American Recovery and Reinvestment Act of 2009

Post on 22-Feb-2016

34 views 0 download

Tags:

description

American Recovery and Reinvestment Act of 2009. Community Development Block Grant –Recovery (CDBG-R) Bar 2 Subdivision Street Improvements - Phase II. Bar 2 Subdivision Aerial Map. Bar 2 Street Improvements. Contractor: Total Commitment, LLC Project duration: three (3) months - PowerPoint PPT Presentation

transcript

American Recovery and Reinvestment Act of 2009

Community Development Block Grant –Recovery (CDBG-R)

Bar 2 Subdivision StreetBar 2 Subdivision StreetImprovements - Phase IIImprovements - Phase II

Bar 2 Subdivision Aerial Map

Bar 2 Street Improvements

Contractor: Total Commitment, LLC

Project duration: three (3) months

Total Project Costs: $254,289.70 Jobs Sustained or Created: 2.7

Project Details

18” Curb and Gutter Flex-base Asphaltic Concrete Streets 4’ Reinforced Concrete Sidewalks Electrical Conduit

Preconstruction Phase Nopal Street

Preconstruction Phase Mesquite Street

ARRA CDBG-R Project Sign

Construction Phase Nopal Street: Flexible Base

Construction Phase Nopal Street: Flexible Base

Construction Phase Mesquite Street: Flexible Base

Construction Phase Mesquite Street: Flexible Base

Construction Phase Nopal Street: Flexible Base

Construction Phase Nopal Street: Flexible Base

Construction Phase Mesquite Street: Curb & Gutter

Construction Phase Nopal Street: Curb & Gutter

Construction Phase – Nopal Street: Sidewalks

Construction Phase - Nopal Street: Flexible Base & Sidewalks

Construction Phase Mesquite Street: Hot Mix Asphalt

Construction Phase Nopal Street: Hot Mix Asphalt

Project Complete Nopal Street

Project Complete Nopal Street

Project Complete Mesquite Street

Project Complete Mesquite Street

Bar 2 Subdivision… “A New Beginning”

Nopal Street Mesquite Street

Thank You