Post on 20-Jan-2018
description
transcript
Agenda item 5 ESS Vision 2020: other activities
DIGICOM and SIMSTAT
DIME-ITDG joint plenaryLuxembourg, 24-25.02.2016
DIGICOM
Developments in 2015:• 12 Feb: Green light from ESSC to develop scope proposal• 14 April (VIG-VIN Workshop on ESS Vision 2020 implementation):
VIG asked to set up TF to develop Business Case• 29 May-10 Sept: TF DIGICOM videoconferences;
development of Business Case (in consultation with other stakeholders)
• 19 Nov: Business Case endorsed by the ESSC• 21 Dec: Steering Group (SG DIGICOM) set up
DIGICOM
SG DIGICOM:• Mandate to oversee the execution of DIGICOM
(to be approved by VIG)• 12 NSIs represented (AT,CH,DE,ES,FI,FR,IE,NL,PL,PT,SE,UK)• Inaugural meeting (Videoconference) of 4 February 2016
Work Package Teams:• To support implementation work in the four WPs • Request for expressions of interest to all ESS members
(via the VIN) forthcoming
DIGICOM
2016
-01
2016
-04
2016
-07
2016
-10
2017
-01
WP 1 User analysis Action 1.1-1 Inventory of shareable practices
Action 1.1-2–In-depth user analysisAction 1.1-3–User profiling
Action 1.2-1–Requirements for social network platformAction 1.2-2–Functional and technical specifications
Action 1.2-3–Develop and set-up of pilot social networkWP 2 Innovative and shareable products and tools
Action 2.1-1-Statistical portrait of EuropeAction 2.1-2-Design of multiple promotion channelsAction 2.1-3-Implementation of promotion channels
Action 2.2-1-Repository of shareable toolsAction 2.2-2-Requirements specification for toolsAction 2.3-1-Inventories of shareable solutions
Action 2.3-2-Participation to ESS visualisation eventAction 2.3-3-Piloting of embeddable visualisations
WP 3 Open data dissemination Action 3.1-1-Linked Open Data - Stocktaking and requirment gathering
Action 3.4-1-StocktakingWP 4 Communication and promotion
Action 4.3-1-Inventory of existing outreach and statistical literacy practicesAction 4.3-2-Development of statistical literacy products
Action 4.4-4 - Experimental data and statistics - population and roll-out
Plans for 2016
DIGICOM
Plans for 2016 – highlights:• Inventories• Social network platform• ESS Visualisation Workshop 17-18 May (Valencia)• Statistical portrait of Europe• Experimental statistics
DIGICOM
DIME-ITDG involvement• Foreseen in particular for WP3 (Open Data):
• Linked Open Data
• Dissemination of microdata
• Also for other areas, such as quality• Coordination via the corresponding Work Package Teams
SIMSTAT: Activities in 2015
Agreement on all relevant statistical issues ensuring exchange of micro-data on intra-EU trade
Agreement on the organisation of the pilot exchange Development of the IT system (Hub, Communication
component) Connection of all participating MSs to the network CCN Agreement on the procedure to analyse exchanged data,
to document the results and to draft the reports.
SIMSTAT: Activities in 2015
Pilot exchange of micro-data Participants: AT, BG, CZ, DE, DK, EE, EL, FI, FR, HR,
IT, LT, LU, LV, MT, PL, PT, RO, SI and SK Time: April – October 2015 Data elements: 31 data elements, as agreed Reference period: January 2013 – August 2015 Volume: MSs transmitted 839 files, 17.4 GB (zipped) to
the Hub; and received 23 731 files, 23.1 GB (zipped) from the Hub.
SIMSTAT: Activities in 2015
Following the pilot exchange, the MSs: analysed the exchanged micro-data with the aim to
assess quality, completeness, comparability and re-usability of the exchanged micro-data
evaluated the exchange process from an IT point of view documented the results, and drafted individual country reports.
SIMSTAT
Current developments On the basis of the inputs received from the Member
States Eurostat has prepared a consolidated report The report was discussed in the SIMSTAT Task Force
and the related IT Task Force on 9 February 2016 It will be presented to the SIMSTAT Steering Committee
on 2 March 2016, for approval, and to ITGS-Steering Group on 3-4 March 2016.
SIMSTAT
Next steps VIG+VIN workshop
15 March 2016 BSDG-SDG
17 March 2016 Stakeholders' forum
7 April 2016 BoP Working Group
20-21 April 2016 NA Working Group
written consultation BSDG
written consultation ESSC meeting
18-19 May 2016
SIMSTAT
DIME-ITDG involvement
Developments of the IT systems was presented to ITDG plenary in 2015
Results on the pilot data exchange were presented to DIME-ITDG steering committee in November 2015
Final report will be sent to DIME-ITDG for written consultation in March/April 2016
ESS Vision 2020: other activities
Thank you for your attention !
Questions?