Kletzsch Park Dam Access, Repair & Fish Passage ProjectMilwaukee River
Artist Rendition Perspective of Bypass Channel from Downstream Overlook
Illustration by: LVBrown Studio LLC
Kletzsch Park Dam Access, Repair & Fish Passage ProjectMilwaukee River
Byass Channel Sections
Cross Section 3/4: Bypass ChannelCross Section 2/4: Bypass Channel
33 ft. ±
CBypass
Channel
Ridg
elin
e of
Ber
m
Milwaukee River
N. M
ilwau
kee R
iver
Pa
rkw
ay
100 Year Flood Surface
Normal Pool Elevation
Water surface
Proposed retaining wall & guard rail
Existing gradeTrail
Existi
ng c
urb
edge
Real
igne
d cu
rb e
dge
L
42 ft. ± 17 ft. ±
10 ft. ± 5 ft.
18 ft. ±
8 ft. ±
21 2.5
1
CBypass
Channel
Ridg
elin
e of
Ber
m
Milwaukee River
N. M
ilwau
kee R
iver
Par
kway
100 Year Flood Surface
Normal Pool Elev.
Water surface
Existing grade
Planted oaks (Mature height)
Trail
Existi
ng c
urb
edge
Real
igne
d cu
rb e
dge
L
15 ft. ±
10 ft. ± 5 ft.
18 ft. ±
8 ft. ±
21
2.51
0 10 20 ft. 0 10 20 ft.