Berwickshire High School
Presentation compiled 15th October 2009
Why a new school?
Poor condition of existing building.
Restricted circulation space
Outdated Facilities
A glimpse of the future.
Lower Ground Floor
Ground Floor
First Floor
Security
Limited control
Tight control
Main Entrance
Observation
Improved facilities
Reduce Queues
A range of seating
Vending Machines
Drinking Water in every wing.
Vending Machines
Gymnasium with mirrored wall for dance
Fitness Room
Floodlit Synthetic Pitch
Various recreational areas
Environmentally Friendly
Cleanliness & Maintenance
Circulation Space
Recreational Areas
Photographic history of the build
The site before work commences - October 2006
Preparation for the workers village – October 2006
Ground conditioning – November 2006
Bases for the rear wings take shape – December 2006
Testing
Pile driving starts – January 2007
Shuttering and concrete pouring – February 2007
Steel erection commences – March 2007
Rapid progress – April 2007
Stairs & roofs – May 2007
Internal details start to appear – June 2007
July 2007
August 2007
March 2008
May 2008
June 2008
August 2008
September 2008
October 2008
November 2008
GALLERY
12th February 2009
Entrance
Wayfinder
Departmental Signage
Corridors
Flexible Teaching Area
Art & Design
Science
Home Economics
Assembly Hall
Changing
Boys Toilets
Staff Room
Staff Base/Store
Hot off the press!