BTS3900 GSM
V300R008&R009
Site Maintenance Guide
Issue 02
Date 2009-09-30
Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
2/55
Huawei Technologies Co., Ltd. provides customers with comprehensive technical support and service. For any
assistance, please contact our local office or company headquarters.
Huawei Technologies Co., Ltd.
Address: Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic of China
Website: http://www.huawei.com
Email: support@huawei.com
Copyright Huawei Technologies Co., Ltd. 2009. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior written
consent of Huawei Technologies Co., Ltd.
Trademarks and Permissions
and other Huawei trademarks are the property of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective holders.
Notice
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but the statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.
Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
http://www.huawei.com/7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
3/55
Contents
About This Document.....................................................................................................................1
1 Changes in BTS3900 GSM Site Maintenance Guide..........................................................1-1
2 Preparations for Base Station Site Maintenance..................................................................2-1
3 Hardware Items of BTS3900 Routine Maintenance............................................................3-1
3.1 Maintenance Items of the Equipment Room Environment of the Base Station..............................................3-2
3.2 Power Supply and Grounding System Maintenance Items of the Base Station..............................................3-3
3.3 Maintenance of the Main Components in the Base Station............................................................................3-4
4 Powering On and Powering Off a BTS3900 Cabinet..........................................................4-1
4.1 Powering On the BTS3900.............................................................................................................................4-2
4.2 Powering Off the BTS3900.............................................................................................................................4-4
5 Replacing the BTS3900 Components.....................................................................................5-1
5.1 Replacing BBU3900 Parts..............................................................................................................................5-2
5.1.1 Replacing the BBU3900.........................................................................................................................5-2
5.1.2 Replacing the BBU Parts........................................................................................................................5-3
5.2 Replacing a DCDU-01 Module.....................................................................................................................5-12
5.3 Replacing the FAN Unit................................................................................................................................5-14
5.4 Replacing the PMU.......................................................................................................................................5-17
5.5 Replacing a PSU............................................................................................................................................5-19
5.6 Replacing the GATM....................................................................................................................................5-21
5.7 Replacing an RFU.........................................................................................................................................5-22
5.8 Replacing the BTS3900 Power Subrack.......................................................................................................5-25
BTS3900 GSM
Site Maintenance Guide Contents
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
i
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
4/55
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
5/55
Figures
Figure 5-1 Removing the protection cover.........................................................................................................5-13
Figure 5-2 Removing the screws on the two mounting ears of the module.......................................................5-13
Figure 5-3 Position of the FAN unit switch.......................................................................................................5-15
Figure 5-4 Raising the adjustable cable trough .................................................................................................5-16
Figure 5-5 Removing the FAN unit...................................................................................................................5-17
Figure 5-6 Removing the PMU..........................................................................................................................5-18
Figure 5-7 Set the DIP switch............................................................................................................................5-19
Figure 5-8 Installing the PMU............................................................................................................................5-19
Figure 5-9 Removing the PSU...........................................................................................................................5-20
Figure 5-10 Installing the PSU...........................................................................................................................5-20
Figure 5-11 Loosening the screws......................................................................................................................5-21
Figure 5-12 Removing an RFU..........................................................................................................................5-24
Figure 5-13 Removing the PMU/PSU................................................................................................................5-26
Figure 5-14 Removing the screws from the mounting ears...............................................................................5-27
BTS3900 GSM
Site Maintenance Guide Figures
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
iii
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
6/55
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
7/55
Tables
Table 3-1 Maintenance items of the equipment room environment of the base station.......................................3-2
Table 3-2 Maintenance items of the power supply and grounding system of the base station............................3-3
Table 3-3 Maintenance items of the main components in the Base Station.........................................................3-4
Table 4-1 Power switches on the DCDU..............................................................................................................4-2
Table 4-2 LED status of different parts when power supply is normal................................................................4-3
Table 4-3 Troubleshooting...................................................................................................................................4-3
BTS3900 GSM
Site Maintenance Guide Tables
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
v
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
8/55
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
9/55
About This Document
Purpose
After BTS system deployment, commercial operations are started on site. To ensure smooth
operation, you need to perform routine maintenance on the BTS.
This document describes the routine hardware maintenance items of the BTS3900. The itemsare equipment room environment maintenance, power and grounding system maintenance, and
cabinet maintenance. This document also describes the procedures for replacing parts, modules,
and boards.
Product Version
The following table lists the product version related to the document.
Product Name Product Version
BTS3900 GSM (hereinafter referred to asBTS3900)
V300R008&R009
Intended Audience
This document is intended for:
l Technical support engineers
l Maintenance engineers
Organization
1 Changes in BTS3900 GSM Site Maintenance Guide
This provides the changes in the BTS3900 GSM Site Maintenance Guide.
2 Preparations for Base Station Site Maintenance
This describes the preparations for base station site maintenance. The preparations for site
maintenance involve obtaining site information, selecting maintenance items, and arranging
maintenance tools and spare parts.
3 Hardware Items of BTS3900 Routine Maintenance
BTS3900 GSM
Site Maintenance Guide About This Document
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
1
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
10/55
This describes the routine maintenance for the hardware items in the BTS3900. The hardware
items that are routinely maintained refer to the equipment room environment of the base station,
power supply and grounding system of the base station, and main components in the BTS3900.
4 Powering On and Powering Off a BTS3900 Cabinet
This describes how to power on and power off a BTS3900 cabinet. The procedures for powering
off the BTS3900 cabinet in normal and emergency cases are different.
5 Replacing the BTS3900 Components
Replacing the BTS3900 components involves replacing the BBU components, DCDU-01, FAN
unit, PMU, PSU, GATM, RFU, and power supply subrack.
Conventions
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol Description
Indicates a hazard with a high level of risk, which if not
avoided,will result in death or serious injury.
Indicates a hazard with a medium or low level of risk, which
if not avoided, could result in minor or moderate injury.
Indicates a potentially hazardous situation, which if not
avoided,could result in equipment damage, data loss,
performance degradation, or unexpected results.
Indicates a tip that may help you solve a problem or save
time.
Provides additional information to emphasize or supplement
important points of the main text.
General Conventions
The general conventions that may be found in this document are defined as follows.
Convention Description
Times New Roman Normal paragraphs are in Times New Roman.
Boldface Names of files, directories, folders, and users are in
boldface. For example, log in as userroot.
Italic Book titles are in italics.
Courier New Examples of information displayed on the screen are in
Courier New.
About This Document
BTS3900 GSM
Site Maintenance Guide
2 Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
Issue 02 (2009-09-30)
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
11/55
Command Conventions
The command conventions that may be found in this document are defined as follows.
Convention Description
Boldface The keywords of a command line are in boldface.
Italic Command arguments are in italics.
[ ] Items (keywords or arguments) in brackets [ ] are optional.
{ x | y | ... } Optional items are grouped in braces and separated by
vertical bars. One item is selected.
[ x | y | ... ] Optional items are grouped in brackets and separated by
vertical bars. One item is selected or no item is selected.
{ x | y | ... }* Optional items are grouped in braces and separated by
vertical bars. A minimum of one item or a maximum of all
items can be selected.
[ x | y | ... ]* Optional items are grouped in brackets and separated by
vertical bars. Several items or no item can be selected.
GUI Conventions
The GUI conventions that may be found in this document are defined as follows.
Convention Description
Boldface Buttons, menus, parameters, tabs, window, and dialog titles
are in boldface. For example, clickOK.
> Multi-level menus are in boldface and separated by the ">"
signs. For example, choose File > Create > Folder .
Keyboard Operations
The keyboard operations that may be found in this document are defined as follows.
Format Description
Key Press the key. For example, press Enter and press Tab.
Key 1+Key 2 Press the keys concurrently. For example, pressing Ctrl+Alt
+A means the three keys should be pressed concurrently.
Key 1, Key 2 Press the keys in turn. For example, pressing Alt, A means
the two keys should be pressed in turn.
Mouse Operations
BTS3900 GSM
Site Maintenance Guide About This Document
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
3
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
12/55
The mouse operations that may be found in this document are defined as follows.
Action Description
Click Select and release the primary mouse button without moving
the pointer.
Double-click Press the primary mouse button twice continuously and
quickly without moving the pointer.
Drag Press and hold the primary mouse button and move the
pointer to a certain position.
About This Document
BTS3900 GSM
Site Maintenance Guide
4 Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
Issue 02 (2009-09-30)
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
13/55
1Changes in BTS3900 GSM Site MaintenanceGuide
This provides the changes in the BTS3900 GSM Site Maintenance Guide.
02(2009-09-30)
This is the first commercial release.
Compared with issue 01(2009-07-15) of V300R009, the changed parts in this release are as
follows:
l The description of replacing the GTMU is changed, refer to Replacing the GTMU.
l The description of replacing the USCU is changed, refer to Replacing the USCU.
01(2009-07-15)
This is the draft release.
BTS3900 GSM
Site Maintenance Guide 1 Changes in BTS3900 GSM Site Maintenance Guide
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
1-1
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
14/55
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
15/55
2 Preparations for Base Station SiteMaintenance
This describes the preparations for base station site maintenance. The preparations for site
maintenance involve obtaining site information, selecting maintenance items, and arranging
maintenance tools and spare parts.
Obtaining Site Information
Before you maintain the base station site, obtain the following information:
l Unsolved faults and alarms
l Hardware configurations
l Local environment
l Spare parts
Selecting Maintenance Items
Select suitable maintenance items based on actual requirements of the base station. The
maintenance items are as follows:
l Maintaining the equipment room environment of the base station
l Maintaining power supply and grounding system of the base station
l Maintaining the main components in the base station
l Maintaining the antenna system of the base station
Arranging Tools and Spare Parts
Arrange the related maintenance tools and spare parts based on the site information and
maintenance items of the base station.
The most commonly used tools for site maintenance are as follows:
l Frequency test devices comprise of spectrum analyzer, and various connectors and cables.
l
Power test devices are used to test and analyze the output power of the base station. Powermeter is a commonly used power test device.
BTS3900 GSM
Site Maintenance Guide 2 Preparations for Base Station Site Maintenance
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
2-1
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
16/55
l The antenna and feeder test devices are used to test the standing wave ratio, return loss,
and cable insertion loss, and to locate faults. The commonly used antenna and feeder test
device is the SiteMaster.
l Other devices
Multimeter
Diagnosis tools for maintenance and test devices for robustness of the base station
Local Maintenance Terminal (LMT)
Rubidium clock (used to locate the clock of the base station)
Spare parts
NOTE
When some parts are faulty and thus need to be replaced, arrange related tools and new parts for
replacement.
2 Preparations for Base Station Site Maintenance
BTS3900 GSM
Site Maintenance Guide
2-2 Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
Issue 02 (2009-09-30)
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
17/55
3Hardware Items of BTS3900 RoutineMaintenance
About This Chapter
This describes the routine maintenance for the hardware items in the BTS3900. The hardware
items that are routinely maintained refer to the equipment room environment of the base station,
power supply and grounding system of the base station, and main components in the BTS3900.
3.1 Maintenance Items of the Equipment Room Environment of the Base Station
This provides the maintenance items, maintenance intervals, operation instructions, and
reference standards of the base station equipment room environment.
3.2 Power Supply and Grounding System Maintenance Items of the Base Station
This provides the maintenance items, maintenance intervals, operation instructions, and
reference standards of the base station power supply and grounding system.
3.3 Maintenance of the Main Components in the Base Station
This describes the maintenance items, maintenance interval, operating instruction, and reference
standard of the main components in the Base Station.
BTS3900 GSM
Site Maintenance Guide 3 Hardware Items of BTS3900 Routine Maintenance
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
3-1
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
18/55
3.1 Maintenance Items of the Equipment RoomEnvironment of the Base Station
This provides the maintenance items, maintenance intervals, operation instructions, and
reference standards of the base station equipment room environment.
Table 3-1 describes how to maintain the base station equipment room environment.
Table 3-1 Maintenance items of the equipment room environment of the base station
Item Interval Operating Instruction Reference Standard
Checking
environmental
alarms
Daily Check whether power
supply alarms, fire alarms,
or smoke alarms arereported.
No power supply alarms,
fire alarms, or smoke
alarms are reported.
Checking the
temperature in
the equipment
room
Weekly Record the temperature read
on the thermometer in the
equipment room.
-20 to +50
Checking the
humidity in the
equipment
room
Weekly Record the humidity read on
the hygrometer in the
equipment room.
5% to 85%
Checking theillumination in
the equipment
room
Every twomonths
Check whether the routineand emergency illumination
in the equipment room is
normal.
-
Checking the air
conditioner
Every two
months
Check whether the air
conditioner is working
normally.
-
Checking
protective
devices
Every two
months
Check whether anti-disaster
devices, equipment
protection devices, and fire-
protection devices are in
good condition.
l The foam extinguisher or
dry powder fire
extinguisher is installed
in the equipment room.
The pressure and validity
period of the
extinguisher meet the
requirements.
l There is no danger of
damage to the equipment
by rats or insects.
3 Hardware Items of BTS3900 Routine Maintenance
BTS3900 GSM
Site Maintenance Guide
3-2 Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
Issue 02 (2009-09-30)
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
19/55
Item Interval Operating Instruction Reference Standard
Cleaning the
equipment
room
Every two
months
Check whether cabinets,
equipment housing,
equipment interior, tables,
floor, doors, and windows
are clean.
All the items to be checked
are clean.
3.2 Power Supply and Grounding System MaintenanceItems of the Base Station
This provides the maintenance items, maintenance intervals, operation instructions, and
reference standards of the base station power supply and grounding system.
Table 3-2 lists the routine maintenance items for the power supply and the grounding system
of the .
Table 3-2 Maintenance items of the power supply and grounding system of the base station
Item Interval Operating Instruction
Reference Standard
Checking power
cables
Monthly Check the connections
of power cables
carefully.
The power cables are not
aging, and there is no
corrosion on the
connection points.
Checking the
voltage
Monthly Measure the voltage of
the power supply by
using a multimeter.
The voltage is within
standard range.
Checking PGND
cables
Monthly Check whether the
PGND cable and
grounding bar are
connected properly.
The connections of the
PGND cable are sound. It
is not aging. The
connection points are
sound with no corrosion
on them.
Earth resistance Monthly Measure the earth
resistance by using an
electric earth resistance
tester and keep a record.
The grounding resistance
of the cabinet is smaller
than 10 ohms.
Checking the
storage batteries
Yearly Check the storage
batteries and rectifiers
every year.
The battery capacity is
within the normal range
and the batteries are
correctly connected. The
performance parameters
of rectifiers are normal.
BTS3900 GSM
Site Maintenance Guide 3 Hardware Items of BTS3900 Routine Maintenance
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
3-3
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
20/55
3.3 Maintenance of the Main Components in the BaseStation
This describes the maintenance items, maintenance interval, operating instruction, and reference
standard of the main components in the Base Station.
Table 3-3 describes the maintenance items of the main components in the Base Station.
Table 3-3 Maintenance items of the main components in the Base Station
Item Interval Operating Instruction Reference Standard
Checking the
fans
Monthly Check whether the fans are
operational.
The fans work properly
without exceptional
sounds generated byfrictions between the
blades of the fan and the
subrack.
Checking the
air filter
Quarterly If there is too much dust on the
air filter, clean the air filter.
-
Checking the
exterior of the
cabinet
Quarterly Check whether there are dents,
cracks, holes, or corrosion on
the surface of the cabinet and
whether the cabinet label is
legible.
-
Checking the
lock and door
of the cabinet
Quarterly Check whether the lock is
normal and the door can be
opened and closed easily.
-
Checking the
cleanness of
the cabinet
Quarterly Check whether the cabinet is
clean.
The cabinet surface is
clean. The subracks are
not dusty.
Checking the
fan box
Annually If there is too much dust on the
surface of or inside the fan box,
clean the fan box.
-
CheckingLEDs on the
boards
Monthly Check whether the LEDs on theboards are normal.
For details about thestatus of LEDs, see the
hardware description
about the corresponding
boards.
3 Hardware Items of BTS3900 Routine Maintenance
BTS3900 GSM
Site Maintenance Guide
3-4 Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
Issue 02 (2009-09-30)
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
21/55
Item Interval Operating Instruction Reference Standard
Checking the
ESD wrist
strap
Quarterly Use either of the following
methods:
l Use an ESD wrist strap testerto test the ESD wrist strap.
l Use a multimeter to test the
earth resistance of the ESD
wrist strap.
l If you are using an
ESD wrist strap tester,
the LED GOOD is on.
l If you are using a
multimeter, the earth
resistance is between
0.75 megohm and 10
megohms.
BTS3900 GSM
Site Maintenance Guide 3 Hardware Items of BTS3900 Routine Maintenance
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
3-5
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
22/55
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
23/55
4 Powering On and Powering Off a BTS3900Cabinet
About This Chapter
This describes how to power on and power off a BTS3900 cabinet. The procedures for powering
off the BTS3900 cabinet in normal and emergency cases are different.
4.1 Powering On the BTS3900
This describes how to power on the BTS3900 cabinet and handle the power supply failure to
the internal parts of the cabinet.
4.2 Powering Off the BTS3900
This describes how to power off the BTS3900 cabinet. The BTS3900 power-off is classified
into normal power-off and emergency power-off.
BTS3900 GSM
Site Maintenance Guide 4 Powering On and Powering Off a BTS3900 Cabinet
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
4-1
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
24/55
4.1 Powering On the BTS3900
This describes how to power on the BTS3900 cabinet and handle the power supply failure to
the internal parts of the cabinet.
Prerequisite
l The input power cables are correctly and securely connected.
l The power input of the BTS3900 cabinet meets the specifications.
l The power switches on the DCDU are all set to OFF.
l The external power supply to the BTS3900 cabinet is disconnected.
Context
Table 4-1 lists the power switches on the DCDU.
Table 4-1 Power switches on the DCDU
Module Power Switch on the DCDU
- SPARE2
GATM SPARE1
BBU BBU
FAN FAN
RFU5 RFU5
RFU4 RFU4
RFU3 RFU3
RFU2 RFU2
RFU1 RFU1
RFU0 RFU0
CAUTION
The cabinet must be powered on in seven days after unpacked. In addition, the cabinet cannot
be in the power-off state for more than 48 hours during maintenance.
Procedure
Step 1 Switch on the external power equipment to power on the cabinet.
4 Powering On and Powering Off a BTS3900 Cabinet
BTS3900 GSM
Site Maintenance Guide
4-2 Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
Issue 02 (2009-09-30)
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
25/55
If... Then...
The cabinets are BTS3900 (+24 V) cabinet and BTS3900 (220 V) cabinet, Go to Step 2.
The cabinet is BTS3900 (-48 V) cabinet, Go to Step 3.
Step 2 Check whether the PSU is running properly by referring to PSU (AC/DC) and PSU (DC/DC).
Step 3 Check whether the input voltage of the DCDU in the BTS3900 is normal.
If... Then...
The input voltage of the DCDU is not in the
range -38.4 V DC to -57 V DC,
The DC power supply inside the cabinet is
abnormal, go to Step 4.
The input voltage of the DCDU is in the
range -38.4 V DC to -57 V DC,
The cabinet power-on check is complete. Go to
Step 7.
Step 4 Switch off the external power supply of the BTS3900 cabinet to disconnect the power supply tothe cabinet.
Step 5 Check the connection and routing of the power cables for the DCDU.
Step 6 Go to Step 3 to check whether the input voltage of the DCDU is normal.
Step 7 Switch on the power switches on the DCDU, and then check the DC power supply to the internalparts of the cabinet based on Table 4-2.
Table 4-2 LED status of different parts when power supply is normal
Part Normal LED Status
GATM The RUN LED on the board panel blinks.
BBU All the LEDs on the BBU panel are on.
FAN unit The fans run normally and the RUN LED on
the panel blinks.
RFU All the six LEDs on each RFU are on.
Step 8 When there is a power supply failure to the internal parts of the cabinet after powering on the
cabinet, check the following items listed in Table 4-3.
Table 4-3 Troubleshooting
Fault Type Handling Measures
Power supply failure to all the internal parts
of the cabinet
Check whether the GND cable and the -48 V
power cable are inversely connected.
l If the cable connection is wrong, set all the
power switches on the DCDU to OFF, and
then reconnect the power cables.
l If the cable connection is correct, replace
the DCDU.
BTS3900 GSM
Site Maintenance Guide 4 Powering On and Powering Off a BTS3900 Cabinet
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
4-3
http://-/?-http://-/?-7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
26/55
Power supply failure to a board in the cabinet Check the following items:
1. Remove the board, and then check whether
the pins of the board slot on the backplane
are distorted, broken, or missing. Replace
the subrack if necessary.
2. Install the board into the subrack and check
the LED on the board.
3. If the LED blinks improperly, remove the
board and insert it into another idle slot that
can house the board of the same type.
Then, check the LED on the board.
l If the board works properly, you can
infer that the slot is faulty. Replace the
subrack.
l
If the board still works improperly,replace the board.
Power supply failure to any other part in the
cabinet
Use a multimeter to measure the input voltage
of the faulty part.
l If the input voltage is in the range -38.4 V
and -57 V, replace the part.
l If the input voltage is not in the range -38.4
V and -57 V, check the connections of
power cables for the part. If the power
cables are in poor connection, set all the
power switches on the DCDU to OFF, and
then reconnect the power cables. If thepower cables are in good connection,
replace the DCDU because the power
switches on it may be faulty.
----End
4.2 Powering Off the BTS3900
This describes how to power off the BTS3900 cabinet. The BTS3900 power-off is classifiedinto normal power-off and emergency power-off.
Procedure
Step 1 Choose normal power-off or emergency power-off based on the specific requirement.
If... Then...
The BTS is powered off in the case of an
equipment swap or a foreseeable regional
blackout,
Go to Step 2 to perform the normal power-
off.
4 Powering On and Powering Off a BTS3900 Cabinet
BTS3900 GSM
Site Maintenance Guide
4-4 Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
Issue 02 (2009-09-30)
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
27/55
If... Then...
The BBU incurs electric spark, smog, or
water immersion,
Go to Step 3 to perform the emergency
power-off.
Step 2 To perform normal power-off, do as follows:
1. Modify the management status to block all the RFUs in the cabinet.
2. Set all the power switches on the DCDU to OFF.
3. Switch off the external power supply to the BTS3900.
Step 3 Switch off the external power supply to the BTS3900. Then, if time allows, turn off the powerswitch on the DCDU.
----End
BTS3900 GSM
Site Maintenance Guide 4 Powering On and Powering Off a BTS3900 Cabinet
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
4-5
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
28/55
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
29/55
5 Replacing the BTS3900 ComponentsAbout This Chapter
Replacing the BTS3900 components involves replacing the BBU components, DCDU-01, FAN
unit, PMU, PSU, GATM, RFU, and power supply subrack.
5.1 Replacing BBU3900 Parts
This describes how to replace the BBU3900 parts. The BBU3900 parts consist of the BBU3900,
and the internal boards of the BBU3900.
5.2 Replacing a DCDU-01 Module
The DCDU-01, installed under the BBU, supplies DC power for the cabinet and performs surge
protection. Replacing the DCDU-01 disrupts the services carried on the corresponding cabinet.
It takes about 20 minutes to replace the DCDU-01.
5.3 Replacing the FAN Unit
The FAN unit works with the air inlet box in the cabinet to form a ventilation path. The FAN
unit provides forced ventilation and dissipation for the BBU and RFU. Replacing the FAN unit
may result in over-temperature alarms due to interruption of heat dissipation for the cabinet but
has no negative effect on services of the BTS. It takes about 20 minutes to replace a FAN unit.
5.4 Replacing the PMU
When the PMU is faulty and cannot be repaired in time, you must replace it.
5.5 Replacing a PSU
When a PSU is faulty and cannot be repaired in time, you must replace it.
5.6 Replacing the GATM
This describes how to replace the GSM antenna and TMA control module (GATM). The GATM
controls the RET antenna and supplies power to the TMA. The replacement of the GATM
disrupts the services carried on it.
5.7 Replacing an RFU
The RFU is an RF filter unit, which is located in the RFC. Replacing an RFU disrupts all the
services carried on the RFU.
5.8 Replacing the BTS3900 Power Subrack
The power subrack is located in the lower part of the BTS3900 cabinet. It houses PSUs and PMUand provides power input and output ports. It takes about 25 minutes to replace a power subrack.
BTS3900 GSM
Site Maintenance Guide 5 Replacing the BTS3900 Components
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
5-1
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
30/55
5.1 Replacing BBU3900 Parts
This describes how to replace the BBU3900 parts. The BBU3900 parts consist of the BBU3900,
and the internal boards of the BBU3900.
5.1.1 Replacing the BBU3900
This describes how to replace the BBU3900. The BBU3900 is the BTS control unit and enables
the interaction between the BTS and the BSC. The replacement of the BBU3900 disrupts all the
services carried on the BTS.
5.1.2 Replacing the BBU Parts
This describes how to replace the faulty UBFA, UPEU, UEIU, GTMU, UELP, UFLP, USCU,
and optical module.
5.1.1 Replacing the BBU3900This describes how to replace the BBU3900. The BBU3900 is the BTS control unit and enables
the interaction between the BTS and the BSC. The replacement of the BBU3900 disrupts all the
services carried on the BTS.
Prerequisite
1. The configuration (involving hardware and software) of the faulty BBU3900 is determined
and a new BBU3900 of the same configuration is available.
2. The tools and materials are ready. The required tools and materials are ESD gloves, an ESD
wrist strap, a Phillips screwdriver, a flat-head screwdriver, an ESD box or bag, dustfree
cloth, and a fiber cleaner.
Context
Replacing the BBU3900 involves disconnecting and connecting cables. It takes about 30 minutes
to replace the BBU3900.
WARNING
The replacement of the BBU3900 disrupts all the services carried on the BTS. Therefore, perform
this task with caution.
WARNING
You must take proper ESD prevention measures, for example, wear an ESD wrist strap or a pair
of ESD gloves to prevent the boards, modules, or electrical components from being damaged
by static electricity generated by your body.
Procedure
Step 1 Power off the BTS in a common situation.
5 Replacing the BTS3900 Components
BTS3900 GSM
Site Maintenance Guide
5-2 Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
Issue 02 (2009-09-30)
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
31/55
Step 2 Label the cables on the BBU3900 and remove the cables. Then, take proper insulation measuresto remove the BBU3900 and put it in an ESD box.
Step 3 Unpack the new BBU3900, check the BBU3900, and ensure that the BBU3900 is intact, the DIP
switches are properly set, and the hardware version is consistent with the BBU3900 to bereplaced. Then, install the new BBU3900. Install the cables on the panel of the new board
according to the recorded installation positions.
Step 4 Switch on the external power supply to the BTS and power on the BTS.
Step 5 Perform software loading and data configuration for GTMU on the LMT.
----End
Postrequisite
After replacing the BBU3900, verify the following items:
l The related alarms on the LMT or M2000 are cleared.
l An MS can access the cell in service area of the BBU3900.
Contact the local Huawei office to handle the faulty BBU3900.
5.1.2 Replacing the BBU Parts
This describes how to replace the faulty UBFA, UPEU, UEIU, GTMU, UELP, UFLP, USCU,
and optical module.
Replacing a UBFA
The UBFA is the fan module in the BBU. The UBFA and the air inlet box in the BBU form a
ventilation loop, implementing forced heat dissipation for the BBU. During the replacement of
the UBFA, the heat generated by the BBU cannot be properly ventilated and, with temperature
increase, an overtemperature alarm is reported. The services, however, are not affected.
Prerequisite
l The quantity of faulty UBFAs is checked, and new modules are ready.
l The installation position of the faulty UBRA and status of the LEDs on the UBFA are
recorded.
l The required tools and materials such as ESD wrist strap/ESD gloves and ESD box/ESD
bag are kept ready.
Context
This board is hot swappable.
It takes about three minutes to replace a UBFA, which involves removing the faulty UBFA,
installing the new UBFA, and waiting for the new UBFA to start working properly.
BTS3900 GSM
Site Maintenance Guide 5 Replacing the BTS3900 Components
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
5-3
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
32/55
CAUTION
l Take proper ESD protection measures, for example, wear an ESD wrist strap or a pair of
ESD gloves, to prevent electrostatic damage to the boards, modules, or electroniccomponents.
l Replacing the UBFA causes the temperature of the BBU to increase, which results in the
overtemperature alarm.
Procedure
Step 1 Loosen the screws on the panel of the UBFA.
Step 2 Remove the faulty UBFA from the slot.
CAUTION
If one or more fans are still rotating in the faulty FAN unit, do not touch the rotating fans by
hand to avoid being hurt after the FAN unit is removed.
Step 3 Slide the new UBFA into the slot.
Step 4 Tighten the screws on the panel of the new UBFA.
Step 5 Check the running status of the new UBFA.
NOTE
For details on the LED of the UBFA, see the UBFA.
----End
Postrequisite
Record the bar code of the replaced board.
Contact the local Huawei office to handle the faulty UBFA.
Replacing a UPEUThe UPEU is the power module of the BBU and provides power for the boards in the BBU. The
UPEU supports the -48/+24V V DC input. During the replacement of the UPEU, the BBU is
powered off and the ongoing-services are disrupted.
Prerequisite
l The number and types of faulty UPEUs are obtained, and new UPEUs are available.
l The status of the LEDs on the faulty UPEU and cable connections on the panel are recorded.
l The state of the switch on the power board is confirmed.
l
The required tools and materials such as an ESD wrist strap/ESD gloves and an ESD box/ESD bag are kept ready.
5 Replacing the BTS3900 Components
BTS3900 GSM
Site Maintenance Guide
5-4 Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
Issue 02 (2009-09-30)
http://-/?-7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
33/55
Context
It takes about 10 minutes to replace the board. The duration of the replacement involves the
removal of the cables and the faulty UPEU, the installation of the new UPEU and the cables,
and the time elapsed for the operation of the UPEU.
CAUTION
Take proper ESD protection measures, for example, wear an ESD wrist strap or a pair of ESD
gloves, to prevent electrostatic damage to the boards, modules, or electronic components.
Procedure
Step 1 Power off the BBU by referring to Powering Off the BBU3900.
Step 2 Remove the cables from the panel of the faulty UPEU.
Step 3 Loosen the screws on the panel of the UPEU.
Step 4 Remove the faulty UPEU from the slot.
Step 5 Put the faulty UPEU into the ESD bag.
Step 6 Slide the new UPEU into the slot of the faulty UPEU.
Step 7 Fasten the screws on the panel of the new UPEU.
Step 8 Install the cables on the panel of the new board according to the recorded installation positions.
Step 9 Power on the BBU by referring to Powering on the BBU3900.
Step 10 Check the running status of the new UPEU.
NOTE
For details on the LED of the UPEU, see the UPEU.
----End
Postrequisite
Record the BOM code of the replaced board.
Contact the local Huawei office to handle the faulty UPEU.
Replacing the UEIU
The Universal Environment Interface Unit (UEIU) is used to transmit the monitoring signals of
the service boards in the BBU. During the replacement of the UEIU, the external devices cannot
be monitored.
Prerequisite
l The number and types of faulty UEIUs are determined, and new UEIUs are available.
l
The installation positions of the faulty UEIUs and the interconnection relations of the cableson the UEIU panels are recorded.
BTS3900 GSM
Site Maintenance Guide 5 Replacing the BTS3900 Components
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
5-5
http://-/?-http://-/?-http://-/?-http://-/?-7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
34/55
l The required tools and materials such as ESD wrist strap/ESD gloves and ESD box/ESD
bag are kept ready.
Context
This board is hot swappable.
It takes about 5 minutes to replace the board. The duration of the replacement involves the
removal of the cables and the faulty UEIU, the installation of the new UEIU and the cables, and
the time elapsed for the operation of the UEIU.
CAUTION
Take proper ESD protection measures, for example, wear an ESD wrist strap or a pair of ESD
gloves, to prevent electrostatic damage to the boards, modules, or electronic components.
Procedure
Step 1 Remove the cables from the panel of the faulty UEIU.
Step 2 Loosen the screws on the panel of the UEIU.
Step 3 Remove the faulty UEIU from the slot.
Step 4 Put the faulty UEIU into an ESD bag.
Step 5 Slide the new UEIU into the slot of the faulty UEIU.
Step 6 Fasten the screws on the panel of the new board.
Step 7 Install the cables on the panel of the new board according to the recorded installation positions.
----End
Postrequisite
Record the bar code of the replaced board.
Contact the local Huawei office to handle the faulty UEIU.
Replacing the GTMUAs the basic transmission and control entity of the BBU, the GTMU controls and manages the
entire base station. It provides the interfaces associated with reference clock, power supply, OM,
and external alarm collection. Replacing the GTMU may disrupt all services on the base station.
Prerequisite
l The quantity and types of faulty GTMUs are confirmed, and new GTMUs are ready.
l The LED status and cable connections on the faulty GTMU and the cable position on the
panel of the GTMU are recorded.
l The logs and history alarms before the alarm is generated are extracted.
l The operation logs of the board are extracted.
5 Replacing the BTS3900 Components
BTS3900 GSM
Site Maintenance Guide
5-6 Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
Issue 02 (2009-09-30)
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
35/55
l The tools and materials, such as an ESD wrist strap or a pair of ESD gloves and an ESD
box or bag, are ready.
Context
The board is hot-swappable.
It takes about 15 minutes to replace a board. The replacement process involves disconnecting
cables, removing the faulty board, installing the new board, connecting cables to the new board,
and waiting the new board to resume services.
CAUTION
Take proper ESD protection measures, for example, wear an ESD wrist strap or a pair of ESD
gloves, to prevent electrostatic damage to the boards, modules, or electronic components.
NOTE
The GTMU hereinafter mentioned in this document is the first type.
Procedure
Step 1 Block the faulty GTMU on the OM system.
Step 2 Remove the faulty GTMU.
1. Attach temporary labels to the cables, and then disconnect the cables from the faulty
GTMU.
2. Loosen the screws on the panel of the faulty GTMU.
3. Turn the ejector lever outwards, and then remove the faulty GTMU from the slot.
4. Put the faulty GTMU into the ESD bag.
Step 3 Install a new GTMU.
1. Place and slide the new GTMU into the original slot where the faulty GTMU is installed.
2. Turn the ejector lever inwards, and then tighten the screws on the panel of the new GTMU.
3. Connect the cables to the panel of the new GTMU according to the temporary labels.
Step 4 Check the status of the LEDs to ensure that the new board runs properly.
NOTE
For details on the LEDs, see GTMU.
Step 5 Determine whether related alarms are reported.
1. Query the active alarms of the board on the OM system.
2. If active alarms are reported, clear them according to the handling suggestion. If no alarm
is reported, go to Step 6.
Step 6 Activate the BootROM or software version of the new board.
Step 7 Check and ensure that the version of the new board is consistent with the latest version on theexisting network. If not, upgrade the version of the new board.
Step 8 Unblock the new board on the OM system.
BTS3900 GSM
Site Maintenance Guide 5 Replacing the BTS3900 Components
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
5-7
http://-/?-7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
36/55
Step 9 Check whether the board can carry services. Perform a dial test after the board is replaced.
----End
Postrequisitel Record the BOM code of the replaced board.
l Contact the local Huawei office to handle the faulty GTMU.
Replacing the UELP
The UELP is used for E1/T1 surge protection of the BBU. Each UELP provides surge protection
for four E1/T1 signals. The UELP replacement interrupts the E1/T1 links. Thus, the ongoing
BTS services are disrupted.
Prerequisite
l The number and types of faulty UELPs are determined, and new UELPs are kept ready.
l The installation positions of the UELP and the interconnection relations of the cables on
the UELP panel are recorded.
l The required tools and materials such as ESD wrist strap/ESD gloves and ESD box/ESD
bag are kept ready.
Context
This board is hot swappable.
It takes about two minutes to replace the board. The duration of the replacement involves the
removal of the cables and the faulty board, the installation of the new board and the cables, andthe time required for the operation of the board.
CAUTION
Take correct ESD prevention measures, such as wearing an ESD wrist strap or ESD gloves, to
avoid static damage to boards, modules, and electronic components.
Procedure
Step 1 Remove the cables from the panel of the faulty UELP.
Step 2 Loosen the screws on the panel of the UELP.
Step 3 Remove the faulty UELP from the slot.
Step 4 Slide the new UELP into the slot of the faulty UELP.
Step 5 Fasten the screws on the panel of the new UELP.
Step 6 Install the cables on the panel of the new UELP according to the recorded installation positions.
Step 7 Perform the dialing test to verify that the services are resumed.
----End
5 Replacing the BTS3900 Components
BTS3900 GSM
Site Maintenance Guide
5-8 Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
Issue 02 (2009-09-30)
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
37/55
Postrequisite
Record the bar code of the replaced board.
Contact the local Huawei office to handle the faulty UELP.
Replacing the UFLP
The UFLP is used for FE surge protection of the BBU. The UFLP replacement interrupts the
E1/T1 links. Thus, the ongoing BTS services are disrupted.
Prerequisite
l The number and types of faulty UFLPs are determined, and new UFLPs are kept ready.
l The installation positions of the UFLP and the interconnection relations of the cables on
the UFLP panel are recorded.
l
The required tools and materials such as ESD wrist strap/ESD gloves and ESD box/ESDbag are kept ready.
Context
This board is hot swappable.
It takes about two minutes to replace the board. The duration of the replacement involves the
removal of the cables and the faulty board, the installation of the new board and the cables, and
the time required for the operation of the board.
CAUTION
Take correct ESD prevention measures, such as wearing an ESD wrist strap or ESD gloves, to
avoid static damage to boards, modules, and electronic components.
Procedure
Step 1 Remove the cables from the panel of the faulty UFLP.
Step 2 Loosen the screws on the panel of the UFLP.
Step 3 Remove the faulty UFLP from the slot.
Step 4 Slide the new UFLP into the slot of the faulty UFLP.
Step 5 Fasten the screws on the panel of the new UFLP.
Step 6 Install the cables on the panel of the new UFLP according to the recorded installation positions.
Step 7 Perform the dialing test to verify that the services are resumed.
----End
Postrequisite
Record the bar code of the replaced board.
BTS3900 GSM
Site Maintenance Guide 5 Replacing the BTS3900 Components
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
5-9
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
38/55
Contact the local Huawei office to handle the faulty UFLP.
Replacing the USCU
The USCU is the extended satellite card clock unit of the BBU3900. It receives clock signalssuch as the GPS, RGPS, BITS, and M-1PPS signals. In addition, it transmits or receives 1PPS
+TOD clock signals. Replacing the USCU does not affect the services.
Prerequisite
l The quantity and type of faulty USCUs are confirmed, and new USCUs is ready.
l The cable connections on the faulty USCU and their positions on the panel of the USCU
are recorded.
l The status of the LEDs on the panel of the board is recorded, and the operation log of the
main control board is exported.
l The tools and materials, such as an ESD wrist strap or a pair of ESD gloves and an ESDbox or bag, are ready.
Context
The board is hot-swappable.
CAUTION
Take proper ESD protection measures, for example, wear an ESD wrist strap or a pair of ESD
gloves, to prevent electrostatic damage to the boards, modules, or electronic components.
Procedure
Step 1 Block the faulty USCU on the OM system.
Step 2 Check the position of the board.
Before replacing a board, confirm the board to be replaced and attach a label to its panel to avoid
malfunctions.
Step 3 Remove the faulty USCU.
1. Attach temporary labels to the cables, and then disconnect the cables from the faulty USCU.
2. Loosen the screws on the panel of the faulty board.
3. Turn the ejector lever outwards, and then remove the faulty board from the slot.
4. Put the faulty board into the ESD box or bag.
Step 4 Install a new USCU.
1. Take out the new USCU, and check that it is intact and that the version of the new USCU
is consistent with that of the faulty USCU.
2. Place and slide the new USCU into the original slot where the faulty USCU is installed.
3. Turn the ejector lever inwards, and then tighten the screws on the panel of the new USCU.
4. Connect the cables to the panel of the new USCU according to the temporary labels.
5 Replacing the BTS3900 Components
BTS3900 GSM
Site Maintenance Guide
5-10 Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
Issue 02 (2009-09-30)
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
39/55
Step 5 Check the status of the LEDs to ensure that the new board works properly.
NOTE
For details on the LEDs, see USCU.
Step 6 Determine whether related alarms are reported.
1. Query the active alarms of the board on the OM system.
2. If active alarms are reported, clear them according to the handling suggestion. If no alarm
is reported, go to Step 7.
Step 7 Select the type of clock source provided by the USCU and traced by the main control board onthe OM system.
Step 8 Unblock the new board on the OM system.
----End
PostrequisiteRecord the bar code of the replaced board.
Contact the local Huawei office to handle the faulty USCU.
Replacing the Optical Module
The optical module provides the electrical-optical interface for the optical transmission between
the BBU and other devices. During the replacement of the optical module, the optical cable is
removed. Thus, the CPRI signal transmission is disrupted.
Prerequisitel The number and types of faulty optical modules are determined, and new optical modules
are available.
l The installation positions of the faulty optical modules and optical cables are recorded. The
interconnection relations for the optical cables are also recorded.
l The required tools and materials such as ESD wrist strap/ESD gloves and ESD box/ESD
bag are kept ready.
Context
The optical module can be installed in the CPRI0-CPRI5 ports on the GTMU.
The optical module is hot swappable.
It takes about five minutes to replace the optical module of the BBU. The duration of the
replacement involves the removal of the optical cable and the faulty optical module, the
installation of the new optical module, the connection of the optical cable to the optical module,
and the time elapsed for the restoration of the CPRI links.
BTS3900 GSM
Site Maintenance Guide 5 Replacing the BTS3900 Components
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
5-11
http://-/?-7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
40/55
CAUTION
l You must take proper ESD prevention measures, for example, wear an ESD wrist strap or
a pair of ESD gloves to prevent the boards, modules, or electrical components from beingdamaged by static electricity generated by your body.
l Do not look into the optical module after removing the optical cable from the optical
module.
Procedure
Step 1 Press the bulge on the optical cable connector, and then remove the connector from the faultyoptical module.
Step 2 Turn the puller on the faulty optical module outwards, and then pull out the optical module from
the slot and also from the BBU.
Step 3 Install the new optical module into the BBU.
Step 4 Remove the dustproof caps from the optical connector and from the optical module, and theninsert the connector into the new module.
----End
Postrequisite
Contact the local Huawei office to handle the faulty optical module.
5.2 Replacing a DCDU-01 Module
The DCDU-01, installed under the BBU, supplies DC power for the cabinet and performs surge
protection. Replacing the DCDU-01 disrupts the services carried on the corresponding cabinet.
It takes about 20 minutes to replace the DCDU-01.
Prerequisite
l The model of the faulty DCDU-01 is confirmed and the new DCDU-01 of the same model
is available.
l The new DCDU-01 module is intact, and the hardware version of the new DCDU-01 is
consistent with that of the faulty DCDU-01.
l The tools and materials, such as an ESD wrist strap or a pair of ESD gloves, a Phillips
screwdriver, an ESD box or bag, and the key to the cabinet door, are available.
Context
CAUTION
Take proper ESD protection measures, for example, wear an ESD wrist strap or a pair of ESD
gloves, to prevent electrostatic damage to the boards, modules, or electronic components.
5 Replacing the BTS3900 Components
BTS3900 GSM
Site Maintenance Guide
5-12 Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
Issue 02 (2009-09-30)
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
41/55
Procedure
Step 1 Power off the BTS3900.
Step 2 Mark the cables connected to the output ports on the DCDU-01, and then disconnect them.
Step 3 Use the Phillips screwdriver to remove the protection cover from the external power input wiringterminal block of the DCDU-01, as shown in Figure 5-1.
Figure 5-1 Removing the protection cover
(1) Protection cover (2) Screw (3) External input power cable
Step 4 Mark the external input power cable for the DCDU-01, and then disconnect the cable.
Step 5 Remove the four M6x12 screws on the two mounting ears of the DCDU-01, as shown in Figure
5-2.
Figure 5-2 Removing the screws on the two mounting ears of the module
BTS3900 GSM
Site Maintenance Guide 5 Replacing the BTS3900 Components
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
5-13
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
42/55
Step 6 Remove the DCDU-01 module by pulling out the DCDU-01 with one hand, and holding theDCDU-01 with the other hand.
Step 7 Put the faulty DCDU-01 into an ESD box.
Step 8 Install the new DCDU-01 into the position where the original one is located, and then use thefour removed M6x12 screws to fasten the DCDU-01 to the subrack.
Step 9 Insert the OT terminal of the power cable into the corresponding cable hole in the wiring terminalblock. Connect the OT terminal of the -48 V power cable (blue) to the terminal labeled NEG(-),
and then connect the OT terminal of the GND cable (black) to the terminal labeled RTN(+).
Step 10 Place the protection cover on the DCDU-01, and then tighten the screw on the protection coverby using the Phillips screwdriver.
Step 11 Remove the rubber covers from the DCDU-01 power sockets on the new DCDU-01 panel.
Step 12 Connect the removed cables to the power output ports on the DCDU-01 panel according to themarks.
Step 13 Power on the BTS3900.
----End
Postrequisite
After replacing the DCDU-01, perform the following operations:
l Check that the cable connections are correct and secure.
l Ensure that the related alarms are cleared on the M2000 or LMT after the equipment is
powered on.
l Contact the local Huawei office to handle the faulty DCDU-01 module.
5.3 Replacing the FAN Unit
The FAN unit works with the air inlet box in the cabinet to form a ventilation path. The FAN
unit provides forced ventilation and dissipation for the BBU and RFU. Replacing the FAN unit
may result in over-temperature alarms due to interruption of heat dissipation for the cabinet but
has no negative effect on services of the BTS. It takes about 20 minutes to replace a FAN unit.
Prerequisite
l A new FAN unit is ready.l Ensure that the new FAN unit is in good condition and the version of the new FAN unit is
consistent with that of the faulty FAN unit.
l The required tools and materials, such as ESD wrist strap, Phillips screwdriver, ESD box
or bag, and the key to the cabinet door, are available.
5 Replacing the BTS3900 Components
BTS3900 GSM
Site Maintenance Guide
5-14 Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
Issue 02 (2009-09-30)
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
43/55
Context
CAUTION
Take proper ESD prevention measures, for example, wear an ESD wrist strap or gloves to prevent
the boards, modules, and electronic components from being damaged by the static electricity
generated by human body.
Procedure
Step 1 Set the DC distribution switch FAN labeled on the DCDU-01 to OFF. Figure 5-3 shows theposition of the FAN unit switch on the DCDU-01.
Figure 5-3 Position of the FAN unit switch
Step 2 Label the cables on the panel of the FAN unit and then remove the cables.
Step 3 Loosen the captive screws on both sides of the adjustable cable trough. Then, raise the cabletrough and fix it at the upper mounting hole, as shown in Figure 5-4.
BTS3900 GSM
Site Maintenance Guide 5 Replacing the BTS3900 Components
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
5-15
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
44/55
Figure 5-4 Raising the adjustable cable trough
(1) Upper mounting hole (2) Captive screw
Step 4 Remove the four screws from the fan subrack, as shown in Figure 5-5.
5 Replacing the BTS3900 Components
BTS3900 GSM
Site Maintenance Guide
5-16 Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
Issue 02 (2009-09-30)
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
45/55
Figure 5-5 Removing the FAN unit
Step 5 Pull out the fan subrack by one-third of its length with one hand, hold the fan subrack with theother hand, and then pull the entire fan subrack out of the cabinet.
Step 6 Put the new FAN unit into the fan subrack. Then, secure the four screws on the fan subrack.
Step 7 Place the adjustable cable trough to its original position, and then tighten the captive screws onboth sides of the adjustable cable trough.
Step 8 Install the cables to the panel of the FAN unit based on the labels.
Step 9 Set the FAN unit switch on the DCDU-01 to ON.
----End
Postrequisite
After replacing the FAN unit, perform the following operations:
l Check the cables and ensure that they are correctly and tightly connected.
l Ensure the RUN LED on the panel is green and blinks at 0.5 Hz when the equipment is
powered on.
l Ensure that the related alarms are cleared after the equipment is powered on.
l Contact the local Huawei office to dispose of the faulty FAN unit.
5.4 Replacing the PMU
When the PMU is faulty and cannot be repaired in time, you must replace it.
BTS3900 GSM
Site Maintenance Guide 5 Replacing the BTS3900 Components
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
5-17
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
46/55
Prerequisite
l The type of faulty PMU is confirmed and the new PMU is ready.
l The new PMU is intact and its version is consistent with the version of the faulty PMU.
l The tools and materials are ready. The tools and materials are the ESD wrist strap or gloves,cross screwdriver, ESD box or bag, and key to the cabinet door.
Context
This module is hot swappable.
CAUTION
Take proper ESD prevention measures, for example, wearing an ESD wrist strap or a pair of
ESD gloves, to protect the PMU from electrostatic damage.
Procedure
Step 1 Disconnect the cables from the panel of the PMU, and then label the cables.
CAUTION
When inserting or removing the DB50 connector of the environment monitoring signal cable,
you must hold the connector with both hands and keep it perpendicular to the panel, to preventfalse alarms caused by bent pins.
Step 2 Loosen the screws on the handle of the PMU panel by using a screwdriver.
Step 3 Pull the handle gently to disconnect the buckle of the PMU from the subrack, and then removethe PMU from the slot, as shown in Figure 5-6.
Figure 5-6 Removing the PMU
Step 4 Set the DIP switch of the new PMU to 11000000, as shown in Figure 5-7.
5 Replacing the BTS3900 Components
BTS3900 GSM
Site Maintenance Guide
5-18 Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
Issue 02 (2009-09-30)
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
47/55
Figure 5-7 Set the DIP switch
Step 5 Loosen the screws on the handle of the PMU. Then, pull the handle outwards.
Step 6 Slide the PMU along the guide rails into the slot and then push the handle back.
Step 7 Tighten the screws on the handle, as shown in Figure 5-8.
Figure 5-8 Installing the PMU
Step 8 Connect the cables, which have been disconnected from the PMU, according to the labels.
----End
Postrequisite
After replacing the PMU, check the following items:
l The cables are correctly and tightly connected.
l The RUN LED on the panel blinks green at 0.5 Hz after the PMU is powered on.
l On the M2000 or LMT, the related alarms are cleared.
l Contact the local Huawei office to handle the faulty PMU.
5.5 Replacing a PSU
When a PSU is faulty and cannot be repaired in time, you must replace it.
Prerequisite
l The type of faulty PSU is confirmed and the new PSU is ready.
BTS3900 GSM
Site Maintenance Guide 5 Replacing the BTS3900 Components
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
5-19
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
48/55
l The new PSU is intact and its version is consistent with the version of the faulty PSU.
l The tools and materials are ready. The tools and materials are the ESD wrist strap or gloves,
cross screwdriver, ESD box or bag, and key to the cabinet door.
Context
This module is hot swappable.
CAUTION
Take proper ESD prevention measures, for example, wearing an ESD wrist strap or a pair of
ESD gloves, to protect the PSU from electrostatic damage.
Procedure
Step 1 Loosen the screws on the handle of the PSU panel by using a screwdriver.
Step 2 Pull the handle gently to disconnect the buckle of the PSU from the subrack, and then removethe PSU from the slot, as shown in Figure 5-9.
Figure 5-9 Removing the PSU
Step 3 Loosen the screws on the handle of the PSU. Then, pull the handle outwards.
Step 4 Slide the PSU along the guide rails into the slot and then push the handle back.
Step 5 Tighten the screws on the handle, as shown in Figure 5-10.
Figure 5-10 Installing the PSU
----End
Postrequisite
After replacing the PSU, check the following items:
5 Replacing the BTS3900 Components
BTS3900 GSM
Site Maintenance Guide
5-20 Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
Issue 02 (2009-09-30)
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
49/55
l The power LED on the PSU is ON (green) after the PSU is powered on.
l On the M2000 or LMT, the related alarms are cleared.
l Contact the local Huawei office to handle the faulty PSU.
5.6 Replacing the GATM
This describes how to replace the GSM antenna and TMA control module (GATM). The GATM
controls the RET antenna and supplies power to the TMA. The replacement of the GATM
disrupts the services carried on it.
Prerequisite
The required tools and materials, such as ESD wrist strap, cross screwdriver, ESD box or bag,
dustfree cotton cloth, and key to the cabinet door, are available.
Context
WARNING
Take proper ESD prevention measures, for example, wear ESD wrist straps or gloves to prevent
the boards, modules, and electronic components from being damaged by the static electricity
generated by human body.
Procedure
Step 1 Set the power switch on the DCDU that corresponds to the GATM to be replaced to OFF.
Step 2 Label the cables on the GATM, and then disconnect the cables.
Step 3 Use a cross screwdriver to loosen the four screws on the GATM panel, as shown in Figure5-11.
Figure 5-11 Loosening the screws
Step 4 Pull out the GATM by one-third of its length. Then, hold the GATM with one hand and removeit from the subrack.
Step 5 Place the removed GATM in an ESD box.
Step 6 Ensure that the new GATM is in good condition and that the hardware version of the new GATMis consistent with that of the faulty GATM.
Step 7 Install a new GATM. Hold the panel of the new GATM module with one hand and the bottomof the module with the other hand, and push it into the cabinet along the guide rail. Then, tighten
the screws on the mounting ears at the two sides of the module.
Step 8 Connect the cables to the ports on the new GATM panel based on the labels.
BTS3900 GSM
Site Maintenance Guide 5 Replacing the BTS3900 Components
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
5-21
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
50/55
Step 9 Set the power switch on the DCDU that corresponds to the new GATM to ON.
----End
Postrequisite1. Ensure that the RUN LED on the GATM panel is green and blinks slowly at 0.5 Hz after
the GATM is powered on.
2. Check that the related alarms on the M2000 or LMT are cleared after the GATM is powered
on.
3. Record the bar code, name, and PCB version of the faulty board.
4. Check whether there is obvious physical damage to the board. The damage may be burned
PCB, burned components, distorted connectors, bent pins, or broken pins.
5. Record the fault information, such as the cause, symptom, and site name.
6. Put the board into the ESD bag, and then put the bag into the board box. Keep it properly.
7. Contact the local Huawei office to dispose of the faulty board.
5.7 Replacing an RFU
The RFU is an RF filter unit, which is located in the RFC. Replacing an RFU disrupts all the
services carried on the RFU.
Prerequisite
l The model of the faulty RFU is confirmed, and a new RFU of the same model is ready.
l
The new RFU is intact, and its hardware version is consistent with that of the faulty RFU.l The tools and materials, such as an ESD wrist strap or a pair of ESD gloves, Phillips
screwdriver, ESD box or bag, dustfree cloth, RFU handle, key to the cabinet door, and
torque wrench, are ready.
Context
It takes about 6 to 10 minutes to replace an RFU, which involves disconnecting the cables,
removing screws, removing the faulty RFU, inserting a new RFU, tightening the screws,
connecting the cables to the new RFU, and loading software.
WARNING
l Take proper ESD protection measures, for example, wear an ESD wrist strap or a pair of
ESD gloves, to prevent electrostatic damage to the boards, modules, or electronic
components.
l The RFU is heavy. Therefore, handle it with caution.
Procedure
Step 1 Locate the faulty RFU, and then run the BLK BRD command on the LMT to block the faultyRFU.
5 Replacing the BTS3900 Components
BTS3900 GSM
Site Maintenance Guide
5-22 Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
Issue 02 (2009-09-30)
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
51/55
NOTE
Although this step can be performed either remotely or locally, you are advised to perform this step
remotely.
Step 2 Power off the RFU by setting the power switch on the DCDU-01 that corresponds to the faultyRFU to OFF.
Step 3 Remove the power cable of the faulty RFU, and then attach a temporary label to the cable.
Step 4 Use a torque wrench to loosen the DIN 7/16 male elbow connector of the RF jumper, removethe RF jumper, and then attach a temporary label to the jumper.
Step 5 Remove the CPRI cable from the RFU, and then attach a temporary label to the cable.
CAUTION
When removing the CPRI cable, do not look directly at the optical fiber. Otherwise, your eyes
may be hurt.
Step 6 Use a Phillips screwdriver to loosen the four screws on the RFU panel.
Step 7 Insert the standard handle delivered with the BTS into the lockhole at the center part of the RFUpanel. Turn the standard handle outwards by 90, and then pull out the module by holding the
standard handle firmly with one hand. Support the bottom of the the module with the other hand,
and then remove the module until it is completed removed from the subrack, as shown in Figure
5-12.
BTS3900 GSM
Site Maintenance Guide 5 Replacing the BTS3900 Components
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
5-23
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
52/55
Figure 5-12 Removing an RFU
Step 8 Place the faulty RFU in an ESD box.
Step 9 Place the new RFU on the corresponding guide rails, and then slide it along the rails until it isin position.
Step 10 Tighten the four captive screws at the four corners of the RFU to install the RFU securely onthe subrack.
Step 11 Insert the connector into the CPRI0 or CPRI1 port on the RFU according to the temporary labelon the CPRI cable.
Step 12 Fix the DIN 7/16 male elbow connector of the RF jumper to the ANT port on the RFU. Then,use a torque wrench to secure the DIN male elbow connector with the torque specification of
25 Nm to 35 Nm.
Step 13 Install the power cable of the RFU, and then tighten the screws.
Step 14 Set the corresponding DC output power switch on the panel of the DCDU to ON to power onthe RFU.
Step 15 Activate the RFU BootROM or software version.
1. Run the DSP BRDVERcommand to query the BootROM and software versions of the
new RFU.
2. If the software version is incorrect, run the ACT SOFTWARE command to reactivate the
BootROM or software version of the new RFU.
5 Replacing the BTS3900 Components
BTS3900 GSM
Site Maintenance Guide
5-24 Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
Issue 02 (2009-09-30)
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
53/55
Step 16 Run the UBL BRD command to unblock the RFU. Perform this step locally or remotely inaccordance with the way used in step 1 at the beginning of this procedure. That is, perform this
step locally if step 1 is performed locally.
----End
Postrequisite
1. Clear related alarms, if any, according to the alarm handling suggestions.
2. Check that the new RFU can provide the services properly.
3. Record the bar code, name, and PCB version of the faulty module.
4. Check whether there is obvious physical damage, for example, mechanical parts or plug-
ins are distorted, pins are bent or lost, or the PCB or components are burned.
5. Record the fault information, such as the cause, symptom, site name of the faulty module,
and slot number.
6. Place the faulty RFU into an ESD box and store it properly.
7. Contact the local Huawei office to handle the faulty RFU.
5.8 Replacing the BTS3900 Power Subrack
The power subrack is located in the lower part of the BTS3900 cabinet. It houses PSUs and PMU
and provides power input and output ports. It takes about 25 minutes to replace a power subrack.
Prerequisite
l The type of the faulty power subrack is confirmed and the new power subrack is ready.
l The tools and materials, such as an ESD wrist strap, Phillips screwdriver, ESD box or bag,
and key to the cabinet door, are ready.
Context
CAUTION
Take proper ESD protection measures, for example, wear an ESD wrist strap or a pair of ESDgloves, to prevent electrostatic damage to the boards, modules, or electronic components.
Procedure
Step 1 Power off the BTS3900.
Step 2 Record the connections of the cables on the panels of the power supply subrack and PMU, andthen disconnect the cables.
Step 3 Loosen the screws on the panel of the PMU/PSU in the power supply subrack, as shown inFigure 5-13.
BTS3900 GSM
Site Maintenance Guide 5 Replacing the BTS3900 Components
Issue 02 (2009-09-30) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
5-25
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
54/55
Figure 5-13 Removing the PMU/PSU
(1) Screws on the panel of the PMU (2) PMU (3) Power subrack
NOTE
Figure 5-13 takes the PMU for example. The positions of the two screws on the panel of the PSU are the
same as those on the panel of the PMU.
Step 4 Remove the faulty PMU or PSU along the guide rails by pulling the ejector lever on the panelof the PMU/PSU, as shown in Figure 5-13.
Step 5 Repeat Step 3 through Step 4 to remove all the PMU and PSUs in the power subrack, and thenput the removed PMU and PSUs into the ESD box or bag.
Step 6 Remove the four M6x12 screws from the mounting ears for the power subrack, as shown inFigure 5-14.
5 Replacing the BTS3900 Components
BTS3900 GSM
Site Maintenance Guide
5-26 Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
Issue 02 (2009-09-30)
7/30/2019 BTS3900 GSM Site Maintenance Guide-(V300R008&R009_02)
55/55
Figure 5-14 Removing the screws from the mounting ears
Step 7 Pull the power subrack with one hand, and then hold the power subrack with the other hand untilit is removed.
Step 8 Put the removed power subrack into the ESD box or bag.
Step 9 Unpack the new power subrack, and then reversely perform the previous steps to install the newpower subrack and removed PMU and PSUs into the cabinet.
Step 10 Connect the removed cables to the ports on the panels of the power subrack and PMU accordingto the previous records.
Step 11 Power on the BTS3900.
----End
Postrequisite
After replacing the power subrack, perform the following operations:
l Check the cable connections and ensure that the cables are correctly and securely connected.
l Check on the M2000 or LMT that the related alarms are cleared after power-on.
l Contact the local Huawei office to handle the faulty power subrack.
BTS3900 GSM
Site Maintenance Guide 5 Replacing the BTS3900 Components