Business Function

Post on 16-Jan-2016

22 views 0 download

Tags:

description

Business Function. Business Cycle and Process. BUSINESS CYCLE BUSINESS FUNCTION BUSINESS LEVEL. Business Cycle. Opportunity Feasibility Engineering Design Construction Operation and Maintenance. BUSINESS FUNCTION. SDM. MARKETING. PRODUKSI. FINANCE. Marketing. - PowerPoint PPT Presentation

transcript

1

Business Function

18/07/2002

2

Business Cycle and Process

BUSINESS CYCLE BUSINESS FUNCTION BUSINESS LEVEL

18/07/2002

3

Business Cycle

Opportunity

Feasibility

Engineering Design

Construction

Operation and Maintenance

18/07/2002

4

BUSINESS FUNCTION

SDMMARKETING PRODUKSI

FINANCE

18/07/2002

5

Marketing Identification of Need

STP

Deliver product/service to customer

Marketing Mix

Sales Transaction

18/07/2002

6

Marketing Function Identifikasi Kebutuhan

Jenis Produk/jasa Konsumen Spesifikasi Daya Beli Volume Saluran Distribusi

Penyampaian Produk/jasa Marketing Mix

Product Price Promotion Place

MarketingPlan

18/07/2002

7

Identifying Customer Needs Gathering Information From

Customers Interview, Focus Group, Customer

Survey, and Customer Complaint

Constructing Survey Instrument

Evaluating Customer Needs

18/07/2002

8

Customer Requirements

Expecters Basic attributes that one would

expect to see in the product

Spokens Specific features that customer

defines the product in terms of these attributes that one would expect to see in the product

18/07/2002

9

Customer Requirements

Unspokens Specific Features That Customers

Say They Want in the Product.

Exiters Product Features That Make the

Product Unique and Distinguish It From the Competition

18/07/2002

10

Quality Function Deployment

A Planning and Problem Solving Tool for Translating Customer

Requirements Into the Engineering Characteristics of

Product ( Engineering Parameters)

18/07/2002

11

5Correlation Matrix

4Engineering Characteristic

6Relationship Matrix

7. Absolute Importance

8. Relative Importance

9. Technical Competitive Assessment

10. Technical Difficulty

11. Target Value

1CustomerReq’ment

“What?”

2CompetitiveAssessment

3Impor-tance

Rating

18/07/2002

12

PRODUCTION/OPERATION

MENGHASILKAN PRODUK SESUAI DENGAN PERMINTAAN

KONSUMEN

ENGINEERINGMANUFACTURING

PRODUCTION MANAGEMENT

18/07/2002

13

Manufacturing Function

Marketing Engineering

FabricationProduction

Management

18/07/2002

14

Produk

Consumer Industrial

18/07/2002

15

Product Start-up Growth Stable Decline

Volume Low Increasing High DecliningVariety Unique Inc.Standard Emergence High Standard Dom. Design Process Technology Organization Project Small Batch Line flow Line flow Job shop Assembly AssemblyInnovation High Medium Medium LowIntegration Low Medium Medium High

Industry Structure Small Consolidation Few large Survivor competitor and fallout competitor Competitive Flexibility Quality and Price(cost) Price(cost) Priority Flexibility Delivery

Product and ProcessTechnology Life Cycles

18/07/2002

16

Engineering

Design Product’s Blue Print According To Customer’s

Demand

Product DesignProcess PlanningProduct Planning

Method Engineering

18/07/2002

17

Quality ?

Fitness for Use Conform To Specification

18/07/2002

18

Dimension of Quality for Manufactured Product

Performance Features

Reliability Durability

Serviceability Conformance

Aesthetics Perceived Quality

18/07/2002

19

Fabrication

Make Product According to the Blue Print From Engineering

Production ControlProcess ControlQuality Control

Facilities Control

18/07/2002

20

Production Management

Support Manufacturing In Order To Fulfill the Customer’s

Demand

Production Planning And Control Inventory Control

18/07/2002

21

SIKLUS FABRIKASIPemasaran &

PenjualanPerancangan

ProdukPerencanaan

Proses

Pengendalian Persediaan

Perencanaan dan

Pengendalian Produksi

Metoda Kerja, Waktu Standar dan perbaikan Produktivitas

Pembuatan Penerimaan

Pengiriman

Pengiriman

PEMASOK

KONSUMEN

Pengendalian Kualitas

Pengendalian Produksi

Pengendalian Proses

Pengendalian Peralatan

18/07/2002

22

FINANCE

MENGELOLA ALIRAN DANA AGAR TERJAMIN KETERSEDIAANNYA

FINANCIAL SOURCINGPLANNING AND BUGEDTING

AUDITING AND CONTROLLING

18/07/2002

23

SDMMENJAMIN KETERSEDIAAN

TENAGA KERJA SESUAI DENGAN KEBUTUHAN

RECRUITMENTTRAINING

PLACEMENTREWARD AND PROMOTION

RETIREMENT

18/07/2002

24

POSISI PRODUKSI/OPERASI

MARKETING PRODUCTION MARKETING

NEEDS IDENTIFICATION DELIVERY

18/07/2002

25

BUSINESS LEVELCORPORATE STRATEGY

BUSINESS STRATEGY

FUNCTIONAL STRATEGY

OPERATION MANAGEMENT

18/07/2002

26

MANAGEMENT LEVEL

CORPORATE/BUSINESS

BUSINESS/FUNCTIONAL

OPERATIONAL

18/07/2002

27

TIME FRAME

OPERATIONAL FUNCTIONAL BUSINESS CORPORATE

18/07/2002

28

CORPORATE STRATEGY SCOPE : CORPORATE/ ENTERPRISE OBJECTIVES : GROWTH PERFORMANCE : ROI/RONA/ROE….. FORMULATION :

PENETRATION MARKET DEVELOPMENT PRODUCT DEVELOPMENT DIVERSIFICATION

18/07/2002

29

ANSOFF STRATEGY

EXISTING NEW

NEW

EXISTING

PENETRATION PROD. DEV

MARKT. DEV DIVERSIVICATION

18/07/2002

30

BUSINESS STARTEGY

SCOPE : SBU OBJECTIVE : COMPETITIVENESS PERFORMANCE : MARKET

SHARE FORMULATION:

COST LEADERSHIP DIFFERENTIATION FOCUS

18/07/2002

31

Competitive Model

AmongIndustry Substitute

Buyer

New Entrance

Supplier

18/07/2002

32

Porter’s Business Strategy

Cost Leadership Differentiation Focus

Cost Differentiation

18/07/2002

33

FUNCTIONAL STRATEGY

SCOPE : BUSINESS FUNCTION OBJECTIVE : COMPETITIVE

PRIORITY PERFORMANCE :

TARGET COST

18/07/2002

34

OPERATION STRATEGY SCOPE :

PRODUCTION/OPERATION OBJECTIVE : COMPETITIVE

PRIORITY PERFORMANCE :

QUALITY COST DELIVERY FLEXIBILITY SAFETY

18/07/2002

35

CONTOH TUJUAN OPERASI

QUALITY

TAHUN INI 5 TAHUN YAD KOMPETITOR

Kepuasan konsumen 75 % 85 % 75 %

Persentase scrapdan reject 15 % 5 % 10 %

Biaya garansi ( % penjualan) 1 % 0.5 % 1%

COST

COGM ( % COGS ) 55 % 45 % 50%

ITO 41 x 52 x 50 x

18/07/2002

36

CONTOH TUJUAN OPERASI

DELIVERY

TAHUN INI 5 TAHUN YAD KOMPETITOR

Fill Rate 90% 95% 95%

Lead Time (minggu ) 3 1 1

FLEXIBILITYWaktu untuk 10 bulan 6 bulan 8

bulanmengenalkan produk baruWaktu perubahan kapasitas 3 bulan 3 bulan 3

bulan18/07/2002

37

OPERATION MANAGEMENT

SCOPE : PRODUCTION/OPERATION

OBJECTIVE : EFFICIENCY PERFORMANCE:

QUALITY COST DELIVERY FLEXIBILITY

18/07/2002

38

FAKTOR PRODUKSI

MANUASIA MESIN MATERIAL MANAJEMEN MODAL

18/07/2002

39

KOMPETENSI

TEKNIKALMANAJERIAL . KERJA SAMA

. LEADERSHIP . ADAPTIF . CREATIVE

18/07/2002