An Overview over Online Systems at the LHC
Invited Talk at NSS-MIC 2012Anaheim CA, 31 October 2012
Beat Jost , Cern
Beat Jost, Cern
Acknowledgments and Disclaimer
I would like to thank David Francis, Frans Meijers and Pierre vande Vyvre for lots of material on their experiments
I would also like to thanks Clara Gaspar and Niko Neufeld for many discussions
There are surely errors and misunderstandings in this presentation which are entirely due to my shortcomings
2NSS-MIC Anaheim 31 October 2012
Beat Jost, Cern
Outline
❏ Data Acquisition Systems➢ Front-end Readout➢ Event Building
❏ Run Control➢ Tools and Architecture
❏ Something New – Deferred Triggering❏ Upgrade Plans
3NSS-MIC Anaheim 31 October 2012
Beat Jost, Cern
Role of the Online System
❏ In today’s HEP experiments millions of sensors are distributed over hundreds of m2 and actuated dozens million times per second
❏ The data of all these sensors have to be collected and assembled in one point (computer, disk, tape), after rate reduction through event selection➢ This is the Data Acquisition (DAQ) system
❏ This process has to be controlled and monitored (by the operator)➢ This is the Run Control System
❏ Together they form the Online systemAnd, by the way, it’s a pre-requisite for any physics analysis 4NSS-MIC Anaheim 31 October 2012
Beat Jost, Cern
Setting the Scene – DAQ Parameters
5NSS-MIC Anaheim 31 October 2012
Beat Jost, Cern
A generic LHC DAQ system
6NSS-MIC Anaheim 31 October 2012
Sensors
Front-End Electronics Aggregation
Aggregation/(Zero Suppression)
Zero Suppression/Data Formatting/Data Buffering
Event BuildingNetwork
HLT Farm
Perm. Storage
On/
near
Det
ecto
rO
ff D
etec
tor
Front-End Electronics
Front-End Electronics
Front-End Electronics
Front-End Electronics
Today’s data rates are too big to let all the data flow through a single component
Beat Jost, Cern
❏ The DAQ System can be viewed like a gigantic funnel collecting the data from the sensors to a single point (CPU, Storage) after selecting interesting events.
❏ In general the response of the sensors on the detector are transferred (digitized or analogue) on point-point links to some form of 1st level of concentrators➢ Often there is already a concentrator on the detector electronics,
e.g. readout chips for silicon detectors.➢ The more upstream in the system, the more the technologies at
this level differ, also within the experiments➥ In LHCb the data of the Vertex detector are transmitted in analogue
form to the aggregation layer and digitized there
❏ The subsequent level of aggregation is usually also used to buffer the data and format them for the event-builder and High-level trigger
❏ Somewhere along the way, Zero suppression is performed
Implementations – Front-End Readout
7NSS-MIC Anaheim 31 October 2012
Beat Jost, Cern 8NSS-MIC Anaheim 31 October 2012
DDL
Optical 200 MB/s ~500 links Full duplex: Controls FE (commands, Pedestals, Calibration data)Receiver card interfaces to PC
Yes
SLINKOptical: 160 MB/s ~1600 LinksReceiver card interfaces to PC.
Yes
SLINK 64
LVDS: 400 MB/s (max. 15m) ~500 linksPeak throughput 400 MB/s to absorb fluctuations, typical usage 2kB@100 kHz = 200 MB/s.Receiver card interfaces to commercial NIC (Myrinet)
Yes
Glink (GOL)
Optical 200 MB/s ~4800 links+ ~5300 analog links Before Zero SuppressionReceiver card interfaces to custom-built Ethernet NIC (4 x 1 Gb/s over copper)
(no)Trigger Throttle
Readout Links of LHC ExperimentsFlow Control
Beat Jost, Cern
Implementations – Event Building
❏ Event building is the process of collecting all the data fragments belonging to one trigger in one point, usually the memory of a processor of a farm.
❏ Implementation typically using a switched network➢ ATLAS, ALICE and LHCb Ethernet➢ CMS 2 steps, first with Myrinet, second Ethernet
❏ Of course the implementations in the different experiments differ in details from the ‘generic’ one, sometimes quite drastically.➢ ATLAS implements an additional level of trigger, thus reducing the
overall requirements on the network capacity➢ CMS does event building in two steps; with Myrinet (fibre) and 1
GbE (copper) links➢ ALICE implements the HLT in parallel to the event builder thus
allowing bypassing it completely➢ LHCb and ALICE use only one level of aggregation downstream of
the Front-End electronics.
9NSS-MIC Anaheim 31 October 2012
Beat Jost, Cern 10NSS-MIC Anaheim 31 October 2012
EthernetSingle Stage event–building- TCP/IP based Push protocol- Orchestrated by an Event Destination Manager
Ethernet
Staged Event-Building via a two-level trigger system- partial readout driven by ROI (Level-2 trigger)- full readout at reduced rate of accepted eventsTCP/IP based pull protocol
Myrinet/Ethernet
Two-stage Full Readout of all triggered events- first stage Myrinet (flow control in hardware)- second stage with Ethernet TCP/IP and driven by Event Manager
Ethernet
Single stage event-building directly from Front-end Readout Units to HLT farm nodes- driven by Timing&Fast Control system- pure push protocol (raw IP) with credit-based congestion control. Relies on deep buffers in the switches
SWITCH
HLT farm
Detector
TFC System
SWITCHSWITCH SWITCH SWITCH SWITCH SWITCH
READOUT NETWORK
L0 triggerLHC clock
MEP Request
Event building
Front-End
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
Readout Board
Expe
rimen
t Con
trol
Sys
tem
(EC
S)
VELO ST OT RICH ECal HCal MuonL0
Trigger
Event dataTiming and Fast Control SignalsControl and Monitoring data
SWITCH
MON farm
CPU
CPU
CPU
CPU
Readout Board
Readout Board
Readout Board
Readout Board
Readout Board
Readout Board
FEElectronics
FEElectronics
FEElectronics
FEElectronics
FEElectronics
FEElectronics
FEElectronics
Event Building in the LHC Experiments
GDC TDSM
CTP
LTU
TTC
FERO FERO
LTU
TTC
FERO FERO
LDCLDC
BUSY BUSY
Rare/All
Event Fragment
Sub-event
Event
File
Storage Network (8GB/s)PDS
L0, L1a, L2
L0, L1a, L2
360 DDLs
D-RORCD-RORC
EDM
LDC
D-RORC D-RORC
Load Bal. LDC LDC
D-RORC D-RORC
HLT Farm
FEPFEP
DDL
H-RORC
10 DDLs
10 D-RORC
10 HLT LDC
120 DDLs
DADQM
DSS
Event Building Network (20 GB/s)
430 D-RORC
175 Detector LDC
75 GDC30 TDSM
18 DSS60 DA/DQM
75 TDS
Archiving on Tapein the ComputingCentre (Meyrin)
SWITCH
HLT farm
Detector
TFC System
SWITCHSWITCH SWITCH SWITCH SWITCH SWITCH
READOUT NETWORK
L0 triggerLHC clock
MEP Request
Event building
Front-End
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
Readout Board
Expe
rimen
t Con
trol
Sys
tem
(EC
S)
VELO ST OT RICH ECal HCal MuonL0
Trigger
Event dataTiming and Fast Control SignalsControl and Monitoring data
SWITCH
MON farm
CPU
CPU
CPU
CPU
Readout Board
Readout Board
Readout Board
Readout Board
Readout Board
Readout Board
FEElectronics
FEElectronics
FEElectronics
FEElectronics
FEElectronics
FEElectronics
FEElectronics
Beat Jost, Cern
Controls Software – Run Control
❏ The main task of the run control is to guarantee that all components of the readout system are configured in a coherent manner according to the desired DAQ activity.➢ 10000s of electronics components and software processes➢ 100000s of readout sensors
❏ Topologically implemented in a deep hierarchical tree-like architecture with the operator at the top
❏ In general the configuration process has to be sequenced so that the different components can collaborate properly Finite State Machines (FSM)
❏ Inter-Process(or) communication (IPC) is an important ingredient to trigger transitions in the FSMs
11NSS-MIC Anaheim 31 October 2012
Beat Jost, Cern
Control Tools and Architecture
ALICE ATLAS CMS LHCb
IPC Tool DIM CORBA XDAQ (HTTP/SOAP) DIM/PVSS
FSM Tool SMI++ CLIPS RMCS/XDAQ SMI++
Job/Process Control DATE CORBA XDAQ PVSS/FMC
GUI Tools Tcl/Tk Java Java Script/Swing/Web Browser PVSS
12NSS-MIC Anaheim 31 October 2012
LVDev1
LVDev2
LVDevN
DCS
SubDetNDCS
SubDet2DCS
SubDet1DCS
SubDet1LV
SubDet1TEMP
SubDet1GAS
…
…
Co
mm
and
s
DAQ
SubDetNDAQ
SubDet2DAQ
SubDet1DAQ
SubDet1FEE
SubDet1RO
FEEDev1
FEEDev2
FEEDevN
ControlUnit
DeviceUnit
…
…
Legend:
INFR. TFC LHC
ECS
HLT
Sta
tus
& A
larm
s
Run Control
DetectorControl
ex. LHCb Controls Architecture
Beat Jost, Cern
GUI Example – LHCb Run Control
13NSS-MIC Anaheim 31 October 2012
Main operation panel for the shift crew
Each sub-system can (in principle) also be driven independently
Beat Jost, Cern
Error Recovery and Automation
❏ No system is perfect. There are always things that go wrong➢ E.g. de-synchronisation of some components
❏ Two approaches to recovery ➢ Forward chaining
➥ We’re in the mess. How do we get out of it?– ALICE and LHCb: SMI++ automatically acts to recover– ATLAS: DAQ Assistant (CLIPS) operator assistance– CMS: DAQ Doctor (Perl) gives operator assistance
➢ Backward chaining➥ We’re in the mess. How did we get there?
– ATLAS: Diagnostic and Verification System (DVS)
❏ Whatever one does: One needs lots of diagnostics to know what’s going on.
14NSS-MIC Anaheim 31 October 2012
Snippet of forward chaining (Big Brother in LHCb):
object: BigBrother state: READY when ( LHCb_LHC_Mode in_state PHYSICS ) do PREPARE_PHYSICS when ( LHCb_LHC_Mode in_state BEAMLOST ) do PREPARE_BEAMLOST ... action: PREPARE_PHYSICS do Goto_PHYSICS LHCb_HV wait ( LHCb_HV ) move_to READY action: PREPARE_BEAMLOST do STOP_TRIGGER LHCb_Autopilot wait ( LHCb_Autopilot ) if ( VELOMotion in_state {CLOSED,CLOSING} ) then do Open VELOMotion endif do Goto_DUMP LHCb_HV wait ( LHCb_HV, VELOMotion ) move_to READY ...
Beat Jost, Cern
Summary
❏ All LHC Experiments are taking data with great success➢ All implementations work nicely➢ The systems are coping with the extreme running conditions,
sometimes way beyond the original requirements➥ ATLAS and CMS have to cope with upto 40 interactions/bunch
crossing (requirement was ~20-25) LHCb ~1.8 interactions instead of 0.4 as foreseen.
➥ Significantly bigger event sizes➥ Significantly longer HLT processing
❏ Availability of the DAQ systems are above 99%➢ Usually it’s not the DAQ hardware that doesn’t work
❏ The automatic recovery procedures implemented keep the overall efficiency typically above 95%, mainly by faster reaction and avoidance of operator mistakes.
15NSS-MIC Anaheim 31 October 2012
Beat Jost, Cern
Something New – deferred Trigger
❏ The inter-fill gaps (dump to stable-beams) of the LHC can be significant (many hours, sometimes days)
❏ During this time the HLT farm is basically idle❏ The idea is to use this idle CPU time for executing the HLT
algorithms on data that was written to a local disk during the operation of the LHC.
16NSS-MIC Anaheim 31 October 2012
Moore Moore Moore
MEPrx
DiskWr
MEP
ResultOverflow
OvrWr Reader
MEP buffer full?
No
YesFarm Node
Beat Jost, Cern
❏ Currently deferring ~25% of the L0 Trigger Rate➢ ~250 kHz triggers
❏ Data stored on 1024 nodes equipped with 1TB local disks
❏ Great care has to be taken ➢ to keep an overview of which nodes hold files of which
runs.➢ Events are not duplicated
➥ During deferred HLT processing files are deleted from disk as soon as they are opened by the reader
❏ Starting and stopping is automated according to the state of the LHC➢ No stress for the shift crew
Deferred Trigger – Experience
17NSS-MIC Anaheim 31 October 2012
Start of Data
taking
Beam Dump
Start of deferred
HLT
End deferred HLT
Start of Data
taking
Beam Dump
Online troubles
New fillStart of
Data taking
Nu
mb
er o
f fi
les
Beam Dump
Start of deferred
HLT
Beat Jost, Cern
Upgrade Plans
❏ All four LHC experiments have upgrade plans for the nearer or farther future➢ Timescale 2015
➥ CMS– integration of new point-to-point link (~10 Gbps) to new back-end electronics (in µTCA)
of new trigger/detector systems– replacement of Myrinet with 10 GbE (TCP/IP) for data aggregation in to PCs and
Infiniband (56 Gbps) or 40 GbE for event building
➥ ATLAS: merging of L2 and HLT networks and CPUs➥ Each CPU in Farm will run both triggers
➢ Timescale 2019➥ ALICE: increase acceptable trigger rate from 1 to 50kHz for Heavy Ion operation
– New front-end readout link– TPC continuous readout
➥ LHCb: Elimination of hardware trigger (readout rate 40 MHz)– Readout front-end electronics for every bunch crossing
• New front-end electronics• Zero suppression on/near detector
– Network/Farm capacity increase by factor 40 (3.2 TB/s, ~4000 CPUs)– Network technology: Infiniband or 10/40/100 Gb Ethernet– No architectural changes
➢ Timescale 2022 and beyond➥ CMS&ATLAS: implementation of a HW track trigger running at 40 MHz and surely
many other changes…18NSS-MIC Anaheim 31 October 2012