Al Thomas Playground Replacement & Park Improvements

Post on 07-Jan-2016

33 views 0 download

description

Al Thomas Playground Replacement & Park Improvements. March 16, 2011 Presenters: Amanda Peterson Jeanette Sanchez Joliette Woodson. Funding. 2011 Capital Improvement Project Budget $80,000 Funding Source Is ADCO Open Space. Budget Breakdown. TOTAL BUDGET$80,000 - PowerPoint PPT Presentation

transcript

1

Al Thomas Playground Replacement & Park Improvements

March 16, 2011

Presenters:Amanda PetersonJeanette SanchezJoliette Woodson

2

Funding

• 2011 Capital Improvement Project Budget $80,000 Funding Source Is ADCO Open Space

3

Budget Breakdown• TOTAL BUDGET $80,000• Mobilization and Administration Costs $ 8,000• Demolition $ 2,000• Fence Construction $11,000• Painting of Existing Equipment $ 1,000• Sidewalk Construction $ 7,000• Wood Fiber Play Surface $ 3,000• Contingency $ 8,000• New Playground Equipment Budget $40,000

4

Park Improvement Prioritization

• New Playground Equipment

• ADA Accessible Sidewalk and Ramps

• Partial Fence Replacement

• Re-painting of 4-Square Court and Existing Equipment

• Basic Landscaping Improvements

5

EXISTING PARK Equipment To Remain

6

EXISTING PARK Equipment To Be Replaced

7

Playground Design Considerations

• ADA Compliant• Vandal Resistant

Graffiti• Safety Zone Compliant

ASTM 1487 US Consumer Product Safety Commission

• Ease of Maintenance

8

Playground Equipment Strategy

• Leave in place playground equipment that is in good condition. This includes the climber and swings. Repaint existing equipment to match new equipment.

• Replace large play structure Focus Age Group: 5 to 12 years of age.

• Any questions regarding playground prioritization and strategy?

9

Type of Playground Equipment

• Modern Play Equipment

• Traditional Play Equipment

• Hybrid (Modern/Traditional) Equipment

10

Modern Playground Equipment

11

Traditional Playground Equip.

12

Hybrid Playground Equip.

13

Preferred Play Equipment Components

• Slides

• Independents

• Climbing Structures

14

Preferred Play Equipment Components

• Activity Panels

• Spinners

• Overhead

15

Layout Option A

16

Layout Option B

17

Layout Option C

18

Layout Option D

19

Layout Option E

20

Al Thomas Park Improvement Selection Process

-Presentation Available at www.northglenn.org/p60.html

-Email comments/questions to jwoodson@northglenn.org

21

NEXT STEPS• Second Community Meeting

May 11, 2011 at 6:30 p.m. at Northglenn Christian Church

• Presentation outlining several design options Based on March’s community meeting feedback Based on available budget Based on safety zone & space constraints

Thank you for your time and your feedback