Post on 28-Dec-2015
transcript
Broadband Infrastructure Highways Toward a Smarter Rwanda
By: Antoine SeberaA.G Chief Executive Officer
Broadband Systems Corporation Ltd
Achieved National Backbone: More than 3,000 Km of fiber
infrastructure (Kigali, Districts, 11 Boarder Posts), connected to submarine cables
High Capacity: 10 Gbps between each districts upgradable to 160 Gbps on same fiber
Connected: Government buildings/offices, universities, hospitals, schools, etc…
Future Proof: Spare capacity for future expansion, leasing to other operators
New Possibilities
• 95 % population coverage with 4G LTE in the next 3 years
• Mobile devices getting more smarter and possible price reduction
• Cloud Computing
• Rich Applications: Data, Voice & Video (Education, Health, Agriculture, Safety &Security, Commerce, Transport, Energy, etc…)
Thank You
BROADBAND SYSTEMS CORPORATION LTD (BSC)
3rd Floor, Telecom House, Boulevard de l’Umuganda, Kacyiru
P O Box 7229, Kigali, Rwanda, Email: info@bsc.rwWeb: www.bsc.rw