Post on 04-Aug-2018
transcript
CAODC LEVEL III INSPECTION CHECKLIST
Edition #3 09/2016 1 of 3
COMPANY: DATE OF INSPECTION: INSPECTED BY:
RIG #: MODEL: MANUFACTURER:
MASTS SHEAVES OK REPAIR N/A 1. Groove wear in sheaves
2. Check sheaves for cracks
3. Warped
4. Water table condition
5. Side play in sheave
6. Crown pillars
7. Crown hand railings
8. Fall protection anchor point(s)
9. Guy line anchors
10. Winch line/rod transfer sheaves
11. Tong line anchor
COMMENTS:
TOP SECTION OK REPAIR N/A 1. Anchor point for rod transfer
2. Anchor point for tong sheave
3. Anchor point for rod basket
4. Main supports
5. Cross members
6. Locking pins
7. Condition of ladder
COMMENTS:
ROD BASKET OK REPAIR N/A
1. Frame
2. Fingers
3. Pin condition
4. Safety chains or cables
COMMENTS:
MONKEYBOARD OK REPAIR N/A 1. Frame condition
2. Fingers condition
3. Pin condition
4. Safety chains
5. Handrails
6. Sheave anchors
COMMENTS:
LOWER SECTION OK REPAIR N/A 1. Locking pin saddle
2. Anchor point for monkey board
3. Chain for hanging blocks
4. Stand pipe brackets
5. Kelly hose safety chained
6. Main supports
7. Cross members8. Raising ram anchor points (remove pins to
inspect) 9. Raising ram pins (remove pins to inspect)
10. Anchor points for scoping ram
11. Floor brackets
12. Tong anchor
13. Winch anchor point
14. Block plate
15. Condition of ladder
16. Manufacturers rating plate
COMMENTS:
TURNBUCKLES OK REPAIR N/A 1. Adjuster condition
2. End connection pin hole
3. End connection threads
COMMENTS:
HYDRAULICS OK REPAIR N/A 1. Hydraulic system
2. Raising ram condition
3. Hose and hose ends
4. Connections
5. Pins and bolts
6. Ram flow restrictor
COMMENTS:
TRUNION OK REPAIR N/A 1. Arms
2. Locks
3. Slides
4. A-base
COMMENTS:
BOOM OK REPAIR N/A 1. Condition
2. Sheaves
3. Anchor points
4. Stoppers
COMMENTS:
SUBSTRUCTURES OK REPAIR N/A 1. Attachment lugs
2. Mast shoes (radius base beam)
3. Table spreader beams
4. Setback beams
5. Spreader legs
6. Pins
7. BOP carrier
8. Condition of welds
9. Condition of decking
COMMENTS:
OVERHEAD EQUIPMENT BLOCKS OK REPAIR N/A 1. Top bolt covers
2. Main sheave bolt
3. Retaining pins
4. Sheave grooves
Make: Model:
Serial #: Equip.#:
Inspection Date: Insp. Comp.:
Insp.#: Tonnage:
COMMENTS:
HOOK AND/OR BECKET OK REPAIR N/A 1. Check hook/becket bolts
2. Check eyewear on hook/becket
3. Check eyewear for rod clevis
4. Does spring seem tight
5. Swivel hook to check bearing
6. Hook latching mechanism
7. If weights added, check welds
8. Shank gap
Make: Model:
Serial #: Equip.#:
Inspection Date: Insp. Comp.:
Insp.#: Tonnage:
COMMENTS:
LIFTING NUBBINS – 60.3 MM OK REPAIR N/A 1. Threads
2. Body
3. Welds
Make: Model:
Serial #: Equip.#:
Inspection Date: Insp. Comp.:
Insp.#: Tonnage:
COMMENTS:
LIFTING NUBBINS – 73.0 MM OK REPAIR N/A 1. Threads
2. Body
3. Welds
Make: Model:
Serial #: Equip.#:
Inspection Date: Insp. Comp.:
Insp.#: Tonnage:
COMMENTS:
SERIAL #:
OK REPAIR N/A 1. Threads
2. Body
3. Welds
Make: Model:
Serial #: Equip.#:
Inspection Date: Insp. Comp.:
Insp.#: Tonnage:
COMMENTS:
TUBING ELEVATORS – 60.3 MM OK REPAIR N/A 1. Check latch pin
2. Check spring
3. Check latch
4. Check elevator body
5. Check hinge pin
6. Check keeper pin
Make: Model:
Serial #: Equip.#:
Inspection Date: Insp. Comp.:
Insp.#: Tonnage:
COMMENTS:
TUBING ELEVATORS – 73.0 MM OK REPAIR N/A 1. Check latch pin
2. Check spring
3. Check latch
4. Check elevator body
5. Check hinge pin
6. Check keeper pin
Make: Model:
Serial #: Equip.#:
Inspection Date: Insp. Comp.:
Insp.#: Tonnage:
COMMENTS:
TUBING ELEVATORS – 88.9 MM OK REPAIR N/A 1. Check latch pin
2. Check spring
3. Check latch
4. Check elevator body
5. Check hinge pin
6. Check keeper pin
Make: Model:
Serial #: Equip.#:
Inspection Date: Insp. Comp.:
Insp.#: Tonnage:
COMMENTS:
TUBING ELEVATORS – 114.0 MM OK REPAIR N/A 1. Check latch pin
2. Check spring
3. Check latch
4. Check elevator body
5. Check hinge pin
6. Check keeper pin
Make: Model:
Serial #: Equip.#:
Inspection Date: Insp. Comp.:
Insp.#: Tonnage:
COMMENTS:
TUBING ELEVATORS – 139.7 MM OK REPAIR N/A 1. Check latch pin
2. Check spring
3. Check latch
4. Check elevator body
5. Check hinge pin
6. Check keeper pin
Make: Model:
Serial #: Equip.#:
Inspection Date: Insp. Comp.:
Insp.#: Tonnage:
COMMENTS:
LIFTING NUBBINS – 88.9 MM
CAODC LEVEL III INSPECTION CHECKLIST
Edition #3 09/2016 2 of 3
ROD ELEVATORS: 1 OK REPAIR N/A 1. Insert size:
2. Check springs
3. Check rod release springs
4. Check elevator bail
5. Snap rings in place
6. Insert condition
7. All screws in insert
8. Check elevator body
9. Check safety latch
10. Are latch inserts worn
Make: Model:
Serial #: Equip.#:
Inspection Date: Insp. Comp.:
Insp.#: Tonnage:
COMMENTS:
ROD ELEVATORS: 2 OK REPAIR N/A 1. Insert size:
2. Check springs
3. Check rod release springs
4. Check elevator bail
5. Snap rings in place
6. Insert condition
7. All screws in insert
8. Check elevator body
9. Check safety latch
10. Are latch inserts worn
Make: Model:
Serial #: Equip.#:
Inspection Date: Insp. Comp.:
Insp.#: Tonnage:
COMMENTS:
ROD ELEVATORS: 3 OK REPAIR N/A 1. Insert size:
2. Check springs
3. Check rod release springs
4. Check elevator bail
5. Snap rings in place
6. Insert condition
7. All screws in insert
8. Check elevator body
9. Check safety latch
10. Are latch inserts worn
Make: Model:
Serial #: Equip.#:
Inspection Date: Insp. Comp.:
Insp.#: Tonnage:
COMMENTS:
ROD ELEVATORS: 4 OK REPAIR N/A Insert size:
2. Check springs
3. Check rod release springs
4. Check elevator bail
5. Snap rings in place
6. Insert condition
7. All screws in insert
8. Check elevator body
9. Check safety latch
10. Are latch inserts worn
Make: Model:
Serial #: Equip.#:
Inspection Date: Insp. Comp.:
Insp.#: Tonnage:
COMMENTS:
ROD ELEVATORS: 5 OK REPAIR N/A Insert size:
2. Check springs
3. Check rod release springs
4. Check elevator bail
5. Snap rings in place
6. Insert condition
7. All screws in insert
8. Check elevator body
9. Check safety latch
10. Are latch inserts worn
ROD ELEVATORS: 5 - CONTINUED
Model:
Serial #: Equip.#:
Inspection Date: Insp. Comp.:
Insp.#: Tonnage:
COMMENTS:
ROD ELEVATORS: 6 OK REPAIR N/A 1. Insert size:
2. Check springs
3. Check rod release springs
4. Check elevator bail
5. Snap rings in place
6. Insert condition
7. All screws in insert
8. Check elevator body
9. Check safety latch
10. Are latch inserts worn
Make: Model:
Serial #: Equip.#:
Inspection Date: Insp. Comp.:
Insp.#: Tonnage:
COMMENTS:
ROD ELEVATORS: 7 OK REPAIR N/A 1. Insert size:
2. Check springs
3. Check rod release springs
4. Check elevator bail
5. Snap rings in place
6. Insert condition
7. All screws in insert
8. Check elevator body
9. Check safety latch
10. Are latch inserts worn
Make: Model:
Serial #: Equip.#:
Inspection Date: Insp. Comp.:
Insp.#: Tonnage:
COMMENTS:
ROD ELEVATORS: 8 OK REPAIR N/A 1. Insert size:
2. Check springs
3. Check rod release springs
4. Check elevator bail
5. Snap rings in place
6. Insert condition
7. All screws in insert
8. Check elevator body
9. Check safety latch
10. Are latch inserts worn
Make: Model:
Serial #: Equip.#:
Inspection Date: Insp. Comp.:
Insp.#: Tonnage:
COMMENTS:
ROD TRANSFER: 1 OK REPAIR N/A 1. Transfer size:
2. Check D-ring
3. Check i-bolt
4. Check transfer body
5. Check bearing
Make: Model:
Serial #: if applicable Equip.#:
Inspection Date: Insp. Comp.: if applicable
Tonnage: Insp.#: if applicable
COMMENTS:
ROD TRANSFER: 2 OK REPAIR N/A 1. Transfer size:
2. Check D-ring
3. Check i-bolt
4. Check transfer body
5. Check bearing
Make:
Serial #: if applicable Equip.#:
Inspection Date:
ROD TRANSFER: 2 - CONTINUED
Tonnage: Insp.#: if applicable
COMMENTS:
ROD TRANSFER: 3 OK REPAIR N/A 1. Transfer size:
2. Check D-ring
3. Check i-bolt
4. Check transfer body
5. Check bearing
Make: Model:
Serial #: if applicable Equip.#:
Inspection Date: Insp. Comp.: if applicable
Tonnage: Insp.#: if applicable
COMMENTS:
ROD TRANSFER: 4 OK REPAIR N/A 1. Transfer size:
2. Check D-ring
3. Check i-bolt
4. Check transfer body
5. Check bearing
Make: Model:
Serial #: if applicable Equip.#:
Inspection Date: Insp. Comp.: if applicable
Tonnage: Insp.#: if applicable
COMMENTS:
ROD TRANSFER: 5 OK REPAIR N/A 1. Transfer size:
2. Check D-ring
3. Check i-bolt
4. Check transfer body
5. Check bearing
Make: Model:
Serial #: if applicable Equip.#:
Inspection Date: Insp. Comp.: if applicable
Tonnage: Insp.#: if applicable
COMMENTS:
ROD TRANSFER: 6 OK REPAIR N/A 1. Transfer size:
2. Check D-ring
3. Check i-bolt
4. Check transfer body
5. Check bearing
Make: Model:
Serial #: if applicable Equip.#:
Inspection Date: Insp. Comp.: if applicable
Tonnage: Insp.#: if applicable
COMMENTS:
BAILS OK REPAIR N/A 1. Check for cracks
2. Check for scarring
3. Check ears for gouging
Make: Model:
Serial #: Equip.#:
Inspection Date: Insp. Comp.: if applicable
Insp.#: Tonnage:
COMMENTS:
ROD LOAD CLEVIS OK REPAIR N/A 1. Check for wear
2. Check pins & bolts for wear
3. Safety/cotter pins in place
Make: Model:
Serial #: Equip.#:
Inspection Date: Insp. Comp.: if applicable
Insp.#: Tonnage:
COMMENTS:
ROD HOOK OK REPAIR N/A 1. Rotate hook to check swivel
2. Rod hook safety latch
3. Hook wear
4. Safety guard over latch release
5. Bail wearInsp. Comp.: if applicable
Make:
1.
Model:
CAODC LEVEL III INSPECTION CHECKLIST
Edition #3 09/2016 3 of 3
ROD HOOK - CONTINUED
Make: Model:
Serial #:
Inspection Date:
Equip.#:
Insp. Comp.: if applicable
Insp.#: Tonnage:
COMMENTS:
KELLY SWIVEL OK REPAIR N/A 1. Bail
2. Pins on bail
3. Gooseneck
4. Upper kelly cock
5. Thread condition on kelly cock
Make: Model:
Serial #:
Inspection Date:
Equip.#:
Insp. Comp.: if applicable
Insp.#: Tonnage:
COMMENTS:
POWER SWIVEL OK REPAIR N/A 1. Track condition
2. Pins for track
3. Safety connections inside track
4. Crown hanger
5. Links on top drive
6. Pins for balls
7. Upper kelly cock
8. Thread condition on kelly cock
9. Safety chains for hoses
10. Gooseneck
Make: Model:
Serial #:
Inspection Date:
Equip.#:
Insp. Comp.: if applicable
Insp.#: Tonnage:
COMMENTS:
DRAWWORKS BRAKE LOAD PATH COMPONENTS MAIN DRUM: EXTERNAL COMPONENT OK REPAIR N/A 1. Brake bands
2. Brake handle
3. Brake handle locking mechanism
4. Brake linkage components:
− Welded external lugs
− Linkage arm
− Drawworks input lug
− Bearing blocks− Washers/cotter pins or pin
connections
MAIN DRUM: EXTERNAL COMP. - CONTINUED OK REPAIR N/A − Pins
− Pinholes in lugs
− Threaded connections
5. Auxiliary brake or equivalent
6. Any other load bearing mechanical brake
COMMENTS:
MAIN DRUM: INTERNAL COMPONENT OK REPAIR N/A 1. Brake bands
2. Brake links - welded
3. Brake links – solid
4. Brake turnbuckles
5. Brake equalizer
6. Threaded connections
7. Pins
8. Pinholes in lugs
9. Brake block wear
10. Flange condition
11. Threaded connections
COMMENTS:
SANDLINE DRUM: EXTERNAL COMPONENT OK REPAIR N/A 1. Brake bands
2. Welded external lugs
3. Linkage arm
4. Drawworks input lug
5. Bearing blocks
6. Washers/cotter pins or pin connections
7. Pins
8. Pinholes in lugs
9. Threaded connections
COMMENTS:
SANDLINE DRUM: INTERNAL COMPONENT OK REPAIR N/A 1. Brake bands
2. Brake links - welded
3. Brake links – solid
4. Brake turnbuckles
5. Brake equalizer
6. Threaded connections
7. Pins
8. Pinholes in lugs
9. Brake block wear
10. Flange condition
CARRIER MOUNTED EQUIPMENT FREE STANDING PACKAGES OK REPAIR N/A 1. Off Drillers side main beam
2. Load line lugs
3. Turnbuckle lug weld
4. Drillers side main beam
5. Cross member connection
6. Turnbuckle pin connection
COMMENTS:
A-LEGS OK REPAIR N/A 1. Pin condition
2. Frame
3. Threaded legs
COMMENTS:
HEADACHE RACK OK REPAIR N/A 1. Tie down
2. Rack structure
COMMENTS:
OUTRIGGERS OK REPAIR N/A 1. Pins and lugs (outrigger to carrier)
2. Frame condition
3. Frame welds
4. Guy line lugs
5. Spreader bar condition
6. Screw jack condition
7. All keeper pins and chains
8. Belly jack condition
9. Belly jack attachment points
10. Mat condition
COMMENTS:
CYLINDER MOUNTS OK REPAIR N/A 1. Raising ram condition
2. Raising ram connection
COMMENTS:
DEADLINE ANCHORS (IF APPLICABLE) OK REPAIR N/A 1. Drill line anchor bolts
2. Drill line anchor welds
COMMENTS:
LEVEL III INSPECTION COMPLETION
This Level III Inspection been logged in the Overhead Equipment Log Book
This Level III Inspection was done in accordance with CAODC RP’s: 3.0, 4.0, 10.0 and 11.0
Inspector’s Signature:
Field Superintendent’s Signature:
Estimated Completion Date For All Repairs:
COMMENTS: