Post on 13-May-2015
description
transcript
Mike Putnam President and CEO, Skanska UK
Journey to Deep Green™
2
The world is changing
•
Introduction
•
Green Construction Board
•
The Skanska approach
•
The business case for green buildings
•
Examples
•
Thoughts and tips
USA
Brazil
Argentina
Chile
Peru
Venezuela
Colombia
Sweden
FinlandNorway
DenmarkUnited Kingdom Poland
SlovakiaRomania
Czech Republic
Estonia
Hungary
3
Introduction to Skanska
•Founded 1887 in Sweden – celebrating 125 years!
•International business since 1897
•Listed on the Stockholm Stock Exchange
•2012 revenues: £13 billion
•10,000 ongoing projects
•53,000 employees
•A Fortune 500 company
•Member of UN Global Compact
How serious a problem do you think climate change is today?
How serious a problem do you think climate change is today?
1 = not serious at all
10 = extremely serious
1 = not serious at all
10 = extremely serious
Source: Special Eurobarometer 300, Special Eurobarometer 372Source: Special Eurobarometer 300, Special Eurobarometer 372
5.05.0
6.06.0
7.07.0
8.08.0
9.09.0
20082008 20112011
CZ
PL
SE
UK
SkanskaSkanska
Changing behaviours Changing behaviours –– itit’’s hard to do!s hard to do!
We do a lot We do a lot up hereup here (financial, social, ecological)(financial, social, ecological)
(behaviours, policies, (behaviours, policies, procedures, technologies)procedures, technologies)
(values, ideas, assumptions)(values, ideas, assumptions)
(past and present)(past and present)
Results
Actions
Beliefs
Experiences
6
Rt Hon Michael Fallon MP Rt Hon Michael Fallon MP
Minister of State Minister of State
Business and EnterpriseBusiness and Enterprise
Mike Putnam Mike Putnam
President & CEOPresident & CEO
Skanska UKSkanska UK
The Green Construction BoardThe Green Construction Board
Structure and Membership
The Green Construction BoardThe Green Construction Board
The Working Groups
Green Construction BoardGreen Construction Board
BuildingsBuildings InfrastructureInfrastructure
RoutemapRoutemap
Knowledge and SkillsKnowledge and Skills
Valuation Valuation andand
DemandDemand Greening the IndustryGreening the Industry
PromotionsPromotions
Low Carbon Routemap
The Green Construction BoardThe Green Construction Board
Closing the Performance Gap
The Green Construction BoardThe Green Construction Board
Fundamental Truths of Low Carbon Design
The Green Construction BoardThe Green Construction Board
Johan Karlström, President and CEO
Skanska AB
Skanska's vision
“Skanska is determined to be the leading green project developer and contractor”
Skanska’ssustainabilityagenda
SocialAgenda
Humanresources
Business ethics
Local impactsCarbon
Project selection Supply chain Value added
Energy Water
EconomicAgenda
Skanska’s sustainability agenda
Materials
Skanska Color Palette TM
EnvironmentalAgenda
Health and
safety
Community involvement
14
Skanska’s global green strategic indicators (GSI)
Brand Leadership
Competency Colour
15
Engaging our people for the last seven years!
Skanska Color Palette™
BREEAM project comparisons
2000 members700 action
plansFREE
Supply Chain Sustainability School
Skanska Color Palette™ launched
Our green timeline and journey so far...
1995 1997 1999 20011996 1998 2000 2002 200820072003 2004 20062005 2009 2010 2011
First construction
company fully ISO certified
Our first environmental
Report
Environment training
October 2012
2008-2010 Env KPIs and
green car policy
2011-2015 Green Strategic Indicators
#1
First BU ISO 14001 certified
Annual environment week begins
Stakeholders and value
Hollywood House, Woking
22
Savings: 44% on energy, 55% on water, 55% on carbon emissions
“By working with Skanska, PRUPIM was able to go beyond the green measures we would normally have implemented.”Nina Reid, Director, PRUPIM
“…a dramatically improved working environment…
delivered cost-effectively…”Paul King, CEO, UK Green Building Council
Väla Gård –
commercial office
24
Lustgården, commercial office, Stockholm
Energy use: 50% less than Sweden’s building code
Alternative Business ModelsClient: Anglian Water
50% reduction in embodied carbon, 20% reduction in operational carbon and 20% reduction in costs
Investing £2.3 billion
6 million customers
Carbon footprint tool for designers
Intelligent scheduling tool
26
M25 wideningM25 widening
From Norway’s first energy positive building, to wind farms in Chile
27
Conclusion –
thoughts and tips
−
Set demanding targets and lead by example
−
Benchmark against the best
−
Early engagement and collaborative working
−
Understand the big picture –
the whole life cycle
−
Minimise environmental impact –
think energy, carbon, material and water
−
Success requires behavioural change –
to think differently
−
This is a journey and takes time.
28
Personal leadership in Oxfordshire
29
30