CBE / MET 433. 20 April 2012. Statistical Process Control. World Class Quality (Shewhart..1960). “On-Target with Minimum Variance.” Operating “On-Target” requires a different way of thinking about our processes. - PowerPoint PPT Presentation

transcript

CBE / MET 433 20 April 2012

1

Statistical Process Control

World Class Quality (Shewhart..1960)

• “On-Target with Minimum Variance.”• Operating “On-Target” requires a different way of

thinking about our processes.• Operating with “Minimum Variance” is achieved

only when a process displays a reasonable degree of statistical control.

“Good Parts” vs “Bad Parts”

2

World Class Quality (Shewhart..1960)

• “On-Target with Minimum Variance.”• Operating “On-Target” requires a different way of

thinking about our processes.• Operating with “Minimum Variance” is achieved

only when a process displays a reasonable degree of statistical control.

“Good Parts” vs “Bad Parts”

3

4

World Class Quality (Shewhart..with an in-control process)

MAKE PACK SHIP

5

World Class Quality (Shewhart..w/in-control process)

MAKE PACK SHIP

Challenges:

Examples from industry:• Polymer gum in fiberpac• Corn sweetener

“Crystal Clear”

Shewhart: “While every process displays variation, some processes display controlled variation while others display uncontrolled variation.”

• Controlled Variation: Stable, consistent pattern of variation over time. “Chance” causes.

6

7

Shewhart: “While every process displays variation, some processes display controlled variation while others display uncontrolled variation.”

• Controlled Variation: Stable, consistent pattern of variation over time. “Chance” causes.

• Uncontrolled Variation: Pattern of variation that changes over time. “Assignable” causes.

8

9

Shewhart: “While every process displays variation, some processes display controlled variation while others display uncontrolled variation.”

• Controlled Variation: Stable, consistent pattern of variation over time. “Chance” causes.

• Uncontrolled Variation: Pattern of variation that changes over time. “Assignable” causes.

Shewhart: “A phenomenon will be said to be controlled when, through the use of past experience, we can predict, at least within limits, how the phenomenon may be expected to vary in the future.”

10

Statistical Control

• Predictability• Use statistics to highlight uncontrolled

variations• Eliminate uncontrolled variationsNext: Control Charts as a way to see uncontrolled variations.

11

Statistical Measures

• Location: What can we use?

• Dispersion: What can we use?

12

Statistical Measures

• Location: What can we use?

• Dispersion: What can we use?

Look at example (Camshaft Bearings)

13

= 1.375146 = 1.374978 = 1.374820X R = 0.00080 = 0.000750 = 0.00120 S = 0.0001697 = 0.0001697 = 0.0003576

14

15

Controlled Variation

16

Subgroups used (4-5)

Reason: use of mean tends to normalize information (distribution of the subgroup average)

Shewhart: pick subgroups to organize the data into a rational manner.

Uncontrolled Variation

17

Gather 20 – 30 subgroups before calculating the control limits