Chm powerpoint

Post on 02-Aug-2015

35 views 0 download

Tags:

transcript

There is still a great deal to do before we can start on the interior of the house, including:

• Removal of the non-historic windows which

were added some 30 - 40 years ago and

re-bricking those areas.

• A new foundation must be poured under the

building.

The Park County Historic Preservation Commission under the direction of Ev Diehl is overseeing this project.

$100,000will finish the exterior and interior,

plus everything we need to OPEN to

the public!

How Can You Help• Donate Money

• Donate Materials

• Promote & Support through your business by helping with donation

gathering & awareness