German District Heating Delegation
18-20 November 2014
ATES at Grundfos A/S Bjerringbro
Stig Niemi SørensenEnopsol ApS
WWW.ENOPSOL.COM
ATES at Grundfos A/S BjerringbroEnergy budget with ATES. Summer mode
ATES
COOLING
DISTRUBUTION
SYSTEM
100 HEATING
DISTRUBUTION
SYSTEM
100 DISTRICT
HEATING
100
WWW.ENOPSOL.COM
ATES at Grundfos A/S BjerringbroEnergy budget with ATES. Winter mode
HEAT
PUMP
20
ATES
80
HEAT
PUMP
25
COOLING
DISTRUBUTION
SYSTEM
100 HEATING
DISTRUBUTION
SYSTEM
100 DISTRICT
HEATING
125
SummerSummerSummerSummer
Cooling the factory by
groundwater and storage of
heat in ATES
ATES at Grundfos A/S Bjerringbro
System
VB KBVB KB
SUMMER
Cold groundwater from ATES is
used to cool the factory and heat is
stored in ATESVV1 VV2
ATES
© Enopsol ApS
WinterWinterWinterWinter
Heat from ATES is
recovered and upgrated to
district heating temperature
by heat pumps. The heat
pumps produce
simultaneously cooling
water to the factory and
cold is stored in ATES
ATES at Grundfos A/S Bjerringbro
System
WW CWWW CW
GTHP1
WINTER
Heat from ATES and cooling heat
from the factory are used to
produce both cooling water to the
factory and heat to the local district
network by geothermal heat
pumps.HE1 HE2
ATES
GTHP2
© Enopsol ApS
FACTORY
Storage capacity 5200 MWh/y
Cooling load 1.5- 2 MW
Groundwater total 1.4 mio. m3/y
Reservoir volume 4.6 mio. m3
Groundwater peak 160 m3/h
Electricity savings (cc) 1160 MWh/y
Electricity consumptions (hp) 1440 MWh
Ngas savings 470.000 m3n/y
ATES at Grundfos A/S Bjerringbro
ATES key figures
References
Virksomhed Effekt
kW
Biogen Idec 2500
Novo Nordisk, Hillerød 2700
Grundfos A/S & Bjerringbro Varmeværk 1500
CPH Københavns Lufthavne 5000
Gartneriet Hjortebjerg 1160
SEB Rambøll Head Quarter 1000
Widex A/S 2800
Sundhedshuset Horsens 350
DEIF A/S 450
Kunststof Kemi A/S 700
DBI Plastics A/S 1625
AKV Langholt A/S 3900
Faerch Plast A/S 2650
Billund Lufthavn A/S 2400
Superfos A/S 1000
Chr. Hansen A/S 3700
Naviair 750
Crown Plaza Hotel Ørestad 4000
SDU, Kolding 450
WWW.ENOPSOL.COM