www.nmobe.com
V1 • Low-cost refurbishment
• Top design
• Middle quality
Refurbishment (fully new apartment 55m2)
www.nmobe.com
• Living-room (NEW)
• Kitchen (NEW)
• Bathroom1 (NEW)
• Master Bedroom (NEW)
• Terrace (NEW)
• New electricity + lighting installation
• New plumbery installation
• (according to the new rules of CTE)
• Architectural project (approx. working-time 1,5months)
after
Living-room (TV)
Kitchen
BEFORE
after
Kitchen (open)
bedroom
BEFORE
after
Master bed-room
terrace
BEFORE
after
terrace
after
Terrace (lighting)
after
terrace
Sliding door
BEFORE
after
Sliding door (wood-wall)
bathroom
BEFORE
after
bathroom
Summary (fully new apartment 55m2)
• Living-room (wood wall) (NEW) 3.500€
• Kitchen (NEW) 8.000€
• Bathroom1 (NEW) 4.000€
• Master Bedroom 4.000€
• Terrace (NEW) 4.500€
Ratio 436€/m2
Total amount (iva. not included) 24.000€
www.nmobe.com
V2
• Middle-cost refurbishment
• Top design
• Middle-high quality
• Living-room (NEW)
• Kitchen (NEW)
• Bathroom1 (NEW)
• Bathroom2 (NEW)
• Master Bedroom
• Guest Bedroom
• Terrace (glass courtain) (NEW)
• New electricity + lighting installation
• New plumbery installation
• (according to the new rules of CTE)
• Architectural project (approx. working-time 2months)
www.nmobe.com
Refurbishment (fully new apartment 70m2)
Living-room (dark and narrow)
BEFORE
after
Living-room (light + space)
Terrace
BEFORE
after
Terrace (bar + glass curtain + lighting)
Master Bedroom
BEFORE
after
Master Bedroom integrated in the living-room
Kitchen
BEFORE
after
Kitchen (natural light + space)
Moldure - corridor
BEFORE
after
Not corridors – not moldures
Bathroom
BEFORE
after
Bathroom
Living-room (TV)
BEFORE
after
Living-room (TV)
Summary (fully new apartment 70m2)
• Living-room (NEW) 9.000€
• Kitchen (NEW) 9.000€
• Bathroom1 (NEW) 6.000€
• Bathroom2 (NEW) 6.000€
• Master Bedroom 5.000€
• Guest Bedroom 5.000€
• Terrace (glass courtain) (NEW) 8.500€
Ratio 693€/m2
Total amount (iva. not included) 48.500€
www.nmobe.com
V3 • Middle-High cost refurbishment
• Top design
• Middle-high quality
Refurbishment (fully new house 250m2)
www.nmobe.com
• Living-room (NEW)
• Kitchen (NEW)
• Bathrooms (4x) (NEW)
• Master Bedroom (NEW)
• Guest Bedroom (3x) (NEW)
• Terraces (2x) (NEW)
• New electricity + lighting installation
• New plumbery installation
• (according to the new rules of CTE)
• Architectural project (approx. working-time 3,5months)
Living-room (fireplace)
BEFORE
after
Living-room (fireplace)
after
Living-room (fireplace)
terrace
BEFORE
after
terrace
after
terrace
After
terrace
bathroom
BEFORE
after
bathroom
kitchen
BEFORE
after
kitchen
Summary (fully new house 250m2)
• Living-room (NEW) 7.500€
• Kitchen (NEW) 11.000€
• Bathrooms (4x) (NEW) 4x5.000 20.000€
• Master Bedroom 3.500€
• Guest Bedroom s (3x) 3x3.000 9.000€
• Terraces (2x) (NEW) 2x3.500 7.000€
• Garden project 11.000€
Ratio 276€/m2
Total amount (iva. not included) 69.000€
www.nmobe.com
V4 • Middle-High cost refurbishment
• Top design
• Middle-high quality
entrance
BEFORE
after
Swimming pool
after
Swimming pool
after
Entrance
after
entrance
after
Living-room (TV)
after
Entrance hall
after
Upper terrace
after
Chill-out lounge
after
Façade
Summary (fully new refurbished house 300m2)
• Living-room (NEW) 10.000€
• Kitchen (NEW) 19.000€
• Bathrooms (4x) (NEW) 4x5.000 20.000€
• Master Bedroom 15.000€
• Guest Bedroom s (3x) 3x5.000 15.000€
• Terraces (2x) (NEW) 2x3.500 7.000€
• Garden project 15.000€
• Pool 10.000€
• Carpark 15.000€
Ratio 276€/m2
Total amount (iva. not included) 190.000€
www.nmobe.com
www.nmobe.com
Enjoy your new home