VA
TIO
NS
MA
RI O
N T
EC
HN
I CA
L C
OLLE
GE
PR
AT
ER
EN
GIN
EE
RIN
G A
SS
OC
IAT
ES
GENERAL ARCHITECTURAL NOTES
CODED NOTES
001 REMOVE EXISTING PARTITION AS INDICATED. COORDINATE DEVICEREMOVAL WITH MEP.
002 REMOVE EXISTING DOOR, FRAME, AND HARDWARE IN ITSENTIRETY.
003 REMOVE EXISTING VCT FLOORING AND EXISTING BASE IN IT'SENTIRETY, INCLUDING ADHESIVES. PREPARE FLOOR FOR NEWFINISHES.
005 PORTION OF WALL TO BE REMOVED. REFER TO NEW WORK PLANFOR EXTENT.
006 REMOVE PLUMBING FIXTURE AND CASEWORK. CAP EXISTINGPLUMBING LINES AND LEAVE IN PLACE. REFER TO PLUMBINGDRAWINGS.
007 REMOVE EXISTING OPERABLE PARTITION TRACK IN ITS ENTIRETY,INCLUDING ALL SUPPORTS, STRUCTURE, AND HARDWARE.
008 REMOVE EXISTING OPERABLE PARTITION IN IT'S ENTIRETY,INCLUDING ALL SUPPORTS, HARDWARE, AND FRAMING. PATCH ANDREPAIR AS NECESSARY. ENSURE SURFACE IS READY FOR NEWFINISH.
009 REMOVE EXISTING ACT CEILING SYSTEM IN ITS ENTIRETY BACK TOSTRUCTURAL DECK ABOVE; INCLUDING BUT NOT LIMITED TOCEILING SYSTEM, HANGERS, LIGHTS AND ALL MEP ITEMS, REFER TOMEP DRAWINGS.
014 REMOVE EXISTING MILLWORK BASE CABINETS, WALL CABINETS,COUNTERTOP AND SINK. REFER TO PLUMBING DRAWINGS.
101 ALIGN
102 PATCH FLOORING TO MATCH EXISTING EXACTLY. TOOTH INTOEXISTING FLOORING. PROVIDE SAMPLE TO ARCHITECT FORAPPROVAL.
103 UNIVERSITY TO PROVIDE NEW 80" WALL MOUNTED MONITOR.CONTRACTOR TO PROVIDE AND INSTALL COMPATIBLE WALLMOUNT. COORDINATE WITH UNIVERSITY. PROVIDE ALLNECESSARY BLOCKING AND SUPPORT. PROVIDE NECESSARYPOWER. REFER TO ELECTRICAL DRAWINGS.
104 CONTRACTOR TO PROVIDE NEW CONCRETE PAD FOR MECHANICALEQUIPMENT. REFER TO MEP DRAWINGS. REFER TO TYPICALEXTERIOR MECHANICAL EQUIPMENT PAD DETAIL.
105 POWDER-COATED MECHANICAL EQUIPMENT SCREEN WALLPROVIDED AND INSTALLED BY CONTRACTOR. BASIS OF DESIGN ISOHIO GRATINGS INC. PW PRODUCT. CONTRACTOR TO PROVIDENECESSARY ATTACHMENT HARDWARE. SCREEN WALL TO BE 7'-0"HIGH. REFER TO SPEC. FOR FINISH. REFER TO TYPICAL EXTERIORMECHANICAL EQUIPMENT PAD DETAIL. COORDINATE WITHUNIVERSITY BEFORE ORDERING. PROVIDE POWDER-COATINGFINISH.
107 UNIVERSITY TO PROVIDE AND INSTALL STAND-ALONE CARDREADER.
108 CUT FLOOR FOR NEW FLOOR DRAIN. PATCH AND REPAIRSURROUNDING FLOOR. PREPARE FLOOR FOR NEW FINISH. REFERTO PLUMBING DRAWINGS FOR EXACT SIZE AND LOCATION.
109 CUT FLOOR FOR NEW FLOOR BOX OUTLET. PATCH AND REPAIRSURROUNDING FLOOR. PREPARE FLOOR FOR NEW FINISH. REFERTO ELECTRICAL DRAWINGS FOR EXACT SIZE AND LOCATION.
110 CONTRACTOR TO PROVIDE STEEL-POST TO SUPPORT MECHANICALSCREEN WALL PANELS. COORDINATE POST SPACING WITH SCREENWALL MANUFACTURER. POWDER-COAT TO MATCH THAT OFSCREEN WALL PANELS. REFER TO TYPICAL EXTERIOR MECHANICALEQUIPMENT PAD DETAIL.
111 METAL FABRICATED SCREEN WALL DOOR. CONTRACTOR TOPROVIDE ALL NECESARRY METAL TUBING. METAL SCREEN WALLPANEL IN NOTE 105 TO BE PROVIDED IN DOORS. PROVIDE ALLNECESSARY MOUNTING HARDWARE. COORDINATE DESIGN WITHARCHITECT BEFORE ORDERING. PROVIDE POWDER-COAT FINISH.
N
1/4" = 1'-0"C-A101
01 FIRST FLOOR PLAN AND FURNITURE PLANN
1/8" = 1'-0"C-A101
02 FIRST FLOOR DEMOLITION PLAN
REFLECTED CEILING PLAN LEGENDGENERAL RCP NOTES
GENERAL DEMOLITION NOTES
DEMOLITION PLAN LEGEND
N
1/8" = 1'-0"C-A101
04 FIRST FLOOR DEMOLITION RCP
N
1/8" = 1'-0"C-A101
3 FIRST FLOOR RCP
N
1/8" = 1'-0"C-A101
5 FIRST FLOOR LIFE SAFETY PLAN
FINISH LEGEND
GENERAL FINISH PLAN NOTES
N
1/8" = 1'-0"C-A101
6 FIRST FLOOR FINISH PLAN
No.
Issue
/Revis
ion
/Subm
issio
nD
ate
3C
ON
TR
AC
T D
OC
UM
EN
TS
01
/15/1
8
4A
DD
EN
DU
M 2
02
/08/1
8
4
4
1. CONTRACTOR TO PROVIDE BLOCKING IN PARTITIONS FOR PARTITION MOUNTED ITEMS AS INDICATED. CONTRACTOR ALSO TO COORDINATE QUANTITY AND LOCATIONS WITH THE OWNER FOR OWNER FURNISHED / CONTRACTOR INSTALLED ITEMS.
2. PARTITIONS ARE EXISTING TO REMAIN UNLESS NOTED ON PLAN.
1 2 3-X
F = FRAME WIDTH1 1/2" AT ALUMINUM FRAMES2" AT HOLLOW METAL FRAMES2" AT STOREFRONT FRAMES
F WIDTH F
FH
EIG
HT
HE
IGH
T4"
FWIDTHF
4"H
EIG
HT
F WIDTH F X F
4"
F FG
HE
IGH
T
WIDTH WIDTH
HE
IGH
T
6"1'
- 0
"
6"6"
AL = ALUMINUMEX = EXISTINGF = FLUSHFG = FULL GLASSFIN = FINISHHG = HALF GLASSHM = HOLLOW METALMATL = MATERIALNL = NARROW LITE
OH = OVERHEAD COILING DOORPF = PRE-FINISHEDPL = PLASTIC LAMINATEPT = PAINTST = STAINED (FIN)ST = STEEL (MATL)VG = VISION GLASSWD = WOOD
1. ALL HARDWARE TO BE PROVIDED BY DOOR MANUFACTURER. COORDINATE HARDWARE SETS WITH OWNER.
2. ALL NEW DOORS AND DOOR FRAMES TO MATCH FINISH OF EXISTING DOORS EXACTLY. OWNER TO SELECT FROM MANUFACTURER'S FULL RANGE OF FINISHES.
3. STANDALONE CARDREADERS TO BE PROVIDED AND INSTALLED BY UNIVERSITY.
HOLLOW METAL FRAME
DOOR - SEE SCHEDULE
SEE PLANS FOR PARTITION TYPE
METAL STUD HEADER
SEALANT AT BOTH SIDES
ACOUSTICAL INSULATION
2"
WALL LINE, 4"
SEE PLAN FOR PARTITION TYPES
SEALANT AT BOTH SIDES
HOLLOW METAL FRAME
DOOR - SEE SCHEDULE
DOUBLE STUD AT JAMB
ACOUSTICAL INSULATION
4" MIN. 2"
WOOD BLOCKING
MATCH WALL DEPTH UP TO 8", HOLD HINGE SIDE OF FRAME FLUSH WITH CMU
2"
SEALANT AT BOTH SIDES
MASONRY JAMB ANCHOR
HOLLOW METAL FRAME
METAL STOP
GROUT AS REQUIRED FOR FIRE RATING
GLAZING - SEE SCHEDULE
MATCH WALL DEPTH UP TO 8", HOLD HINGE SIDE OF FRAME FLUSH WITH CMU
2"
SEALANT AT BOTH SIDES
MASONRY JAMB ANCHOR
HOLLOW METAL FRAME
DOOR - SEE SCHEDULE
GROUT AS REQUIRED FOR FIRE RATING
7 3/
4"
REFER TO FLOOR PLAN FOR PARTITION TYPE
MATCH WALL DEPTH UP TO 8", HOLD GLAZED SIDE OF FRAME FLUSH WITH CMU
CONCRETE MASONRY UNIT
LINTEL, REFER TO STRUCTURAL
SEALANT AT BOTH SIDES
HOLLOW METAL FRAME
DOOR - SEE SCHEDULE
GROUT AS REQUIRED FOR FIRE RATING
4"
7 3/4"
GLAZING - SEE SCHEDULE
METAL STOP
HOLLOW METAL FRAME
CONTINUOUS SEALANT AND BACKER ROD AT BOTH SIDES
4"
ACOUSTICAL INSULATION
LEVEL FLOOR AS NECESSARY
GLAZING - SEE SCHEDULE
METAL STOP
HOLLOW METAL FRAME
DOOR - SEE SCHEDULE
2"
ACOUSTICAL INSULATION
GYPSUM PARTITIONS
3 5/8"8"
G10:C---
G10:A---
G10:S---
F4:C---
F4:A---
F4:S---
( 1 HR. RATED - U.L. DESIGN U465 )
GYPSUM PARTITION = ONE LAYER OF 5/8" GWB, BOTH SIDESVENEER PLASTER PARTITION = ONE LAYER OF 5/8" VPB BOTH SIDES
9 1/4" 4 1/4"
ONE LAYER OF 5/8" GWB, ONE SIDE
3 5/8"
G3:C---
G3:A---
G3:S---
4 7/8"
FURRED GYPSUM PARTITIONS
STC = 39 (43)
4" T
YP
.
PARTITION HEIGHT:C = TO CEILINGA = ABOVE CEILINGS = TO STRUCTUREP = PARTIAL HEIGHT
FIRE RATING: 0, .5, 1, 2, 3 OR 4 HOUR
ANCILLARY DESIGNATION: - = NONES = SOUND INSULATIONT = THERMAL INSULATION
O0:O0OO
PARTITION TYPE(REFER TO FLOOR PLANS)
RATED ASSEMBLY TYPE:- = NOT A RATED ASSEMBLYA = SMOKE PARTITIONB = FIRE PARTITIONC = FIRE BARRIERD = FIRE & SMOKE BARRIERE = RATED STRUCTUREF = RATED STRUCTURE &
SMOKE BARRIERG = FIRE WALL
8"
1' -
6"
3' -
6"
6' -
8"
8" 4 1/8"
LOCATIONS FOR DOORS W/O SIDELITES
ADA COMPLIANT FIRE STROBE ALARM
THERMOSTAT / C02 / RELATIVE HEAT SENSORS
PROJECTOR SCREEN SWITCH
LIGHT SWITCHES-GANG ALL SWITCH WHERE POSSIBLE
NOTE: LOCATIONS SHOWN ARE TYPICAL FOR ALL DOORS WHETHER DOOR RECEIVES ALL ITEMS LISTED OR NOT. CONSULT ARCHITECT FIELD REP. FOR NON-TYPICAL CONDITIONS WHERE OBSTACLES/DIMENSIONS MAKE TYPICAL INSTALLATION VOID.
8"
1' -
6"
3' -
6"
6' -
8"
DOOR SHOWN IN OPEN POSITION.
ADA COMPLIANT FIRE STROBE ALARM.
THERMOSTAT/C02/RELATIVE HUMIDITY SENSORS
INTERIOR OF ROOM
LIGHT SWITCHES - GANG ALL SWITCHES WHERE POSSIBLE
NOTE: LOCATIONS SHOWN ARE TYPICAL FOR ALL DOORS WHETHER DOOR RECEIVES ALL ITEMS LISTED OR NOT. CONSULT ARCHITECT FIELD REP. FOR NON-TYPICAL CONDITIONS WHERE OBSTACLES/DIMENSIONS MAKE TYPICAL INSTALLATION VOID.
STRUCTURE
SEALANT, FIRE RATEDWHERE REQUIRED
PARTITION TO STUCTURE
ACOUSTICAL SEALANT
DEFLECTION TRACK
5/8" GYPSUM WALL BOARD
SAFING INSULATION
1"
FIRE RATED SEALANT, 1/2" OVERLAP, BOTH SIDES
*UL: HW-D-0042
FIRE STOP IN FLUTES AT
RATED POINTS
ACOUSTICAL SEALANT
REFER TO FLOOR PLAN FOR PARTITION TYPE
MATCH WALL DEPTH UP TO 8", HOLD GLAZED SIDE OF FRAME FLUSH WITH CMU
CONCRETE MASONRY UNIT
LINTEL, REFER TO STRUCTURAL
SEALANT AT BOTH SIDES
HOLLOW METAL FRAME
GROUT AS REQUIRED FOR FIRE RATING
4"
METAL STOP
GLAZING - SEE SCHEDULE
#4 @ 12" O.C. E.W.
#4 @ 16" O.C.
OPTIONAL CONST. JT.
CONC. GRADE BM. W/ (1) #5 CONT. TOP & BOT. (TYP. ALL SIDES OF PAD)
3' -
0"
MIN
.6
"
6"
CHAMFER / EASE ALL EDGES
CONTRACTOR INVOLVED
VERIFY SIZE REQUIRED W/
8"
W/ CONT'R
COORD. T/PAD
2'-6"2'-6"
2" RIGID INSULATION
8"
HSS4X4X3/16 POST
1/2" X 7" SQ. BASE PLATE
(4) 1/2" Ø EPOXY ANCHORS W/ 4" MIN. EMBED.
54
601601601601
111 111
TYP.110
TYP.105
*NOTE: CONSTRUCTION OF MECHANICAL SCREEN WALL TO MATCH THAT OF EXISTING SCREEN WALL ON CAMPUS AS CLOSELY AS POSSIBLE.
PH
ON
E
919.6
83.1
084
150 F
AYETTEV
ILLE S
TREET
RA
LEIG
H,
NC
27601
SU
ITE 8
20
RALEIG
H
PH
ON
E
614.4
86.1
960
274 M
ARC
ON
I BLV
D
CO
LU
MBU
S,
OH
43215
SU
ITE 2
00
CO
LU
MBU
S
PH
ON
E
513.2
71.1
634
302 W
EST 3
RD S
TREET
CIN
CIN
NA
TI,
OH
45202
SU
ITE 5
00
CIN
CIN
NATI
websi
te
ww
w.b
hdp.c
om
This
do
cu
men
t is
the
pro
du
ct a
nd
pro
pe
rty o
f B
axte
r H
od
ell
Don
ne
lly P
resto
n,
Inc.
N
eith
er
the
docum
ent
no
r th
e info
rma
tio
n it
co
nta
ins m
ay b
e c
opie
d o
r used
for
oth
er
than
th
e s
pecific
pro
ject
for
whic
h it w
as p
rep
are
d w
itho
ut
the w
ritte
n c
onsen
t o
f B
axte
r H
ode
ll D
onn
elly
Pre
sto
n, In
c.
1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 17
B
A
9
1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 179
Drawn
Project Manager
Checked
Contract Drawing Date
Project Number
Q
P
N
M
L
K
J
H
G
F
E
D
C
B
A
18 19
18 19
Q
P
N
M
L
K
J
H
G
F
E
D
C
B
PAUL D. ORBAN, LICENSE #13276EXPIRATION DATE: 12/31/2018
C:\Users\bhosfeld\Documents\Cadaver Lab_ARCH_17_MRN0101_Central_bhosfeld@bhdp.com.rvt 2/6/2018 3:35:41 PM
B.HOSFELD
P. ORBAN
L. BROCKWAY
01/15/18
MRN01.01
C-A700
DO
OR
SC
HE
DU
LE, D
ET
AIL
S, A
ND
PA
RT
ITIO
N T
YP
ES
CA
DA
VE
R L
AB
AN
D H
TC
RE
NO
VA
TIO
NS
MA
RI O
N T
EC
HN
I CA
L C
OLL
EG
E
PR
AT
ER
EN
GIN
EE
RIN
G A
SS
OC
IAT
ES
DOOR AND HARDWARE SCHEDULE
MARK
FIRE
RATING
OPENING FRAME DETAILS
HA
RD
WA
RE
SE
T
SC
HE
DU
LE
NO
TE
S
WID
TH
HE
IGH
T
TY
PE
MA
TL
FIN
GL
AS
S
TY
PE
MA
TL
FIN
GL
AS
S
HEAD JAMB SILL
112 3' - 6" 7' - 0" F WD ST -- 3-30 HM PT NR 3&5/C-A700 4,6,&8/C-A700 7/C-A700
112A 3' - 0" 7' - 0" F WD ST -- 1 HM PT -- 1/C-A700 2/C-A700 --
112B 3' - 0" 7' - 0" F WD ST -- 1 HM PT -- 1/C-A700 2/C-A700 --
118 3' - 0" 7' - 0" F WD ST -- 2 HM PT -- 3/C-A700 4/C-A700 --
GENERAL ARCHITECTURAL NOTES
CODED NOTES
105 POWDER-COATED MECHANICAL EQUIPMENT SCREEN WALL PROVIDEDAND INSTALLED BY CONTRACTOR. BASIS OF DESIGN IS OHIO GRATINGSINC. PW PRODUCT. CONTRACTOR TO PROVIDE NECESSARYATTACHMENT HARDWARE. SCREEN WALL TO BE 7'-0" HIGH. REFER TOSPEC. FOR FINISH. REFER TO TYPICAL EXTERIOR MECHANICALEQUIPMENT PAD DETAIL. COORDINATE WITH UNIVERSITY BEFOREORDERING. PROVIDE POWDER-COATING FINISH.
110 CONTRACTOR TO PROVIDE STEEL-POST TO SUPPORT MECHANICALSCREEN WALL PANELS. COORDINATE POST SPACING WITH SCREENWALL MANUFACTURER. POWDER-COAT TO MATCH THAT OF SCREENWALL PANELS. REFER TO TYPICAL EXTERIOR MECHANICAL EQUIPMENTPAD DETAIL.
111 METAL FABRICATED SCREEN WALL DOOR. CONTRACTOR TO PROVIDEALL NECESARRY METAL TUBING. METAL SCREEN WALL PANEL IN NOTE105 TO BE PROVIDED IN DOORS. PROVIDE ALL NECESSARY MOUNTINGHARDWARE. COORDINATE DESIGN WITH ARCHITECT BEFOREORDERING. PROVIDE POWDER-COAT FINISH.
601 ALIGN
FRAME TYPESDOOR TYPES
DOOR SCHEDULE LEGEND
DOOR SCHEDULE NOTES
3" = 1'-0"C-A700
1 DRYWALL HEAD 3" = 1'-0"C-A700
2 DRYWALL JAMB
3" = 1'-0"C-A700
6 MASONRY JAMB - SIDELITE
3" = 1'-0"C-A700
4 MASONRY JAMB - DOOR 3" = 1'-0"C-A700
3 MASONRY HEAD - DOOR
3" = 1'-0"C-A700
7 SILL 3" = 1'-0"C-A700
8 JAMB - SIDLITE TO DOOR
PARTITION TYPE LEGEND
PARTITION SYMBOL KEY
1/2" = 1'-0"C-A700
11 INSIDE DOOR CONTROLS 1/2" = 1'-0"C-A700
12 OPEN DOOR CONTROLS
1" = 1'-0"C-A700
9 TYP. HEAD DETAIL 1" = 1'-0"C-A700
10
TYP. PARTITION TERMINATION@ DECK
3" = 1'-0"C-A700
5 MASONRY HEAD - SIDELITE
3/4" = 1'-0"C-A700
13
TYPICAL EXTERIORMECHANICAL EQUIPMENT PAD
No.
Issue
/Revis
ion
/Subm
issio
nD
ate
3C
ON
TR
AC
T D
OC
UM
EN
TS
01
/15/1
8
4A
DD
EN
DU
M 2
02
/08/1
8
REFER TO DOOR HARDWARE SPEC. FOR HARDWARE SETS
1/4" = 1'-0"C-A700
14
EQUIPMENT SCREENELEVATION
4