1
Asia PacificFlight Procedure
Programme
AAsia sia PPacificacific
FFlight light PProcedurerocedure
PProgrammerogramme
David VanNess
ICAO Flight Procedure Programme Manager
2
Our LogoOur LogoOur Logo
3
ContentsContents
Part I
FPP update
Future plans
Immediate plans
Part II
FPP office
Training
Part IPart I
FPP updateFPP update
Future plansFuture plans
Immediate plansImmediate plans
Part IIPart II
FPP officeFPP office
TrainingTraining
4
Since PBN TF/5 (1)Since PBN TF/5 (1)
State Letter inviting States to express their intent to participate in the FPP
�Sent 26 June 2009. follow-up sent 29 July 2009
�8 responses – 6 Yes/2 No
�Australia proposal for funding FPP budget
APANPIRG/20 (7-11 Sept 2009)
�Side meeting with States that intend to participate
�Briefed delay in establishment of FPP
�Discussed and decided to go with the “Australia”proposal
State Letter inviting States to express their intent to State Letter inviting States to express their intent to
participate in the FPPparticipate in the FPP
��Sent 26 June 2009. followSent 26 June 2009. follow--up sent 29 July 2009up sent 29 July 2009
�� 8 responses 8 responses –– 6 Yes/2 No6 Yes/2 No
��Australia proposal for funding FPP budgetAustralia proposal for funding FPP budget
APANPIRG/20 (7APANPIRG/20 (7--11 Sept 2009)11 Sept 2009)
��Side meeting with States that intend to participateSide meeting with States that intend to participate
��Briefed delay in establishment of FPPBriefed delay in establishment of FPP
��Discussed and decided to go with the Discussed and decided to go with the ““AustraliaAustralia””
proposalproposal
5
Australia proposalAustralia proposal
Core group of APAC States fund FPP budget –“Active Participating States”
All States in region could use “free” services of FPP – “User States”
Additional “fee” services on a cost recovery basis
Steering Committee composed of funding States
�Develop work plan in coordination with FPP Manager
�Prioritize work
�Consider safety priorities
Core group of APAC States fund FPP budget Core group of APAC States fund FPP budget ––
““Active Participating StatesActive Participating States””
All States in region could use All States in region could use ““freefree”” services of services of
FPP FPP –– ““User StatesUser States””
Additional Additional ““feefee”” services on a cost recovery basisservices on a cost recovery basis
Steering Committee composed of funding StatesSteering Committee composed of funding States
��Develop work plan in coordination with FPP ManagerDevelop work plan in coordination with FPP Manager
��Prioritize workPrioritize work
��Consider safety prioritiesConsider safety priorities
6
What will it cost?What will it cost?
3-year tentative budget $514,600
�Cost for each State normally depends on how
many States participate as part of “Core
Group”
�To allow States to plan, the initial 1st-year
contribution set at:
$16,000
33--year tentative budget $514,600year tentative budget $514,600
��Cost for each State normally depends on how Cost for each State normally depends on how
many States participate as part of many States participate as part of ““Core Core
GroupGroup””
��To allow States to plan, the initial 1To allow States to plan, the initial 1stst--year year
contribution set at: contribution set at:
$16,000$16,000
7
Advantages of being a Core Group“Active Participating State”
Advantages of being a Core Group“Active Participating State”
Membership in Steering Committee
Voice in work plans of FPP
Voice in priorities
Contribute to Flight Safety in the region
States can still join the FPP at any time!
Either as User or Active Participating State
Membership in Steering CommitteeMembership in Steering Committee
Voice in work plans of FPPVoice in work plans of FPP
Voice in prioritiesVoice in priorities
Contribute to Contribute to Flight SafetyFlight Safety in the regionin the region
States can still join the FPP at any time!States can still join the FPP at any time!
Either as User or Active Participating StateEither as User or Active Participating State
8
Contributions to FPPContributions to FPP
Significant off-budget resources being provided:
China: 5 people, office, equipment
U.S. FAA: funding FPP Manager position
French DGAC/ENAC: FPD Software and training
Airbus: Other start-up costs associated with FPD software implementation
Hong Kong CAD: 1 procedure design instructor
Jeppesen providing aeronautical data
Other offers of in-kind or cash contributions
Significant offSignificant off--budget resources being provided:budget resources being provided:
China: 5 people, office, equipmentChina: 5 people, office, equipment
U.S. FAA: funding FPP Manager positionU.S. FAA: funding FPP Manager position
French DGAC/ENAC: FPD Software and trainingFrench DGAC/ENAC: FPD Software and training
Airbus: Other startAirbus: Other start--up costs associated with FPD up costs associated with FPD
software implementationsoftware implementation
Hong Kong CAD: 1 procedure design instructorHong Kong CAD: 1 procedure design instructor
Jeppesen providing aeronautical dataJeppesen providing aeronautical data
Other offers of inOther offers of in--kind or cash contributionskind or cash contributions
9
“Free” services“Free” services
Assist State procedure designers in developing their procedures
Assist State with Quality Assurance (QA)
Provide OJT to procedure designers
Provide formal training as required
As part of the services provided above, the Programme would:
Provide States access to server-based procedure design software applications
Provide States access to server-based electronic terrain and obstacle data storage
Provide packed procedures for a limited choice of avionics, for use during the pre-publication ground and flight validation
Assist State procedure designers in developing their proceduresAssist State procedure designers in developing their procedures
Assist State with Quality Assurance (QA)Assist State with Quality Assurance (QA)
Provide OJT to procedure designersProvide OJT to procedure designers
Provide formal training as requiredProvide formal training as required
As part of the services provided above, the Programme would:As part of the services provided above, the Programme would:
Provide States access to serverProvide States access to server--based procedure design based procedure design
software applicationssoftware applications
Provide States access to serverProvide States access to server--based electronic terrain and based electronic terrain and
obstacle data storageobstacle data storage
Provide packed procedures for a limited choice of avionics, for Provide packed procedures for a limited choice of avionics, for
use during the preuse during the pre--publication ground and flight validationpublication ground and flight validation
10
“Fee” services“Fee” services
Develop procedures for States
Provide QA
Assist with ground and flight validation
Assist with data origination
Develop procedures for StatesDevelop procedures for States
Provide QAProvide QA
Assist with ground and flight validationAssist with ground and flight validation
Assist with data originationAssist with data origination
11
Since PBN TF/5 (2)Since PBN TF/5 (2)
46th DGCA (12-16 Oct 2009)
�Briefed DGs on the FPP
�Revised budget
�Fixed contribution at $16,000
State Letter invited States to join the FPP (Nov 2009)
�14 responses so far
�8 Active Participating States
�5 User States
�1 negative response
4646thth DGCA (12DGCA (12--16 Oct 2009)16 Oct 2009)
��Briefed DGs on the FPPBriefed DGs on the FPP
��Revised budgetRevised budget
�� Fixed contribution at $16,000Fixed contribution at $16,000
State Letter invited States to join the FPP (Nov 2009)State Letter invited States to join the FPP (Nov 2009)
�� 14 responses so far14 responses so far
�� 8 Active Participating States8 Active Participating States
�� 5 User States5 User States
�� 1 negative response1 negative response
12
Active Participating States/Administrations
Active Participating States/Administrations
China
Hong Kong, China
Macau, China
French Polynesia (France)
ROK
DPRK
Mongolia
Singapore
ChinaChina
Hong Kong, ChinaHong Kong, China
Macau, ChinaMacau, China
French Polynesia (France)French Polynesia (France)
ROKROK
DPRKDPRK
MongoliaMongolia
SingaporeSingapore
13
User StatesUser States
Bangladesh
Cambodia
Malaysia
Myanmar
Nepal
BangladeshBangladesh
CambodiaCambodia
MalaysiaMalaysia
MyanmarMyanmar
NepalNepal
14
What can the States do now?What can the States do now?
State PBN implementation plans
Decide implementation priorities
Ensure WGS-84 survey data is available for
priority airports
Ensure terrain and obstacle data that will be
required for priority procedures is available,
preferably ETOD
State PBN implementation plansState PBN implementation plans
Decide implementation prioritiesDecide implementation priorities
Ensure WGSEnsure WGS--84 survey data is available for 84 survey data is available for
priority airportspriority airports
Ensure terrain and obstacle data that will be Ensure terrain and obstacle data that will be
required for priority procedures is available, required for priority procedures is available,
preferably ETODpreferably ETOD
15
Future PlansFuture Plans
Include entire Instrument Flight Procedure
process:
�Assist with WGS-84 survey where
necessary
�Assist with validation
Expand FPP concept to other regions
Include entire Instrument Flight Procedure Include entire Instrument Flight Procedure
process:process:
��Assist with WGSAssist with WGS--84 survey where 84 survey where
necessarynecessary
��Assist with validationAssist with validation
Expand FPP concept to other regionsExpand FPP concept to other regions
16
Immediate Plans for FPPImmediate Plans for FPP
Develop FPP processes
Develop FPP staff
Develop and offer basic and advanced training
for procedure designers
Develop FPP processesDevelop FPP processes
Develop FPP staffDevelop FPP staff
Develop and offer basic and advanced training Develop and offer basic and advanced training
for procedure designersfor procedure designers
17
Flight Procedure Programme (FPP)
Office and Training
FFlight light PProcedure rocedure PProgramme rogramme
(FPP)(FPP)
Office and TrainingOffice and Training
Mike TAMMike TAM
18
ContentContentContent
FPP Office
Training Facilities
Training Pipeline
Procedure Design Courses
Instructors’ Background
FPP OfficeFPP Office
Training FacilitiesTraining Facilities
Training PipelineTraining Pipeline
Procedure Design CoursesProcedure Design Courses
InstructorsInstructors’’ BackgroundBackground
19
FPP OfficeFPP OfficeFPP Office
Location
In the Center of Aviation Safety Technology
(CAST) Building
Chaoyang District, Northeast Corner of Third
Ring, Beijing
Mid-way between the Capital Airport and City
Centre
LocationLocation
In the In the CCenter of enter of AAviation viation SSafety afety TTechnology echnology
((CASTCAST) Building) Building
Chaoyang District, Northeast Corner of Third Chaoyang District, Northeast Corner of Third
Ring, BeijingRing, Beijing
MidMid--way between the Capital Airport and City way between the Capital Airport and City
CentreCentre
20
FPP OfficeFPP OfficeFPP Office
CCenter of enter of AAviation viation SSafety afety TTechnology (echnology (CASTCAST))
21
Training FacilitiesTraining FacilitiesTraining Facilities
In the CAST Building
Classrooms
GeoTITAN Procedure Design Software
Other suitable classroom facilities in
Beijing
In the CAST Building In the CAST Building
ClassroomsClassrooms
GeoTITAN Procedure Design SoftwareGeoTITAN Procedure Design Software
Other suitable classroom facilities in Other suitable classroom facilities in
BeijingBeijing
22
Training FacilitiesTraining FacilitiesTraining Facilities
23
Training PipelineTraining PipelineTraining Pipeline
PANS-OPS Procedure Design Initial Course
PBN Procedure Design Course
Procedure Design On-the-job Training
Advanced Courses:-RNP AR Procedure Design Course-Quality Assurance for Regulators
Frequency of the Frequency of the
Courses is based Courses is based
on on DemandDemand in the in the
Region and Region and
Available Available
ResourcesResources
24
Procedure Design CoursesProcedure Design CoursesProcedure Design Courses
PANS-OPS Procedure Design Initial Course
Basic PANS-OPS Criteria (Doc 8168)
Tentative Date: April 2010
4-5 weeks
Max 15 Students
PANSPANS--OPS Procedure Design Initial CourseOPS Procedure Design Initial Course
Basic PANSBasic PANS--OPS Criteria (Doc 8168)OPS Criteria (Doc 8168)
Tentative Date: April 2010Tentative Date: April 2010
44--5 weeks5 weeks
Max 15 StudentsMax 15 Students
25
Procedure Design CoursesProcedure Design CoursesProcedure Design Courses
PBN Procedure Design Course
Basic Concepts in PBN, RNP APCH, Baro-VNAV,
RNAV-1, Basic RNP-1
Tentative Date: Jun 2010
2-3 weeks
Max 15 Students
PBN Procedure Design CoursePBN Procedure Design Course
Basic Concepts in PBN, RNP APCH, BaroBasic Concepts in PBN, RNP APCH, Baro--VNAV, VNAV,
RNAVRNAV--1, Basic RNP1, Basic RNP--11
Tentative Date: Jun 2010Tentative Date: Jun 2010
22--3 weeks3 weeks
Max 15 StudentsMax 15 Students
26
Procedure Design CoursesProcedure Design CoursesProcedure Design Courses
Procedure Design On-the-job Training (Manual)
Performing real procedure design work
3 weeks
In the FPP Office
3 Students (Coaching Approach)
Procedure Design OnProcedure Design On--thethe--job Training (Manual)job Training (Manual)
Performing real procedure design workPerforming real procedure design work
3 weeks3 weeks
In the FPP OfficeIn the FPP Office
3 Students (Coaching Approach)3 Students (Coaching Approach)
27
Advanced Courses
RNP AR Procedure Design Course
Procedure Design Automation
Procedure Design OJT (Automated)
Quality Assurance in the Procedure Design Process
Quality Assurance for Procedure Design Service
Provider Regulators
Advanced CoursesAdvanced Courses
RNP AR Procedure Design CourseRNP AR Procedure Design Course
Procedure Design AutomationProcedure Design Automation
Procedure Design OJT (Automated)Procedure Design OJT (Automated)
Quality Assurance in the Procedure Design ProcessQuality Assurance in the Procedure Design Process
Quality Assurance for Procedure Design Service Quality Assurance for Procedure Design Service
Provider RegulatorsProvider Regulators
Procedure Design CoursesProcedure Design CoursesProcedure Design Courses
28
Procedure Design CoursesProcedure Design CoursesProcedure Design Courses
Frequency of the Courses is based on Demand in the Region and Available Resources
Prerequisite
Pre-course Assignment
Individual AssessmentProgress Test
Group Project and Presentation
Document Achievement
Training MaterialsNational Course Materials provided by the States in the region
ENAC, The French Civil Aviation University in Toulouse, France
Frequency of the Courses is based on Frequency of the Courses is based on DemandDemand in the in the Region and Region and Available ResourcesAvailable Resources
PrerequisitePrerequisite
PrePre--course Assignmentcourse Assignment
Individual AssessmentIndividual AssessmentProgress TestProgress Test
Group Project and PresentationGroup Project and Presentation
Document AchievementDocument Achievement
Training MaterialsTraining MaterialsNational Course Materials provided by the States in the regionNational Course Materials provided by the States in the region
ENAC, ENAC, The French Civil Aviation University in Toulouse, The French Civil Aviation University in Toulouse, FranceFrance
29
Instructors’ BackgroundInstructorsInstructors’’ BackgroundBackground
Pool of Instructors from China, HK China, India and Pakistan
All are experienced Procedure Designers and most have
previous Procedure Design Instructor experience
Completed a series of instructor training in the PBN
Procedure Design Instructor Course organised by ENAC in
August 2009
Strong background in terms of Procedure Design Knowledge
and Teaching
Guest Instructors from the region, U.S., Europe etc.
Pool of Instructors from China, HK China, India and PakistanPool of Instructors from China, HK China, India and Pakistan
All are All are experienced Procedure Designersexperienced Procedure Designers and most have and most have
previous previous Procedure Design InstructorProcedure Design Instructor experienceexperience
Completed a series of instructor training in the PBN Completed a series of instructor training in the PBN
Procedure Design Instructor Course organised by ENAC in Procedure Design Instructor Course organised by ENAC in
August 2009August 2009
Strong background in terms of Strong background in terms of Procedure Design KnowledgeProcedure Design Knowledge
and and TeachingTeaching
Guest Instructors from the region, U.S., Europe etc.Guest Instructors from the region, U.S., Europe etc.
30
Thank You