Post on 15-Feb-2017
transcript
•
•
•
•–
–
–
–
–
www.excelize.com | info@excelize.com
www.excelize.com | info@excelize.com
•
•
•
•
www.excelize.com | info@excelize.com
www.excelize.com | info@excelize.com
•
•
•
www.excelize.com | info@excelize.com
www.excelize.com | info@excelize.com
www.excelize.com | info@excelize.com
CAD Drawings
Clash Report
FM & OM Information
BIM
Setup
BIM
Modeling
Clash detection &
Resolution
Coordinated
BIM Model
As-built
Model
Change Management &
Constructability Analysis
Construction
Model
RFI, Change order management, BOQs
Shop drawings & fabrication info
Visualization, Drawings, BOQs
•
–
–
–
–
www.excelize.com | info@excelize.com
www.excelize.com | info@excelize.com
www.excelize.com | info@excelize.com
Programming
Conceptual
Design
Detailed Design Analysis
Documentation
Fabrication
Construction
4D/5D
Construction
Logistics
Operation and
MaintenanceDemolition
Renovation
Building Information
Modeling
•
•
–
–
–
•
www.excelize.com | info@excelize.com
•
•
•
•
•
•
•
•
•
www.excelize.com | info@excelize.com
www.excelize.com | info@excelize.com
•
•–
–
–
•
•
•Source: http://www.bimjournal.com/2009/12/the-dubai-mall-case-study/
www.excelize.com | info@excelize.com
www.excelize.com | info@excelize.com
Example just for reference not related to the case study.
www.excelize.com | info@excelize.com
Trying to achieve your construction goals Through BIM Implementation?
CREATED BY
Sonali Dhopte
Architect and Interior Designer since 1993, Sonali has
worked with the top architectural firms in the US and
India. As Technical Director at Excelize
(www.excelize.com), she overseas and guides the BIM
technology team and manages project deliveries as per client
requirements.
INTERACT WITH ME ON TWITTER
@sonalidhopte
www.excelize.com | info@excelize.com