ALL BACKCIRCLED FINAL FOR CHANGES PER CONSTRUCTION

Post on 17-Mar-2022

2 views 0 download

transcript

- 29/OCT/19

10987654321

A

B

C

D

E

F

A

B

C

D

E

F

EGAT Document Rev.

Document Status

Other Document Code (If any)Scale

Title, Subtitle

Contractor

Project

Client

Revision Date

EGAT Document no.

Revision History

Checked : Approved :Created :

ApprovedCheckedCreated

Owner

Contractor

Responsible Dept.

Originator Document No.

Format

Rev.DateSheet

Originator

Space for Stamping

Bang Pakong Combined Cycle (Units 1-2 Replacement) Project

Electricity Generating Authority of Thailand

Rev. Description

A1

A1

R

R

R

PT

41CP001A

PT

41CP001B

TE

41CT003

TE

41CT002

TW

41CT800

PT

41CP002A

PT PT

41CP002C

TW

41CT801A

TW

41CT801B

D

E

B

C

PIPING AND INSTRUMENT DIAGRAM

HOT REHEAT STEAM

E

G192675-10LBB-M2590

-

XX

MA

B11

AA202

HR

100

PT

35CP001A

PT

35CP001B

25

BR308

XXLB

B41

25

BR300

XX

MA

N35

25

BR301

XX

MA

N35

50

BR009

XXLBB41

TEGE

BV

TM

051

0008

HR

801

BV

HR

803

GE

900

BR001

XXMAN35

CONDENSER

BR001

XXLBA40

900

BR001

XXMAN34

41CP002B

25

BR300

XXLB

B41

25

BR301

XXLB

B41

TE

41CT004

GE BVGE BV

TE TE

41CT001B41CT001A

TE

41CT001C

BVGE BVGE BVGE

HR

701

HR

702

HR

703

150

BR001

XXMAN31

15

BR300

XX

MA

N31

15

BR301

XX

MA

N31

25

XX

MA

N31

25

BR305

XX

MA

N31

FT

31CF002A

PDT

31CP001

100

BR002

XX

MA

N31

CONNECTION

CLEANING

CHEMICAL

50

BR003

XXMAN31

25

BR002

XX

MA

L41

SD

311

CONDENSATE

XX

MA

B12

AA202

650

BR004

XXLBB41

HRSG BLOWDOWN TANK

0002

TE TE

12CE1X

12CE1X

12RD22 11RC21

25

BR306

XXLB

B41

25

BR307

XXLB

B41

27/JUN/18

KSA

KSA

AT001

25

BR200

XX

MA

N31

DR

31CF001

25

BR201

XX

MA

N31

TT

50

NOTE 3

PRE-WARMING LINE

BYPASS VALVE

NO

TE 2

25

BR001

XX

MA

L41

NO

TE 2

BV

GE GE

BV

BR007

XXLB

B41

500

41CT802B

TW

41CT802A

TW

41CT803A

TW

41CT803B

TW

25

BR309

XXLBB41

25

BR310

XXLBB41

NOTE 6 NOTE 6

NOTE 6

NOTE 6

NOTE 6

NOTE 6

NOTE 5

BR304

15

BR302

XX

MA

N31

15

BR303

XX

MA

N31

31CF002B

FT

150

BR001

XX

MA

N33

150

BR001

XXMAN32

12CE1X

12

RA2

X

LO

NOTE 7

BV GE

25

BR311

XXMAB20

25

BR313

XXMAB20

25

BR315

XXMAB20

20CP001A

PT

20CP001B

PT

20CP001C

PT

HR

HR

HR

GE BV

HR

HR

RE

HE

AT S

TE

AM

HRS

G H

OT

700

BR001

XXLBB41

14

RD2S

14

RD2S

500

BR008

XXLB

B41

BV

VPI

T

503

10LCA-M2343B

10LCA-M2343A

10LCQ-M2582

VALVE STEM LEAKOFF

MAIN STEAM CONTROL

10MAW-M2639A

300

BR005

XXLB

B41

000310LFC-M2586A

NOTE 3

50

50

BR003

XXLBB41

14RD2S

14

RD2S

E/H

E/H

E/H

E/H

IP STEAM

TURBINE

NOTE 9

NOTE 6

YKG TN

WUN JSN

NOTE 8

300

BR002

XXLB

B41

VT

25

BR200

XXLB

B41

35CT001A 35CT001B

25

BR200

XX

MA

N34

VT

E/H

GE BV

GE BV

831

832

833

834

NOTE 10

NOTE 5

AA001

AA704 AA705

AA700 AA701

AA001

AA501AA500

AA700 AA701

AA713 AA710

AA715

AA711

AA709 AA710

AA500

AA500 AA706 AA707 AA708

AA003

AA002

AA702 AA703

AA200

AA201

AA001

AA200

AA700 AA701

803

50

BR006

XXLBB41

14

RD2S

AA002AA202 14RD2S

LO

25

BR201

XXLBB41

25

BR310

XXMAB20

SD

GE

BV

411

25

BR202

XXLBB41

AA501 AA502

VT VT

14RD2S

HR

BV

GE

200

AA201XXMAB11

AA201XXMAB12

25

BR201

XXMAN33

DR

14RD2S

14RD2S

14RD2S

14RD2S

14RD2S

14RD2S

14

RD2S

14

RD2S

600

BR010

XXLBB41

14RD2S

BPRP1-D-BVTEM-10LBB-1002

AA200

450 450

12

CE1

X

D-S

BV

EM-1

0H

A-0

008

25

BR302

XXLB

B41 AA711

NOTE 5

40CT001

40

BR003

XXMAA45

14RD2S

D-BVTEM-10LCA-1011

D-BVTEM-10LCA-1010

D-BVTEM-10MAW-1056

D-BVTEM-10LCQ-1005

50

BR001

XXLFC13

14RD2SD-BVTEM-10LFC-1012

AA501

17/DEC/18 REVISED PER EGAT COMMENTSKSA WUN JSN

STRAIGHT PIPE DOWNSTREAM OF BYPASS VALVE NOT LESS THAN 9.0 M.

STRAIGHT PIPE UPSTREAM OF BYPASS VALVE NOT LESS THAN 2.5 M AND7.

TURBINE FIELD TESTING.

CAP (FNPT). REMOVE PIPE CAP AND INSTALL TEST TEMPERATURE ELEMENT FOR

TEST THERMOWELL WITH 15 MM (1/2 INCH) PIPE NIPPLE (MNPT) AND PIPE6.

PIPE PLUG FOR NITROGEN PURGING.

LINE AND PRESSURE TRANSMITTER FOR TURBINE FIELD TESTING. REMOVE

PLUG (MNPT). REMOVE PIPE PLUG AND INSTALL INSTRUMENT TUBE IMPULSE

ISOLATION VALVE WITH 15 MM (1/2 INCH) INSERT ADAPTER (FNPT) AND PIPE5.

NOTED.

TEMPERATURE INSTRUMENT CONNECTION SIZE IS 40 MM UNLESS OTHERWISE4.

AND REPLACE WITH SWLD CAPS AFTER STEAM BLOW.

CAPS ON DRAINS TO BE FABRICATED WITH THREADED CAPS. CUT OFF THREAD3.

SLOPE OF 21 MM PER METER (0.25 INCH PER FOOT).

PITCH BEFORE SEAT DRAIN DOWNWARD INTO HOT REHEAT LINE AT A MINIMUM2.

FOR COMPONENTS ASSOCIATED WITH UNIT 1 AND 2 RESPECTIVELY.

ALL SYSTEM COMPONENTS ARE SERIES XXLBBNNFFYYY WHERE XX IS 11 AND 121.

NOTES:

14RD2S

50

BR011

XXLBB41

00410LFC-M2586A

D-BVTEM-10LFC-1012

AA004

14RD2S14RD2S

14RD2S50

BR001

XXLFC14

AA003

50

BR012

XXLBB41

50

BR001

XXLFC15

14RD2S005 10LFC-M2586A

D-BVTEM-10LFC-1012

STEAM TURBINE FLASH TANK

STEAM TURBINE FLASH TANK

STEAM TURBINE FLASH TANK

BR004

XXLCA34

12CE1X

150

14RD2S

50

BR001

XXLCQ12

AA005 AA006

0001

XXMAB10HA001

NOTE 11

NOTE 12

41CF001

BR001

XX

MA

N37

150

12

RB2

X

LO

LO

NOTE 12

NOTE 12

0001

150 150

40

P&ID LEGENDD-BVTEM-01UUU-1015

P&ID LEGENDD-BVTEM-01UUU-1014

LEGEND REFERENCE DRAWING:14.

TRANSITION FOR DIFFERRENT MATERIAL.13.

INSERT SOCKET WELDED CAP AFTER HYDROTEST.12.

SCHEMATIC DIAGRAM STEAM SYSTEMD-SGEEM-10MAA-1009

GE REFERENCE DRAWING:11.

MANUFACTURER'S RECOMMENDATION.

STRAINER MESH OPENING SHALL BE AS PER SPRAY WATER CONTROL VALVE10.

THAN 17.9 METER.

DISTANCE OF FIRST TEMPERATURE ELEMENT AFTER BYPASS VALVE IS NOT LESS9.

THAN 5 TIMES OF THE PIPE OUTLET DIAMETER.

DISTANCE OF FIRST PRESSURE SENSOR AFTER BYPASS VALVE IS NOT LESS8.

NOTE 13

NOTE 12

NOTE 12

09/MAY/19 KSA YKG TN APPROVED FOR CONSTRUCTION

THE DISTRIBUTION AND USE OF THE NATIVE

FORMAT CAD FILE OF THIS DRAWING IS

UNCONTROLLED. THE USER SHALL VERIFY

TRACEABILITY OF THIS DRAWING TO THE LATEST

CONTROLLED VERSION.

CONSTRUCTIONAPPROVED FOR

AA204

AA203

29/OCT/19 REVISED PER ECN N-M-0020SKN YKG TN

MECHANICAL

25

BR203

XXLB

B41

VT

NOTE 12

AA503

ECN N-M-0020

ALL BACKCIRCLEDCHANGES PER

REVISED PER EGAT COMMENTS

kos80564

OpenPla

nt PID v

8.1

1.9.8

64

10/28/2019 3:2

2:5

2 P

M

Italian-Thai Development Public Co., Ltd.

Black & Veatch (Thailand) Ltd. and

The Consortium of Sumitomo Corporation,

1:1 F

ull Size

FINAL FOR

CONSTRUCTION09/MAY/19

FINAL FOR CONSTRUCTION