Anders Loof - Design

Post on 08-Sep-2014

428 views 0 download

Tags:

description

Projects

transcript

Project ManagementCoordination & LiaisonConstruction Management Design (New, Seismic, Preliminary)Proposals and TenderConcepts and Ideas

L. Anders LoofC.Eng. MICE (UK)P.E. (California, USA)Chartered Architect RIBA (UK) loof_intl@hotmail.com

Second Penang Bridge, MalaysiaICE Design Review

16.5 km Sea ViaductsPrecast SegmentalCable Stayed Bridge

Chongming Crossing, ShanghaiAlternative Tender Scheme

25 km Sea Crossing Viaducts2x Cable Stayed Bridges

Tsing Lung Bridge, Hong Kong (NC)Tower Re-Design

Suspension Bridge1418 m Main Span 

Zhouzhou Bridge, ChinaTender Schemes

2 Crossings2 Alternatives Each

Abu Dhabi 3rd Crossing, UAEFinal Design

912m Gateway BridgeP/S Box Girders onConc/Steel Tubular w/Hangers

Yuen Long Nullah Bridges, Hong KongScheme + Preliminary Design

Road Bridge w/Noise EnclosuresFootbridge w/Lifts

Carquinez Bridge, California, USAIndependent Design Check

Suspension Bridge146+730+180m

Tseung Kwan O, Hong KongScheme + Preliminary Design

Noise Enclosures~200m Full Enclosures~800m Partial Enclosures

Stockton Channel Viaduct, California, USASeismic Retrofit Design

15-span Freeway Viaductwith On/Off RampsFrictional restraint on catcher blocks after bearings fail

This is one of the 30-40 bridgesI made seismic retrofit design.

Middlebar Bridge, California, USASeismic Retrofit Design

Historic Truss BridgeStrengtheningSeismic Isolators

This is one of the 30-40 bridgesI made seismic retrofit design.

Camino Del Rey Bridge, California, USAArchitectural Final Design