1

AGENDA

2

• 7:00 p.m. Welcome and Opening Remarks• 7:05 p.m. Review of Master Plan Process and Feedback Received to Date• 7:15 p.m. Vision Zero Overview• 7:20 p.m. Bicycle Master Plan Overview• 7:30 p.m. Veirs Mill Corridor Master Plan – Vision and Recommended Approach• 8:00 p.m. Discussion and Feedback on Recommended Approach• 8:45 p.m. Next Steps

PLANNING CONTEXT

3

Veirs Mill Corridor Master Plan Boundary

4

PLANNING PROCESS RECAP

5

PLANNING PROCESS RECAP

6

VEIRS MILL BUS RAPID TRANSIT

VEIRS MILL ROAD

7

COMMUNITY OUTREACH

• Community Meetings:• February 22, 2017• March 29, 2017• May 15, 2017

• Neighborhood Events:• Taste of Wheaton• Wheaton North – Blooming the Neighborhood• Viers Mill Baptist Church – Summer Carnival• Holiday Park • National Night Out• Wheaton Arts Parade and Festival

• Online Engagement:• Interactive Feedback Map• Questionnaire

8

COMMUNITY OUTREACH

9

COMMUNITY FEEDBACK

10

VISION ZERO

• The County Council adopted Vision Zero by resolution on October 1, 2016.

• The Executive is required to develop and report on a Vision Zero Action Plan that includes:

• The date by which to achieve zero deaths;• A set of activities that County agencies will

take to implement the Action Plan; and• A set of recommended policy changes at

the state and local levels

• The Executive designated a working group to develop the Action Plan, including representatives from the Planning Department.

11

BICYCLE MASTER PLAN

• Purpose• Outreach• Recommendations• Schedule

12

BICYCLE MASTER PLAN - PURPOSE

Commuting

Running Errands

Going to School

Accessing Transit

Entertainment

Recreating

13

BICYCLE MASTER PLAN - OUTREACH

14

BICYCLE MASTER PLAN - OUTREACH

www.mcatlas.org/bikereact

15

BICYCLE MASTER PLAN - RECOMMENDATIONS

16

BICYCLE MASTER PLAN - RECOMMENDATIONS

17

BICYCLE MASTER PLAN - SCHEDULE

• Summer 2017: Public Meetings• December 2017: Planning Board Public Hearing• Winter 2018: Planning Board Worksessions• Spring 2018: County Council Public Hearing

18

PLAN VISION

• Preserve and strengthen the Veirs Mill Corridor communities by enhancing existing community resources, increasing connectivity and promoting safety in the public realm.

19

APPROACH

• Long-term recommendation to accommodate all desired transportation modes within the Master Plan right-of-way

• Interim recommendation to increase pedestrian and bicycle safety and mobility

20

PEDESTRIANS

21

BICYCLISTS

Separated Bike Lane – Russellville, AK

Proposed Streetscape – Kansas City, MOQueens Plaza – Long Island City, NY

22

BUS RAPID TRANSIT AND LOCAL BUS

Bus Rapid Transit – Eugene, OR

Bus Rapid Transit – Alexandria, VA

Bus Rapid Transit – Cleveland, OH

23

CHALLENGES – CONSTRAINED RIGHT OF WAY Existing Conditions• Unprotected sidewalk

only one side• No facilities for bicycles• Conflicts between

overhead utilities and trees

24

CHALLENGES – CONSTRAINED RIGHT OF WAY

100 ft R.O.W. (Existing)

25

CHALLENGES – FUTURE STREETSCAPE

120 ft R.O.W. (Per K-W Master Plan)

26

CHALLENGES – CONSTRAINED RIGHT OF WAY

Protected Sidewalks

Protected Bikeways

Dedicated Busways

Shared-UsePathways

Pros• Protected facilities for

pedestrians and cyclists• Existing curbs remain, reducing

extent of constructionCons• Conflicts between driveways

and other uses

27

CHALLENGES – FUTURE STREETSCAPE

100 ft R.O.W. (Existing)

Pros• No property impactsCons• Will require full road

reconstruction• No separation between

pedestrian and bicycle riders• Conflicts between driveways

and other uses remain

Dedicated Busways

Shared-UsePathways

28

CHALLENGES – FUTURE STREETSCAPE

Pros• No property impactsCons• Will require full road

reconstruction• No separation between

pedestrian and bicycle riders• Conflicts between driveways

and other uses remain

Dedicated Busways

Shared-UsePathways

29

INTERIM IDEAS

30

INTERIM IDEAS

Dale Drive, Silver SpringExisting Conditions, Veirs Mill Road at Town and Country Community

31

FEEDBACK AND DISCUSSION

32

COMMUNITY OUTREACH

NEXT STEPS

33

• October 24: Community Meeting #5• Mid-December: Community Meeting #6• January: Planning Board – Preliminary Recommendations• February: Planning Board – Working Draft of Master Plan• March: Planning Board Public Hearing• March - April: Planning Board Worksessions• April: Approval of Planning Board Draft Master Plan• June: County Council Public Hearing

34

CONNECT WITH US

• Staff Contacts

Jessica McVaryPhone: 301-495-4723Email: Jessica.McVary@montgomeryplanning.org

Nancy SturgeonPhone: 301-495-1308Email: Nancy.Sturgeon@montgomeryplanning.org

• Project Webpage: www.montgomeryplanning.org/veirsmill

• Twitter: @montgomeryplans

• Facebook: Facebook.com/montgomeryplanning