World Trade Tower 3,

October, 2014

Reyes Hernandez

Case Study: Flexim Measured Fuel Oil @ Tower 3

2

Agenda

Customer and Case1

Application Description2

FLEXIM Solution3

Customer Benefits4

3

World Trade Tower # 3

� Jacobs Engineering is in charge of commissioning the Electrical Backup system of

the World Trade Center Complex.

� The Backup system consists of eight (8) Generators that run on Fuel oil #2 (can also

run on Diesel)

� The Generator are located on the 4th Floor of Tower # 3.

4

4th Floor Generator Station

5

World Trade Tower # 3

System Layout:

• 3 Large Main Tanks store all of the Fuel Oil. These are located in the basement.

6

System Layout:

• Fuel is pumped from the Main Tanks to Day Tanks.

• Day Tanks as located in a catwalk above the Generators

7

Agenda

Customer and Case1

Application Description2

FLEXIM Solution3

Customer Benefits4

8

Application - Customer Motivation

Task:

•Jacobs needs Flexim to Identify Volume Flow Rate of fuel oil entering and leaving each

Generator & other locations.

9

Agenda

Customer and Case1

Application Description2

FLEXIM Results3

Customer Benefits4

10

FLEXIM Results

• Flexim had installed 15 Dual Channel

meters through the site.

• All 8 Generator’s Supply and Return

lines were all measured simultaneously

Transducer Location

(supply)

• The average flow rate measured on

Generator supply lines was 2.3 Gpm

much less that the required 3.5 Gpm.

11

FLEXIM Results

Typical Results of Generators 1-7 during intermittent runs.

12

FLEXIM Results

Heavy aeration was also present in the supply line of Generator #8.

13

FLEXIM Results

Air bubbles at one point became visible through the glass Fuel Filter/separator.

This confirmed that the Flexim results were accurate.

14

FLEXIM Results

In the basement, Flexim meter revealed that the

first three pipes to the left were heavily

Aerated and most of the fuel flowed through the

4th pipe (to the right).

15

FLEXIM Results

� The main fuel line would provide

constant flow of fuel for 30 seconds

before it chocked out. The drop in

Gpm’s was displayed on the Flexim

meter.

Transducers on main fuel supply line

16

Agenda

Customer and Case1

Application Description2

FLEXIM Solution3

Customer Benefits4

17

Customer Satisfaction

� The dual filter compartment was

taken apart. It was clogged with

debris.

� The decision to remove the

Foot valve from main tank

was due to the Flexim

readings

� It became evident that the

valve screen was clogged

with debris

18

Customer Satisfaction

� System was enhanced to address issues detected by Flexim (ex. installed valves,

pressure gages etc.)

� Jacobs and the Engineering team had a clear insights into the problems plaguing the

performance of the system.

� Main pumps were prevented from being damaged.

� Generators were prevented from being damaged.

� Downtime was significantly reduced. Saving time and money.

Additionally:

� Customer was so happy, that they are looking to purchase Flexim portable flow

meters.