Building Enclosure DesignFundamentals, Components, and Assemblies

COLIN SHANE M.ENG., P.ENG., P.E.

PRINCIPAL, SENIOR PROJECT MANAGER

RDH BUILDING SCIENCE INC.

Disclaimer: This presentation was developed by a third party and is not funded by WoodWorks or the Softwood Lumber Board.

JULY 11, 2018

This presentation is protected by US and International Copyright laws. Reproduction, distribution, display and use of the presentation without written

permission of the speaker is prohibited.

© RDH Building Sciences Inc. 2015

Copyright Materials

“The Wood Products Council”is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES), Provider #G516.

Credit(s) earned on completion of this course will be reported to AIA CES for AIA members. Certificates of Completion for both AIA members and non-AIA members are available upon request.

This course is registered with AIA CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product.__________________________________

Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.

Course Description

à Building enclosures are responsible for controlling heat flow, air flow, vapor flow and a number of other elements. Through a combination of building science fundamentals and current research, this presentation will explore design considerations associated with wood-frame building enclosures and the role of control layers. Discussion will focus on best practices for designing durable, energy-efficient enclosures using traditional light wood-frame construction.

Learning Objectives

à Review building science fundamentals and building enclosure design considerations for light wood-frame buildings.

à Explore the role of control layers in building enclosures for elements such as heat flow, bulk water intrusion and air flow.

à Discuss best practices for light wood-frame building enclosure design, detailing, and construction techniques.

à Explore the thermal benefits of utilizing wood-frame construction.

6 of 97

Basics

Water

Air

Heat

BACKGROUND

Walls

Low-slope Roofs

Steep-slope Roofs

BEST PRACTICES

CLT

Deep Energy Retrofit

CASE STUDIES

Roadmap

7 of 63

Wood-frame Building Enclosure Design Guides

à 2011 Building Enclosure Design

Guide – Wood-frame Multi-Unit

Residential Buildings

à Emphasis on best practices,

moisture and new energy codes

à 2013 Guide for Designing Energy-

Efficient Building Enclosures

à Focus on highly insulated wood-

frame assemblies to meet current

and upcoming energy codes

à CLT Handbook

8 of 63

à Supportà Structural loads

à Controlà Heat flow

à Air flow

à Vapor diffusion

à Water penetration

à Condensation

à Light and solar radiation

à Noise, fire, and smoke

à Finishà Being durable and maintainable

à Being economical & constructible

à Looking good!

Building Enclosure Design Fundamentals

9 of 63

The Old Way

10 of 63

The New Way – “Light & Tight”

11 of 63

Trends in Building Enclosure Design

à Trend towards more energy

efficiently building enclosures

à Air barriers now required in

2012 IECC

à Continuous insulation

becoming more common à More insulation = less heat

flow to dry out moistureà “Marginal” assemblies that

worked in the past may no

longer work

à Need to fully understand the science and interaction of design parameters

12 of 97

What do we know?

Building Enclosure

Control Air

Control Vapor

Control heat

Control Rain

13 of 63

Basics

Water

Air

Heat

BACKGROUND

Walls

Low-slope Roofs

Steep-slope Roofs

BEST PRACTICES

CLT

Deep Energy Retrofit

CASE STUDIES

Roadmap

14 of 63

How do Walls get Wet and Dry?

15 of 63

Building Science: Wetting and Drying

à How can we keep the sheathing and other materials dry?

à Don’t let them get as wet

à Create air space to promote drying

à Design for vapor diffusion drying

à Keep sheathing warm

Drying

WettingSafe Storage Capacity

16 of 63

Water Penetration Control Strategies

17 of 63

Rainscreen Cladding

18 of 63

Rainscreen Cladding - Stucco

19 of 63

Basics

Water

Air

Heat

BACKGROUND

Walls

Low-slope Roofs

Steep-slope Roofs

BEST PRACTICES

CLT

Deep Energy Retrofit

CASE STUDIES

Roadmap

20 of 63

à Code requirement

à Moistureà Air holds moisture that can be

transported and deposited

within assemblies.

à Energyà Unintentional airflow through

the building enclosure can

account for as much as 50%

of the space heat loss/gain in

buildings.

Air Penetration Control – Why?

21 of 63

Types of Air Barrier Systems

Sealed Gypsum Sheathing –Sealant Filler at Joints

Loose Sheet Applied Membrane –Taped Joints & Strapping

Liquid Applied – Silicone sealants and silicone membrane at Joints

Sealed Plywood Sheathing –Sealant & Membrane at Joints

Sealed Sheathing –Membrane at Joints

Self-Adhered vapor permeable membrane

Plywood sheathing with taped joints (good tape)

22 of 63

Airtightness Does Not Happen By Accident

23 of 63

How to Tell the Membrane is Not the Air Barrier

24 of 63

Definitely Not An Air Barrier… But What Is?

25 of 63

Testing Air Barrier Systems

26 of 63

Basics

Water

Air

Heat

BACKGROUND

Walls

Low-slope Roofs

Steep-slope Roofs

BEST PRACTICES

CLT

Deep Energy Retrofit

CASE STUDIES

Roadmap

27 of 63

ClimateZone

IECC 2015Above Grade Walls:

Min. Eff. R-value

Steel Wood

7 15.6 / 19.2 19.6

6 15.6 / 17.5 19.6

5 & 4C 15.6 15.6

4 A/B 15.6 15.6

3 15.6 15.6

2 13.0 / 15.6 15.6

1 13.0 15.6

Based on Maximum Effective Assembly U-value Tables (C402.1.2 (2012), C402.1.4 (2015))

Residential Building R-values buildings similar or in some cases slightly higher

Targets for Walls in Comm/Res Buildings

28 of 63

Conductive Heat Loss Control

29 of 63

Conductive Heat Loss Control

à Insulation between studs is most common heat control strategy

à Need to consider effective R-values

à Wood ± R-1 per inch

à “Continuous insulation” may be required in some climate zones per IECC

30 of 63

0

2

4

6

8

10

12

14

16

18

20

22

24

0 5 10 15 20 25 30 35 40

Overa

ll E

ffect

ive R

-Valu

e (

oF f

t2h

r/Btu

)

Framing Factor %

Steel 2x6 StudSteel 3 5/8 Stud

Wood 2x6 Stud

Wood 2x4 Stud

Framing Effect on R-values

Fram

ing @

16”

o.c

.

31 of 97

Insulation Placement

à Consider effective thermal resistance, vapor diffusion

profile, and relative durability

32 of 97

The Old WayThe Standard Approach

à Assembly

à ½” gyp

à 2x6 @ 16” o.c.

à R-20 high density insulation

à ½” sheathing

à WRB/furring/cladding

à Standard framing factor

à 77% cavity, 23% framing

à U-0.064

à R-15.6

33 of 97

à Assembly

à ½” gyp

à 2x8 @ 16” o.c.

à R-30 high density insulation

à ½” sheathing

à WRB/furring/cladding

à Standard framing factor

à 77% cavity, 23% framing

à U-0.045

à ± R-22.0

New Option #1Higher R-Values - Option #1

34 of 97

à Assembly

à ½” gyp

à 2x6 @ 16” o.c.

à R-21 high density insulation

à ½” sheathing / WRB

à 1” insulation (R-4.2 cont.)

à Furring/cladding

à Standard framing factor

à 77% cavity, 23% framing

à U-0.046

à ± R-22

Higher R-Values - Option #2

35 of 97

So, What’s the Difference?

R-22 R-22

36 of 97

Exterior Insulation Selection (Vapor Control)

à Rigid exterior foam insulations (XPS, EPS,

Polyiso, closed cell SPF) are vapor

impermeable

à Rules of thumb: Vapor barrier on ‘warm’ side

à Fibrous insulations (mineral fiber / glass

fiber) are vapor permeable

à Allows drying to the exterior

à Often safer in cold and mixed climates

à Vapor permeance properties of WRB/air

barrier membrane is also very important

37 of 97

Building Science: Wetting and Drying

à How can we keep the sheathing and other materials dry?

à Don’t let them get as wet

à Create air space to promote drying

à Design for vapor diffusion drying

à Keep sheathing warm

Drying

WettingSafe Storage Capacity

38 of 63

Basics

Water

Air

Heat

BACKGROUND

Walls

Low-slope Roofs

Steep-slope Roofs

BEST PRACTICES

CLT

Deep Energy Retrofit

CASE STUDIES

Roadmap

39 of 97

The ‘Perfect’ Assembly

à Rain penetration control: rainscreen cladding

over water barrier

à Air leakage control: robust air barrier system

à Heat control: continuous insulation layer

à Locate all barriers exterior of structure

à Keep structure warm and dry

à 50+ year old concept!

40 of 97

Wood-Frame Assemblies – ‘Perfect’ Wall

41 of 97

Wood-Frame Assemblies – ‘Perfect’ Roof

42 of 63

Wall-to-Roof Detail

43 of 63

Details – Continuity of Control Layers

à In practice, need to evaluate and design assemblies and details that are not ‘perfect’

à Continuity of control layers within and between assemblies is critical

44 of 63

Basics

Water

Air

Heat

BACKGROUND

Walls

Low-slope Roofs

Steep-slope Roofs

BEST PRACTICES

CLT

Deep Energy Retrofit

CASE STUDIES

Roadmap

45 of 63

Cross Laminated Timber – Ronald McDonald House

46 of 97

CLT – Construction Moisture

à Keep it dry during construction – as best as possible

47 of 63

CLT – Wall Assemblies

48 of 63

Roof Assembly

R-40+ Conventional Roof Assembly – 2 ply SBS, 4” Stonewool, 4” Polyiso, Protection board, Tapered EPS (0-8”), Torch applied Air/Vapor Barrier(Temporary Roof), ¾” Plywood, Ventilated Space (To Indoors), CLT Roof Panel Structure (Intermittent)

49 of 63

à Get the architect to take the final photos

CLT Considerations

50 of 63

Basics

Water

Air

Heat

BACKGROUND

Walls

Low-slope Roofs

Steep-slope Roofs

BEST PRACTICES

CLT

Deep Energy Retrofit

CASE STUDIES

Roadmap

51 of 63

à Moisture damage at walls

and windows

à Concealed barrier stucco

cladding

à Vented low-slope roof

assembly

à Energy efficient

rehabilitation of wall,

window, and roof

assemblies

Deep Energy Retrofit

52 of 63

5-Storey Wood-frame w/ Exterior Insulation

53 of 63

New Exterior Wall Assembly

54 of 63

New Sloped Roof / Overhang Assembly

55 of 63

New Low-Slope Roof Assembly

56 of 63

Completed Building Enclosure

57 of 97

Summary

à Control moisture, air, and heat

à Best practices:

à Drained & ventilated claddingà Keep structure warm and dry:

control layers on exterior

à ‘Less than perfect’ practices:

à Analyze and understand wetting / drying balance

à Provide continuity of control layers

within and between assemblies and

details

This concludes The American Institute of Architects Continuing Education Systems Course

Colin Shane – cshane@rdh.comwww.rdh.com

59 of 63

à rdh.com

Discussion + Questions

Colin Shane – cshane@rdh.com