OFFICE OF STRUCTURES STRUCTURAL DETAIL MANUAL
Chapter 02 - Substructure
SECTION 01
DRAINAGE (SUB-DR)
1
If inlets are required at each side of bridge, and
distance between inlets is less than 60’, then cross
pipe shall be considered with outlet used on
lower inlet. If length is greater than 60’ or it would
be more ecomonical to provide a separate outlet
its own outlet pipe, etc. For details see sht. 2 of 2.
Secure traffic barrier thrie beam
to end posts as per SHA Standard
for pipes less than 60’, then each inlet shall have
Runoff Flow
Runoff Flow
L of
Roadway
c
Roadway
Pavement
End of End Post
Portion of shoulder to
remain as called for on
typical highway section.
PLAN
Scale: 1’’ = 20’-0’’
DRAINAGE INLETAT END OF BRIDGE STRUCTURE
(OPEN APPROACH ROADWAY)
Payment for Drainage Inlet at End of Bridge
Open Approach Roadway is defined as a highway
with full shoulders, no curbed sections, sidewalks
and/or raised medians.
Traffic barrier posts shall be driven
prior to placing concrete gutter pan
except if option above is utilized.
See sheet 2 of 2 for additional
details.
Notes:
1.
2.
3.
4.
5.
Structure shall be on an each basis. Cost for entire
2
DATE:
STATE HIGHWAY ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
STATE OF MARYLAND
SHEET OF
APPROVAL
Precast Standard
Type E Combination
Inlet, Elevation to be
established in the
field. See SHA Std.
MD-374.74.
(Curb, shown shaded, shall be
poured monolithically with end
post. No joint allowed.)
District Engineer shall have option of requiring
sockets, placing posts, and filling with 9’’+ of grout,
(grout in accordance with Standard Specification
Section 902.11) sloped to drain, as second stage
construction.
MD-605.41, 605.41-01, 605.41-02, 605.51
and 605.51-01.
See note on General Plan and
Elevation as to which ends of
structure will require inlets.
Offset Bracket
Cross Pipe 18’’
Reinforced Concrete
Pipe, Class IV. For
bedding requirements
see Section 303.03.02.
installation of hatched area, curb and gutter, inlet,
Outlet pad will be paid for separately.
section shall be incidental to the unit cost of inlet.
etc. Cross pipe, outlet pipe, elbows and concrete end
OFFICE OF STRUCTURES
DIRECTOR
OFFICE OF STRUCTURES
SUB-DR-101
SU
BS
TR
UC
TU
RE
- DR
AIN
AG
E
VERSION
DETAIL NO.
1.0
01-30-2007
DRAINAGE INLETAT END OF BRIDGE STRUCTURE
(OPEN APPROACH ROADWAY)
Pipe should empty onto
new or existing slope
protection. If not feasible,
provide a 4’x 4’x 4’’
outlet block of Mix. No.1
Concrete or Class I Riprap.
This side of pad to be
built up to dissipate flow.
This angle shall
be determined
in the field.
A
AControl
Joint
2’-
0’’
3’-
0’’
8’-0’’
L of c
Inlet
Modified Type A Combination Curb
and Gutter; Gutter Pan shall be
as shown hatched, 9’’ in depth.
Single hatched area shall be sloped
Double hatched area to be sloped
to follow shoulder configuration.
at 10%, see Section A-A.
2 2
Scale: 1/8 ’’ = 1’-0’’
PLAN OF INLET AREA
Shoulder
Shoulder Cross Slope10%
3’-0’’ Varies
9’’ Gutter Pan
SECTION A-A
Scale: 1/4 ’’ = 1’-0’’
38’-6’’
DATE:
STATE HIGHWAY ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
STATE OF MARYLAND
SHEET OF
APPROVAL
5’-
6’’
End of End Post
Rear face
of backwall.
2’-0’’
2 - #5 bars epoxy
coated, 5’-6’’ long
bent as shown placed
in end post and curb.
(Curb, shown shaded, shall be poured
monolithically with end post see
reinforcing detail below. No joint allowed.)
Outlet pipe - 18’’
Reinforced Concrete
Pipe, Class IV, with
Std. Concrete End
Section (MD 368.01).
OFFICE OF STRUCTURES
DIRECTOR
OFFICE OF STRUCTURES
SUB-DR-101
SU
BS
TR
UC
TU
RE
- DR
AIN
AG
E
1.0
VERSION
DETAIL NO.
01-30-2007
APPROVAL
DIRECTOR
OFFICE OF STRUCTURES
DATE:
VERSION
STATE HIGHWAY ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
STATE OF MARYLAND
OFFICE OF STRUCTURES
DETAIL NO. SHEET OF1 4
Notes:
Minimum slope of Pipe Underdrain Outlets is ‚''/ft.
ELEVATION VIEW
PLAN
AA
15' (Typical)+-
Drain in each
direction from
midpoint @ ‚''/ft.
slope (Typ.)
Scale: ‘'' = 1'-0''
Drain ‚'' /ft. slo
pe
Drain ‚'' /ft. slo
pe
PLAN VIEW
To be used for all fixed abutments or expansion abutments
with lengths contributing to expansion less than or equal to
70 feet.
wing wall
underdrain behind
6'' perforated PVC
abutment
underdrain behind
6'' perforated PVC
wing wall
behind
underdrain
90° bend from
6'' PVC pipe
6'' + length
wall.
outletted directly through the wing
behind the abutment. They can be
independent of the drainage system
drainage system behind them may be
For wing walls over 15 ft. long, the
be slightly higher.
drainage system behind the wing wall
of pipe. This will necessitate the
abutment using 2 - 90° bends and a short length
connected to the drainage system behind the
The drainage system behind each wing wall can be
For Section A-A see Sheet No. 2, 3 or 4
All joints glued.
Note:
that underdrain is composed of.
Plug ends of pipes with same material
pipe underdrain (typ.)
6'' Perforated PVC circular
protection or finished ground
abutment onto the slope
Outlet as shown through the
7.
6.
5.
4.
3.
2.
1.
SU
BS
TR
UC
TU
RE -
DR
AIN
AG
ESUB-DR-201
EQUAL TO 70 FEETCONTRIBUTING TO EXPANSION LESS THAN OR
FIXED BEARINGS OR EXPANSION BEARINGS WITH LENGTHSDRAINAGE SYSTEM AND BACKFILL FOR ABUTMENTS WITH
90° bend
-
SUB-DR-203.
For section through wing wall, see Detail No.
will be incidental to the Substructure Concrete item.
The cost of the PVC underdrains complete in place
1.0
10/02/2014
APPROVAL
DIRECTOR
OFFICE OF STRUCTURES
DATE:
VERSION
STATE HIGHWAY ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
STATE OF MARYLAND
OFFICE OF STRUCTURES
DETAIL NO. SHEET OF2 4
SE
CTIO
N
A-
A
6'' N
on-Perf
orate
d
PV
C
Cir
cular
Pip
e
Underdrain
Outlet,
#5
@ 1'-6'' c/c
Scale: ‚'' = 1'-0''
Protectio
n
Slo
pe
1'-6'' c/c
co
uple
r at
re
bar do
wel
#5
Threade
d
Pip
e
Underdrain
6'' P
erf
orate
d
PV
C
Cir
cular
No. 1
or better)
Co
ncrete
Base (Mix
base
aggregate
Graded
Pave
me
nt
Approach
Road
way
‚'' / ft.
and
win
g
walls at
to
ward abut
me
nt
Slo
pe to
drain
ta
mpe
d in co
nf
or
mance
wit
h
Sectio
n 210
Poro
us backfill pla
ce
d and
in 6'' lifts in co
nf
or
mance
wit
h
Sectio
n 501.
Grade
d aggre
gate
base to
be
pla
ce
d and co
mpacte
d
as sho
wn
#5's space
d
will b
e all
owe
d f
or this o
ptio
n.
be eli
min
ate
d.
No additio
nal c
om
pe
nsatio
n
to rest o
n to
p of f
ootin
g, the reinf
orcin
g can
If
1'-6'' width of the co
ncrete
base is po
ure
d
poro
us backfill a
nd approach e
mbank
me
nt
Pla
ce
Cla
ss
SD
Ty
pe I I n
on
wo
ve
n ge
ote
xtile
bet
wee
n
Cost to
be in
cid
ental t
o the
pavin
g it
ems.
Cla
ss
SD
Ty
pe I no
nw
ove
n ge
ote
xtile.
the
pertin
ent
Structure
Co
ncrete it
ems.
re
mo
ve
d.
The re
mo
ve
d
material will b
e in
cid
ental to
pave
me
nt
Botto
m
of
Co
ncrete It
ems.
will
be in
cid
ental to the
pertin
ent
Structure
The cost of the
ge
ote
xtile
wit
hin the li
mit
s sho
wn
Slo
pe ‚'' / ft.
SUB-DR-201
LESS THAN OR EQUAL TO 70 FEETBEARINGS WITH LENGTHS CONTRIBUTING TO EXPANSION
(PEDESTAL) WITH FIXED BEARINGS OR EXPANSIONDRAINAGE SYSTEM AND BACKFILL FOR ABUTMENTS
SU
BS
TR
UC
TU
RE -
DR
AIN
AG
E
Varie
s - 1'-4'' Min.
30'-
0'' M
ax. (m
easure
d alo
ng
L approach road
way)
c
2'-
0''
1
2
1.
2.
Notes:
as sho
wn be
hin
d the abut
me
nt and to the sa
me
ge
om
etric
s be
hin
d the abut
me
nt
win
g
walls
whe
n
The
Co
ntractor
must pro
vid
e a
well co
mpacte
d
surface to
pla
ce the
ge
ote
xtile and sto
ne fill
again
st. In fill areas it
will b
e
necessary to
overfill
a sufficie
nt distance so that a
well co
mpacte
d
surface
will b
e
pro
duce
d
whe
n the
overfill is
3.
4.
2'-0'' min.
3''
Slo
pe as stee
p as gro
und
will all
ow (T
yp.) 1 : 2
maxim
um
Slo
pe
2'' / ft.
Da
mppro
of
*
*
the
y
parallel t
he
hig
hway. (S
ee sheet 5 of
5)
Poro
us backfill (refer to
Sectio
n 469) shall
be
pla
ce
d
6''
*
1.0
10/02/2014
3
DATE:
STATE HIGHWAY ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
STATE OF MARYLAND
SHEET OF
APPROVAL
SE
CT
ION
A-A
#5 T
hre
aded
rebar
dow
el
co
up
ler a
t
1’-
6’’
c/c
6’’
P
erf
ora
ted P
VC
Cir
cula
r
Pip
e U
nd
erd
rain
Vari
es -
1’-
4’’
Min
.
30
’-0
’’ M
ax
. (m
easu
red
alo
ng
L a
pp
roach
ro
ad
way
)c
2’-
0’’
Slo
pe a
s s
teep a
s g
round
wil
l all
ow
(T
yp
.) 1
: 2
max
imu
m1
2
1.
2.
No
tes:
as s
how
n b
ehin
d t
he a
butm
ent
and t
o t
he s
am
e
geo
metr
ics b
eh
ind
th
e a
bu
tmen
t w
ing
wall
s w
hen
Th
e C
on
tracto
r m
ust
pro
vid
e a
well
co
mp
acte
d
su
rface t
o p
lace t
he g
eo
tex
tile
an
d s
ton
e f
ill
again
st.
In f
ill
areas i
t w
ill
be n
ecessary t
o o
verfil
l
a s
uffic
ient
dis
tance s
o t
hat
a w
ell
com
pacte
d
su
rface w
ill
be p
ro
du
ced
wh
en
th
e o
verfil
l is
3.
4.
2’-0’’ min.
Graded
aggregate
base
3’’
6’’
N
on-P
erf
ora
ted P
VC
Cir
cula
r P
ipe U
nderd
rain
Ou
tlet,
Slo
pe
1/4
’’
/ ft
.
Slo
pe 2
’’ /
ft.
Appro
ach R
oadw
ay
Pav
em
en
t
Dam
ppro
of
Slo
pe t
o d
rain
to
ward
ab
utm
en
t
an
d w
ing
wall
s a
t 1
/4 ’
’ /
ft.
4.
*
**th
ey p
arall
el
the h
ighw
ay. (S
ee s
heet
5 o
f 5
)
#5
@ 1
’-6
’’ c
/c
Poro
us b
ackfi
ll pla
ced a
nd
tam
ped
in
co
nfo
rm
an
ce w
ith
Secti
on
21
0
Porous b
ackfil
l (
refer t
o S
ecti
on 4
69) s
hall
be p
laced
Grad
ed
ag
greg
ate
base t
o b
e p
laced
an
d c
om
pacte
d
in 6
’’ l
ifts
in c
onform
ance w
ith S
ecti
on 5
01.
#5’s
spaced
as s
how
n
*If 1
’-6
’’ w
idth
of t
he c
on
crete
base i
s p
ou
red
to r
est
on
to
p o
f f
oo
tin
g,
the r
ein
fo
rcin
g c
an
be e
lim
inate
d. N
o a
ddit
ional
com
pensati
on
wil
l b
e a
llo
wed
fo
r t
his
op
tio
n.
Cla
ss S
D T
yp
e I
n
on
wo
ven
geo
tex
tile
.
Cost
to b
e i
ncid
enta
l t
o t
he p
avin
g i
tem
s.
Pla
ce C
lass S
D T
ype I
I nonw
oven g
eote
xti
le b
etw
een
poro
us b
ackfi
ll and a
ppro
ach e
mbankm
ent
OFFICE OF STRUCTURES
DIRECTOR
OFFICE OF STRUCUTRES
Slo
pe p
rote
cti
on
Co
ncrete
base
(Mix
No
. 1
or
bett
er)
DRAINAGE SYSTEM AND BACKFILL FOR ABUTMENTS(SEMI-CANTILEVER) WITH FIXED BEARINGS OR EXPANSIONBEARINGS WITH LENGTHS CONTRIBUTING TO EXPANSION
LESS THEN OR EQUAL TO 70 FEET
4
Sca
le:
1/4
’’
= 1
’-0
’’re
mo
ved
. T
he r
em
ov
ed
mate
rial
wil
l b
e i
ncid
en
tal
to
the p
erti
nent
Str
uctu
re C
oncrete
ite
ms.
6’’
Bott
om
of
pavem
ent
SUB-DR-201
SU
BS
TR
UC
TU
RE
- DR
AIN
AG
E
Th
e c
ost
of t
he g
eo
tex
tile
wit
hin
th
e l
imit
s s
ho
wn
wil
l be i
ncid
enta
l to
the p
erti
nent
Str
ucutr
e
Co
ncre
te I
tem
s.
1.0
VERSION
DETAIL NO.
10-02-2014
4
DATE:
STATE HIGHWAY ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
STATE OF MARYLAND
SHEET OF
APPROVAL
SE
CT
ION
A-A
Vari
es -
1’-
4’’
Min
.
6’’
P
erf
ora
ted P
VC
Cir
cula
r
Pip
e U
nd
erd
rain
30
’-0
’’ M
ax
. (m
easu
red
alo
ng
L a
pp
roach
ro
ad
way
)c
2’-
0’’
Slo
pe a
s s
teep a
s g
round
wil
l all
ow
(T
yp
.) 1
: 2
max
imu
m1
2
1.
2.
No
tes:
as s
how
n b
ehin
d t
he a
butm
ent
and t
o t
he s
am
e
geo
metr
ics b
eh
ind
th
e a
bu
tmen
t w
ing
wall
s w
hen
Th
e C
on
tracto
r m
ust
pro
vid
e a
well
co
mp
acte
d
su
rface t
o p
lace t
he g
eo
tex
tile
an
d s
ton
e f
ill
again
st.
In f
ill
areas i
t w
ill
be n
ecessary t
o o
verfil
l
a s
uffic
ient
dis
tance s
o t
hat
a w
ell
com
pacte
d
su
rface w
ill
be p
ro
du
ced
wh
en
th
e o
verfil
l is
3.
4.
2’-0’’ min.
Graded
aggregate
base
3’’
Slo
pe 2
’’ /
ft.
6’’
N
on-P
erf
ora
ted P
VC
Cir
cula
r P
ipe U
nderd
rain
Ou
tlet,
Slo
pe
1/4
’’
/ ft
.
Appro
ach R
oadw
ay
Pav
em
en
t
Dam
ppro
of
Slo
pe t
o d
rain
tow
ard
ab
utm
en
t an
d w
ing
wall
s
at
1/4
’’
/ ft
.
4.
* **
they p
arall
el
the h
ighw
ay. (S
ee s
heet
5 o
f 5
)
#5
@ 1
’-6
’’ c
/c
Poro
us b
ackfi
ll pla
ced a
nd
tam
ped
in
co
nfo
rm
an
ce w
ith
Secti
on
21
0
Porous b
ackfil
l (
refer t
o S
ecti
on 4
69) s
hall
be p
laced
Grad
ed
ag
greg
ate
base t
o b
e p
laced
an
d c
om
pacte
d
in 6
’’ l
ifts
in c
onform
ance w
ith S
ecti
on 5
01.
#5’s
spaced
as s
how
n
*If 1
’-6
’’ w
idth
of t
he c
on
crete
base i
s p
ou
red
to r
est
on
to
p o
f f
oo
tin
g,
the r
ein
fo
rcin
g c
an
be e
lim
inate
d. N
o a
ddit
ional
com
pensati
on
wil
l b
e a
llo
wed
fo
r t
his
op
tio
n.
Pla
ce C
lass S
D T
ype I
I nonw
oven
geo
tex
tile
betw
een
po
ro
us b
ack
fil
l
and a
ppro
ach e
mbankm
ent
Cla
ss S
D T
yp
e I
n
on
wo
ven
geo
tex
tile
.
Cost
to b
e i
ncid
enta
l t
o t
he p
avin
g i
tem
s.
OFFICE OF STRUCTURES
DIRECTOR
OFFICE OF STRUCUTRES
Co
ncre
te b
ase
(Mix
No
. 1
or
bett
er)
Fin
ished
gro
undli
ne
#5 T
hre
aded
rebar
dow
el
co
up
ler a
t
1’-
6’’
c/c
DRAINAGE SYSTEM AND BACKFILL FOR ABUTMENTS(FULL CANTILEVER) WITH FIXED BEARINGS OR EXPANSIONBEARINGS WITH LENGTHS CONTRIBUTING TO EXPANSION
LESS THEN OR EQUAL TO 70 FEET
4
Sca
le:
1/4
’’
= 1
’-0
’’
rem
ov
ed
. T
he r
em
ov
ed
mate
rial
wil
l b
e i
ncid
en
tal
to
the p
erti
nent
Str
uctu
re C
oncrete
ite
ms.
6’’
Bott
om
of
pavem
ent
SUB-DR-201
SU
BS
TR
UC
TU
RE
- DR
AIN
GE
Th
e c
ost
of t
he g
eo
tex
tile
wit
hin
th
e l
imit
s s
ho
wn
wil
l be i
ncid
enta
l to
the p
erti
nent
Str
uctu
re
Co
ncre
te I
tem
s.
1.0
VERSION
DETAIL NO.
10-02-2014
APPROVAL
DIRECTOR
OFFICE OF STRUCTURES
DATE:
VERSION
STATE HIGHWAY ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
STATE OF MARYLAND
OFFICE OF STRUCTURES
DETAIL NO. SHEET OF1 4
Notes:
1.
2.
4.
Minimum slope of Pipe Underdrain Outlets is ‚''/ft.
3.
6.
5.
wing wall.
be outletted directly through the
system behind the abutment. They shall
shall be independent of the drainage
The drainage system behind wing walls
For Section A-A see Sheet No. 2, 3 or 4
expansion cross beam is called for.
To be used for all expansion abutments where an
PLAN
AA
15' (Typical)+-
Drain in each
direction from
midpoint @ ‚''/ft.
slope (Typ.)cL Expansion
joint cross
beam support
columns (typ.)
Note:
The expansion joint cross
beam is not shown for clarity.
Minimum of one outlet
pipe for each wing wall
Scale: ‘'' = 1'-0''
that underdrain is composed of.
Plug ends of pipes with same material
pipe underdrain (typ.)
6'' Perforated PVC circular
protection or finished ground
abutment onto the slope
Outlet as shown through the
EXPANSION GREATER THAN 70 FEETEXPANSION BEARINGS WITH LENGTHS CONTRIBUTING TO
BACKFILL FOR ABUTMENTS WITHDRAINAGE SYSTEM AND
SU
BS
TR
UC
TU
RE -
DR
AIN
AG
ESUB-DR-202
1.0
10/02/2014
Detail No. SUB-DR-203.
For section through wing wall, see
to the Substructure Concrete item.
complete in place will be incidental
The cost of the PVC underdrains
SE
CT
ION
A-A
Slo
pe
Pro
tecti
on
#5 T
hre
aded
rebar
dow
el
co
up
ler a
t
1’-
6’’
c/c
6’’
P
erf
ora
ted P
VC
Cir
cula
r
Pip
e U
nd
erd
rain
Concre
te B
ase (
Mix
No. 1 o
r bett
er)
30
’-0
’’ M
ax
. (m
easu
red
alo
ng
L a
pp
roach
ro
ad
way
)c
2’-
0’’
1
2
1.
2.
No
tes:
as s
how
n b
ehin
d t
he a
butm
ent
and t
o t
he s
am
e
geo
metr
ics b
eh
ind
th
e a
bu
tmen
t w
ing
wall
s w
hen
Th
e C
on
tracto
r m
ust
pro
vid
e a
well
co
mp
acte
d
su
rface t
o p
lace t
he g
eo
tex
tile
an
d s
ton
e f
ill
again
st.
In f
ill
areas i
t w
ill
be n
ecessary t
o o
verfil
l
a s
uffic
ient
dis
tance s
o t
hat
a w
ell
com
pacte
d
su
rface w
ill
be p
ro
du
ced
wh
en
th
e o
verfil
l is
3.
4.
2’-0’’ min.
Graded
aggregate
base
Appro
ach R
oadw
ay
Pav
em
en
t
3’’
6’’
N
on-P
erf
ora
ted P
VC
Cir
cula
r
Pip
e U
nderd
rain
Outl
et,
Slo
pe 1/4
’’
/ ft
.
Slo
pe a
s s
teep a
s g
round
wil
l all
ow
(T
yp
.) 1
: 2
max
imu
m
Slo
pe 2
’’ /
ft.
Dam
ppro
of
Slo
pe t
o d
rain
tow
ard
ab
utm
en
t
an
d w
ing
wall
s a
t
1/4
’’
/ ft
.
*
*
*
*
they p
arall
el
the h
ighw
ay. (S
ee s
heet
5 o
f 5
)
#5
@ 1
’-6
’’ c
/c
Porous b
ackfil
l (
refer t
o S
ecti
on 4
69) s
hall
be p
laced
Grad
ed
ag
greg
ate
base t
o b
e p
laced
an
d c
om
pacte
d
in 6
’’ l
ifts
in c
onform
ance w
ith S
ecti
on 5
01.
#5’s
spaced
as s
how
n
If 1
’-6
’’ w
idth
of t
he c
on
crete
base i
s p
ou
red
to r
est
on
to
p o
f f
oo
tin
g,
the r
ein
fo
rcin
g c
an
be e
lim
inate
d. N
o a
ddit
ional
com
pensati
on
wil
l b
e a
llo
wed
fo
r t
his
op
tio
n.
Pla
ce C
lass S
D T
ype I
I nonw
oven g
eote
xti
le b
etw
een
poro
us b
ackfi
ll and a
ppro
ach e
mbankm
ent
Cla
ss S
D T
yp
e I
n
on
wo
ven
geo
tex
tile
.
Cost
to b
e i
ncid
enta
l t
o t
he p
avin
g i
tem
s.
Expansio
n j
oin
t cro
ss b
eam
Backw
all
Expansio
n j
oin
t cross
beam
support
colu
mns
Sca
le:
1/4
’’
= 1
’-0
’’
rem
ov
ed
. T
he r
em
ov
ed
mate
rial
wil
l b
e i
ncid
en
tal
to
the p
erti
nent
Str
uctu
re C
oncrete
ite
ms.
Vari
es -
1’-
4’’
Min
., f
ull
len
gth
betw
een
co
lum
ns
DATE:
STATE HIGHWAY ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
STATE OF MARYLAND
SHEET OF
APPROVAL
OFFICE OF STRUCTURES
DIRECTOR
OFFICE OF STRUCUTRES
42
Bott
om
of
pavem
ent
SUB-DR-202
SU
BS
TR
UC
TU
RE
- DR
AIN
AG
E
DRAINAGE SYSTEM ANDBACKFILL FOR ABUTMENTS (PEDESTAL) WITH
EXPANSION BEARINGS WITH LENGTHS CONTRIBUTING TOEXPANSION GREATER THAN 70 FEET
Th
e c
ost
of t
he g
eo
tex
tile
wit
hin
th
e l
imit
s s
ho
wn
wil
l be i
ncid
enta
l to
the p
erti
nent
Str
uctu
re
Co
ncre
te I
tem
s.
Po
rou
s b
ack
fill
(s
ho
wn
sh
ad
ed
) p
laced
an
d
tam
ped
in
co
nfo
rm
an
ce w
ith
Secti
on
21
0
1.0
VERSION
DETAIL NO.
10-02-2014
STATE HIGHWAY ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
STATE OF MARYLAND
SHEET OF
APPROVAL
SE
CT
ION
A-A
#5 T
hre
aded
rebar
dow
el
couple
r a
t
1’-
6’’
c/c
6’’
P
erf
ora
ted
PV
C C
ircu
lar
Pip
e U
nd
erd
rain
30’-
0’’
Max. (m
easure
d a
long L
appro
ach r
oadw
ay)
c
Slo
pe a
s s
teep
as g
ro
un
d
wil
l all
ow
(T
yp
.) 1
: 2
max
imu
m1
2 1.
2.
No
tes:
as s
ho
wn
beh
ind
th
e a
bu
tmen
t an
d t
o t
he s
am
e
geo
metr
ics b
eh
ind
th
e a
bu
tmen
t w
ing
wall
s w
hen
The C
ontr
acto
r m
ust
provid
e a
well
com
pacte
d
surface t
o p
lace t
he g
eote
xti
le a
nd s
tone f
ill
again
st.
In
fil
l a
reas i
t w
ill
be n
ecessary
to
ov
erfil
l
a s
uffic
ient
dis
tance s
o t
hat
a w
ell
com
pacte
d
su
rface w
ill
be p
ro
du
ced
wh
en
th
e o
verfil
l is
3.
2’-0’’ min.
Graded
aggregate
base
3’’
6’’
N
on-P
erf
ora
ted P
VC
Cir
cula
r P
ipe U
nderd
rain
Ou
tlet,
Slo
pe
1/4
’’
/ ft
.S
lope t
o d
rain
tow
ard a
butm
ent
an
d w
ing
wall
s a
t 1
/4 ’
’ /
ft.
*
**th
ey
parall
el
th
e h
igh
way
. (S
ee s
heet
5 o
f 5
)
#5
@ 1
’-6
’’ c
/c
Poro
us b
ackfi
ll pla
ced a
nd
tam
ped
in
co
nfo
rm
an
ce w
ith
Secti
on
21
0
Porous b
ackfil
l (
refer t
o S
ecti
on 4
69) s
hall
be p
laced
Grad
ed
ag
greg
ate
base t
o b
e p
laced
an
d c
om
pacte
d
in 6
’’ l
ifts
in
co
nfo
rm
an
ce w
ith
Secti
on
50
1.
#5’s
spaced
as s
how
n
*If 1
’-6
’’ w
idth
of t
he c
on
crete
base i
s p
ou
red
to r
est
on t
op o
f f
ooti
ng, th
e r
ein
forcin
g c
an
be e
lim
inate
d. N
o a
ddit
ional
com
pensati
on
wil
l b
e a
llo
wed
fo
r t
his
op
tio
n.
Cla
ss S
D T
yp
e I
n
on
wo
ven
geo
tex
tile
.
Cost
to b
e i
ncid
enta
l t
o t
he p
avin
g i
tem
s.
Pla
ce C
lass S
D T
ype I
I nonw
oven g
eote
xti
le b
etw
een
poro
us b
ackfi
ll and a
ppro
ach e
mbankm
ent
OFFICE OF STRUCTURES
Slo
pe p
rote
cti
on
Co
ncrete
base
(Mix
No
. 1
or
bett
er)
Appro
ach R
oadw
ay
Pav
em
en
t
2’-
0’’
Slo
pe 2
’’ /
ft.
Dam
ppro
of
Expansio
n j
oin
t cro
ss b
eam
Backw
all
Ex
pan
sio
n j
oin
t cro
ss
beam
support
colu
mns
Sca
le:
1/4
’’
= 1
’-0’’
4.
rem
ov
ed
. T
he r
em
ov
ed
mate
rial
wil
l b
e i
ncid
en
tal
to
the p
erti
nent
Str
uctu
re C
oncrete
ite
ms.
Vari
es -
1’-
4’’
Min
., f
ull
len
gth
betw
een
co
lum
ns
DATE:
DIRECTOR
OFFICE OF STRUCTURES
Bott
om
of
pavem
ent
DRAINAGE SYSTEM AND BACKFILLFOR ABUTMENTS (SEMI-CANTILEVER) WITH
EXPANSION BEARINGS WITH LENGTHS CONTRIBUTING TOEXPANSION GREATER THAN 70 FEET
3 4SUB-DR-202
SU
BS
TR
UC
TU
RE
- DR
AIN
AG
E
Th
e c
ost
of t
he g
eo
tex
tile
wit
hin
th
e l
imit
s s
ho
wn
wil
l be i
ncid
enta
l to
the p
erti
nent
Str
uctu
re
Co
ncre
te I
tem
s.
1.0
VERSION
DETAIL NO.
10-02-2014
STATE HIGHWAY ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
STATE OF MARYLAND
SHEET OF
APPROVAL
OFFICE OF STRUCTURESDATE:
DIRECTOR
OFFICE OF STRUCTURES
DRAINAGE SYSTEM AND BACKFILL
EXPANSION BEARINGS WITH LENGTHS CONTRIBUTING TOEXPANSION GREATER THAN 70 FEET
4
SE
CT
ION
A-A
6’’
P
erf
ora
ted
PV
C C
ircu
lar
Pip
e U
nd
erd
rain
30’-
0’’
Max. (m
easure
d a
long L
appro
ach r
oadw
ay)
c
Slo
pe a
s s
teep
as g
ro
un
d
wil
l all
ow
(T
yp
.) 1
: 2
max
imu
m1
2
1.
2.
No
tes:
as s
ho
wn
beh
ind
th
e a
bu
tmen
t an
d t
o t
he s
am
e
geo
metr
ics b
eh
ind
th
e a
bu
tmen
t w
ing
wall
s w
hen
The C
ontr
acto
r m
ust
provid
e a
well
com
pacte
d
surface t
o p
lace t
he g
eote
xti
le a
nd s
tone f
ill
again
st.
In
fil
l a
reas i
t w
ill
be n
ecessary
to
ov
erfil
l
a s
uffic
ient
dis
tance s
o t
hat
a w
ell
com
pacte
d
su
rface w
ill
be p
ro
du
ced
wh
en
th
e o
verfil
l is
3.
2’-0’’ min.
Graded
aggregate
base
3’’
6’’
N
on-P
erf
ora
ted P
VC
Cir
cula
r P
ipe U
nderd
rain
Ou
tlet,
Slo
pe
1/4
’’
/ ft
.
Appro
ach R
oadw
ay
Pav
em
en
t
Dam
ppro
of
Slo
pe t
o d
rain
tow
ard
abutm
ent
and w
ing w
all
s
at
1/4
’’
/ ft
.
* **
they
parall
el
th
e h
igh
way
. (S
ee s
heet
5 o
f 5
)
#5
@ 1
’-6
’’ c
/c
Poro
us b
ackfi
ll pla
ced a
nd
tam
ped
in
co
nfo
rm
an
ce w
ith
Secti
on
21
0
Porous b
ackfil
l (
refer t
o S
ecti
on 4
69) s
hall
be p
laced
Grad
ed
ag
greg
ate
base t
o b
e p
laced
an
d c
om
pacte
d
in 6
’’ l
ifts
in
co
nfo
rm
an
ce w
ith
Secti
on
50
1.
#5’s
spaced
as s
how
n
*If 1
’-6
’’ w
idth
of t
he c
on
crete
base i
s p
ou
red
to r
est
on t
op o
f f
ooti
ng, th
e r
ein
forcin
g c
an
be e
lim
inate
d. N
o a
ddit
ional
com
pensati
on
wil
l b
e a
llo
wed
fo
r t
his
op
tio
n.
Pla
ce C
lass S
D T
ype I
I nonw
oven
geo
tex
tile
betw
een
po
ro
us b
ack
fil
l
an
d a
pp
roach
em
ban
km
en
t
Cla
ss S
D T
yp
e I
n
on
wo
ven
geo
tex
tile
.
Cost
to b
e i
ncid
enta
l t
o t
he p
avin
g i
tem
s.
Concre
te b
ase
(Mix
No. 1 o
r
bett
er)
Fin
ished
gro
un
dli
ne
#5 T
hre
aded
rebar
dow
el
couple
r a
t
1’-
6’’
c/c
Slo
pe 2
’’ /
ft.
2’-
0’’
Expansio
n j
oin
t cro
ss b
eam
Backw
all
Ex
pan
sio
n j
oin
t cro
ss
beam
support
colu
mns
Sca
le:
1/4
’’
= 1
’-0’’
4.
rem
ov
ed
. T
he r
em
ov
ed
mate
rial
wil
l b
e i
ncid
en
tal
to
the p
erti
nent
Str
uctu
re C
oncrete
ite
ms.
Vari
es -
1’-
4’’
Min
., f
ull
len
gth
betw
een
co
lum
ns
Bott
om
of
pavem
ent
4SUB-DR-202
SU
BS
TR
UC
TU
RE
- DR
AIN
AG
E
FOR ABUTMENTS (FULL CANTILEVER) WITH
Th
e c
ost
of t
he g
eo
tex
tile
wit
hin
th
e l
imit
s s
ho
wn
wil
l b
e i
ncid
en
tal
to t
he p
erti
nen
t S
tru
cu
tre
Co
ncre
te I
tem
s.
1.0
VERSION
DETAIL NO.
10-02-2014
DATE:
STATE HIGHWAY ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
STATE OF MARYLAND
SHEET OF
APPROVAL
OFFICE OF STRUCTURES
DIRECTOR
OFFICE OF STRUCUTRES
1 1
DRAINAGE SYSTEM AND BACKFILLFOR WING WALLS THAT ARE PARALLEL TO THE HIGHWAY
6’’
P
erf
ora
ted
PV
C C
ircu
lar
Pip
e U
nd
erd
rain
2’-0’’ min.
Graded
aggregate
base
6’’
N
on-P
erf
ora
ted P
VC
Cir
cula
r P
ipe U
nderd
rain
Ou
tlet,
Slo
pe
1/4
’’
/ ft
.
Slo
pe t
o d
rain
tow
ard a
butm
ent
an
d w
ing
wall
s a
t 1
/4 ’
’ /
ft.
**
*
Poro
us b
ackfi
ll pla
ced a
nd
tam
ped
in
co
nfo
rm
an
ce w
ith
Secti
on
21
0
#5
@ 1
’-6
’’ c
/c
1.
2.
No
tes:
The C
ontr
acto
r m
ust
provid
e a
well
com
pacte
d
surface t
o p
lace t
he g
eote
xti
le a
nd s
tone f
ill
again
st.
In
fil
l a
reas i
t w
ill
be n
ecessary
to
ov
erfil
l
a s
uffic
ient
dis
tance s
o t
hat
a w
ell
com
pacte
d
su
rface w
ill
be p
ro
du
ced
wh
en
th
e o
verfil
l is
3.
4.
Porous b
ackfil
l (
refer t
o S
ecti
on 4
69) s
hall
be p
laced
5.
Grad
ed
ag
greg
ate
base t
o b
e p
laced
an
d c
om
pacte
d
in 6
’’ l
ifts
in
co
nfo
rm
an
ce w
ith
Secti
on
50
1.
as s
how
n b
ehin
d t
he a
butm
ent
win
g w
all
s w
hen t
hey
para
llel
the h
ighw
ay.
#5’s
spaced
as s
how
n
#5 T
hre
aded
rebar
dow
el
couple
r a
t
1’-
6’’
c/c
Fin
ished
gro
undli
ne
*If 1
’-6
’’ w
idth
of t
he c
on
crete
base i
s p
ou
red
to r
est
on t
op o
f f
ooti
ng, th
e r
ein
forcin
g c
an
be e
lim
inate
d. N
o a
ddit
ional
com
pensati
on
wil
l b
e a
llo
wed
fo
r t
his
op
tio
n.
Cla
ss S
D T
yp
e I
n
on
wo
ven
geo
tex
tile
.
Cost
to b
e i
ncid
enta
l t
o t
he p
avin
g i
tem
s.
Concre
te b
ase
(Mix
No. 1 o
r
bett
er)
2’-
0’’
Slo
pe a
s s
teep
as g
ro
un
d
wil
l all
ow
(T
yp
.) 1
: 2
max
imu
m1
2
Slo
pe 2
’’ /
ft.
Appro
ach R
oadw
ay
Pav
em
en
t
Dam
ppro
of
Pla
ce C
lass S
D T
ype I
I nonw
oven
geo
tex
tile
betw
een
po
ro
us b
ack
fil
l
an
d a
pp
roach
em
ban
km
en
t
3’’
SE
CT
ION
TH
RO
UG
H W
ING
WA
LL
Vari
es -
1’-
4’’
Min
.
Sca
le:
1/4
’’
= 1
’-0’’
rem
ov
ed
. T
he r
em
ov
ed
mate
rial
wil
l b
e i
ncid
en
tal
to
the p
erti
nent
Str
uctu
re C
oncrete
ite
ms.
Bott
om
of
pavem
ent
SUB-DR-203
SU
BS
TR
UC
TU
RE
- DR
AIN
AG
E
Fo
r b
rid
ges w
ith
win
g w
all
s t
hat
are n
ot
parall
el
to
hig
hw
ay s
ee s
td. no. R
W-3
01 f
or
deta
ils.
The c
ost
of t
he g
eote
xti
le w
ithin
the l
imit
s s
how
n
wil
l b
e i
ncid
enta
l to
the p
erti
nent
Str
uctu
re
Concrete
ite
ms.
1.0
VERSION
DETAIL NO.
10-02-2014