Akbar-birbal Way of Vave

Post on 26-Sep-2015

546 views 70 download

Tags:

description

DCAC

transcript

PowerPoint Presentation

VALUE = Function= P-R-Q + Serviceability Cost CostVI Innovative Design At concepts/idea conceivable stage

VE New Product Design Before Production Release

VA Existing Products In productionVALUE ANALYSIS / VALUE ENGINEERING Same or Better Value at Lowest CostNOT DESIRABLENOT DESIRABLEDESIRABLEGOODCostFunctionFunctionCostCostFunctionFunctionCost13