Asphalt Deterioration ProcessPresented By
Road Works Inc.
PAVEMENT
SUB-BASE
THERMAL STRESS
AIR 100°
135°
100°
Asphalt Deterioration ProcessPresented By
Road Works Inc.
THERMAL STRESS
AIR
PAVEMENT
SUB-BASE
Asphalt Deterioration ProcessPresented By
Road Works Inc.
WATER PENETRATION
SUB-BASE SOFTENING
WATER
Asphalt Deterioration ProcessPresented By
Road Works Inc.
LOAD
WATER JET DIRECTION
Asphalt Deterioration ProcessPresented By
Road Works Inc.
WATER JET DIRECTION
LOAD
Asphalt Deterioration ProcessPresented By
Road Works Inc.
STRESS POINTS
FIRM BASE
SOFT BASE
VOID
Asphalt Deterioration ProcessPresented By
Road Works Inc.
RAPID DETERIORATIONBEGINS
Asphalt Deterioration ProcessPresented By
Road Works Inc.
CRACK SEALAT STAGE 2.
Asphalt Deterioration ProcessPresented By
Road Works Inc.
ROADWORKS #306HOT RUBBER SEALANT