Bill Keenen Professional Project Portfolio

Photographs

Vista Ridge Mall Phase II160,000 SF Addition for Homart Development. Completed on time & within budget.

Foley’s @ Vista Ridge180,000 SF Anchor Department Store for the Vista Ridge Phase II Mall Expansion Built for the May Company.

AMI Fab 10Class 1 Ballroom Style Microelectronics Cleanroom with a Clear Span of 181 LF.

AMI Fab 10Class 10 Clean Interconnect Corridor between Existing Fab 9 & the New Fab 10 that saves time in the movement of people between the Fabs by eliminating unnecessary smock changes.

AMI Fab 10 Bulk Gas Back Pad for the Generation of High Purity Nitrogen. It also supports the Fab with other necessary Bulk Gases such as Oxygen & Argon.

AMI Fab 10Pressurized Plenum Utilizing Custom Recirculation Air Handling Units Producing 30,000 CFM of HEPA Filtered Air Directed to the Production Area Below.

AMI Fab 10A View of the Sub-Fab Piping Racks and Electrical Bus Looking up to the Production Floor from the Sub-Fab below.

AMI Fab 10 – Beta Tool SetInitial Production Process Tool Set. Installed proximate to an Emergency Eyewash Station. Notice the Amber Lenses in the Photolithography Area.

HISUS A/O Building45,000 SF 3 Story Structural Steel Frame with Granite Clad GFRC Panels. Included 8000 SF Class 100 Wafer Test Clean Room.

HISUS A/O BuildingBook Matched Marble on the Reception Desk. Polished Stainless Steel Stair with Radius Glass.

HISUS Clean Room Remodel – Bay & ChaseClass 100 Process Equipment Chase prior to the Process Tool Installation.

HISUS Clean Room Remodel – Bay & ChaseClass 10 Production Bay prior to Tool Installation with Integral Ionization System in the HEPA Ceilings.

HISUS U4 – Construction Progress PhotoBreaking Ground and Excavation Begins.

HISUS U4 – Construction Progress PhotoPiers Drilling, Vertical Formwork, and Shear Wall Placement in the Crawl Space.

HISUS U4 – Construction Progress PhotoVertical Formwork coming out of the Ground from the Piers through the Crawl Space up to the Subfab Floor Elevation.

HISUS U4 – Construction Progress PhotoConcrete Placement and Finishing of the Waffle Slab while Formwork is Progressing in the Service Areas and the Scaffold Shores are being Erected.

HISUS U4 – Construction Progress PhotoConcrete Shear Wall Construction and Vertical Concrete Placement from the Crawl Space through to the Subfab Elevation.

HISUS U4 – Construction Progress PhotoConcrete Slab Placement for the Support Services like Chemical Distribution Rooms and Specialty Gas Distribution Rooms.

HISUS U4 – Construction Progress PhotoClear Span Truss Erection Continues. The Waffle Slab Elevation is Decked in Protective Plywood while the Subfab elevation is Visible Below.

HISUS U4 – Construction Progress PhotoStructural Steel Erection Continues with the Truss Members Being Staged on the next Waffle Slab. MAHU Ductwork Installation is Installed.

HISUS U4 – Construction Progress PhotoStructural Steel Installation Secondary Framing Progressing while Roof Decking is being Installed Above and MAHU Ductwork is Being Installed within the Truss.

HISUS U4 – Construction Progress PhotoView From the Waffle Slab Elevation up to the Clear Span Trusses and MAHU Air Handler Deck.

HISUS U4 – Construction Progress PhotoConstruction of the Masonry 4 Hour Fire Separation Walls that also Create the Return Air Chase from the Subfab Return Air Grill to the Fan Filter Plenum Deck.

HISUS U4 - Substation138 KV Dual Feed Substation on Site Dedicated for the support of Hitachi Semiconductor Plant Operations with Architectural Screen Wall and Lightning Protection Systems.

HISUS U4 – Electrical RoomElectrical Distribution at Medium Voltage 13.8 KV with Redundant Service Feeders & Uninterruptable Power Supply for Critical Systems.

HISUS U4 – Fab Level BallroomFab Level Ballroom with Fan Filter Unit Plenum Ceiling with Integrated Lights and Ionization Systems. Nickel Chrome Plated 2’ x 2’ Grated Floor Panels.

HISUS U4 – Support AreaClass 100 Wafer Test Area with 2’ x 2’ Static Dissipative Raised Floor System.

HISUS U4 – Sub-FabSub-Fab View Looking up at the Gold Guard Unistrut Rack System Supporting the Process Piping Systems and Stainless Exhaust Ductwork. Chemical Resistant Floor Coatings with Containment Curbs at each Column Sealing the Isolation Joints.

HISUS U4 – Central PlantPlant Chiller Capacity 7000 TonsVibration Isolation on all Rotating EquipmentAdvanced Building Automation System

HISUS U4 – D.I. Water PlantD.I. Water Plant Producing 18 Mega-Ohm Water with a UDI Water Pretreatment System.

HISUS U4 – Central PlantCentral Plant Service Aisle to Service and Pull the Chiller Tubes. Notice the Vibration Isolation Inertia Bases on the rotating Equipment.

HISUS U4 – Fan Filter DeckBill Keenen Fully Gowned and Inspecting the Clean Air Plenum utilizing the Fan Filter Unit Walkable Deck.

SRX ProjectOffice Warehouse Manufacturing Facility with 2nd Floor Mezzanine. Tilt Wall Panels with full Face Brick Façade Poured Face Down with ¾” Reveals on a 2’x2’ Grid.

Clarke Checks40,000 SF Build to Suit Office, Warehouse, and Checking Printing Facility. Mezzanine Office Areas with 3 Story Entrance, Brick Paver Accent Band on Exposed Aggregate Panels.

Northgate Phase II – Building 15Brick and Tilt-Wall Building with Low Clear Height and Dock High Rear Entry. Face Brick Façade Radius Columns over Concrete Columns with Steel Lintels for the Brick and Block Above.

Summit Business Park – Plano TX – Building 5104,000 SF High Bay Tilt-Wall Warehouse with Face Down Panels and Labrado Ribbed Texture.

Summit Business Park – Plano TX – Building 2Buildings 1 – 4 were single story low clear height which were opposite hand mirror images of one another. Face Down Panels with Labrado Ribbed Texture.