BIM Implementation€¦ · CIC bsi Core Level 2 BIM Components What is BIM? BIM Soft Landings...

Post on 31-Dec-2020

24 views 0 download

transcript

5 February 2015

BIM Implementation South BIM Hub

Richard Lane

UK BIM Task Group & Creonova Consulting Limited

Introduction Richard Lane

• Project Management

• Consulting

• Change Management

• Education & Training

• Technology

Disclaimer

The views and opinions expressed in this presentation are those of the author and do not necessarily reflect the official policy or position of any agency of the UK government.

What is BIM? Building a consistent, collaborative industry, with

clear and open communication

Information of high-quality is procured to

support business outcomes

Modelling the design increases efficiency,

enabling simulation & analysis

What is BIM?

‘Soft Skills’

Technology Process

Organisational Change

What is BIM?

Which comes first?

What is BIM?

What is BIM?

PAS1192-3:2014

PAS1192-2:2013

Asset Management (using PAS 55)

PAS1192-2:2013

What is BIM?

PAS 1192-3 Asset

PAS 1192-2 Project

Models Requirements

Essential components to develop the models

• Initiation

• Discovery

• Process

• Commercial

• Technical

• Training & Communications

• Project Interventions

How?

10 Tests Valuable

The overall aim is to maximise client value by increasing benefits at little or no extra cost.

Understandable

The approach is to be presented in an understandable learning package suitable for different types of government asset procurers.

Generally Applicable

The approach is equally applicable to buildings and infrastructure, whether large and small new build and where possible existing structures.

Non-proprietary

All requirements are non-proprietary as to applications and as to the required formats of the deliverables.

Competitive

Wherever possible there are at least two solutions or methods available so as to minimise market influence in terms of anti competitive clauses.

Open

Wherever possible, low-cost methods are to be made available to allow all stakeholders to participate, irrespective of size and experience, so as to minimise barriers to involvement.

Verifiable

All contractual expectations are documented with transparent and testable measurement of pass / fail.

Compliant

Measurement of LC/Carbon/Sustainability/etc is published to GB, EU and ISO standards.

Implementable

The approach is self funding by the client and the industry

Timescale

The approach is phased in over 5 years.

Training Process & Methodology

Technology & Data

36 applications from 18 design software companies

LOF

Key Lessons Avoid Unnecessary Information

BIM TASK GROUP UPDATE

“Have we created the conditions for sustainable, ongoing, transformation?”

Local Government Nuclear HS2

LOF

dPOW

Community

Be mindful of ‘future BIM’. But focus on Level 2

Resources

www.bimtaskgroup.org

@BIMgcs

@richardlane

richard@creonova.co.uk