Consolidated Authority Data

2

Current Staff Level • 165 Full Time Employees

Annual Workload • 75,000 permits/year • 200,000 inspections/year • 350,000 customer service events

3

CONTRACTOR PASS RATES

Contractor Pass Rate

AE Pass Rate

Mecklenburg Technology

Development Timeline

4

Electronic Plan Submittal – Electronic Plan Review (EPS-EPR)

Five Year Development Strategy

5

6

28,550 sq. ft one story

emergency department pavilion with new parking deck bay above the emergency department

‘B’ occupancy for emergency department and ‘S-2’ for parking garage

Construction type II-A; fully sprinklered

Schedule: Early site work commenced; foundation work start in February

CMC – MORROCROFT PAVILION

7

CMC – MORROCROFT PAVILION

8

79,471 sq. ft.

behavioral health facility, two story slab on grade; 66 beds plus outpatient component and supporting food service

‘I-2’ occupancy; construction type I-B; fully sprinklered

Schedule: site clearing and construction to start by the end of February

CMC – BEHAVIORAL HEALTH IN

DAVIDSON

9

CMC – BEHAVIORAL HEALTH IN

DAVIDSON

Construction vs. Manufacturing Productivity

10

Growth in the use of BIM

11

12

12

13

13

14

14

16

Current Org. Chart

Team Based

Org. Chart

17

Team based service delivery on the commercial side with earlier involvement of plan review and inspections.

Changes in Commercial Construction Delivery

18

19

• Joint submittal by City of Raleigh & Mecklenburg

• Six months of work by 19 person stakeholders group

• Group Focus • Find a simple process fix • Emphasis on code compliant end product

• Approved by the BCC on August 22, 2011

BIM-IDP Administrative Code Change

Proposal to NC Building Code Council

20

BIM-IDP Administrative Code Change

Proposal to NC Building Code Council

• Identified BIM-IPD as different service delivery method • Specific definitions for BIM and IPD • Provides option to conventional dbb permitting process, using a

three step process • Emphasis on voluntary option • Commentary specifics

• AHJ to work collaboratively on the project • Applies to projects with 3d modeling & collaborative delivery

21

TEAM PLAN REVIEW (TPR)

As process off spring of…

Subject to approval by Code Enforcement Directors Now available on BIM-IPD Projects

22

How Team Plan Review Works

• Owner e-mails interest to management /Directors

• Preliminary meeting, with specific goals of: a) Agreement TPR benefits project b) Agreement field inspector can manage the work or get

backup c) Rough estimate of hours required and cost d) Letter of understanding signed by the owner and

Department.

• If go ahead, owners team uses Inspection by Appointment (IBA) to schedule inspectors time.